Wage Determination.pdf
PDF 107 KB Posted
- Attached to
- Install Tile, Fac 1712
- Solicitation number
- FA4877-11-R-0018
About this file
Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA4877-11-R-0018 Ammendment 01.pdf | ||
| SOW.pdf | ||
| FA4877-11-R-00018.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: AZ100001 06/17/2011 AZ1
Superseded General Decision Number: AZ20080001
State: Arizona
Construction Type: Building
Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma
Counties in Arizona.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 03/12/2010
1 06/04/2010
2 07/02/2010
3 07/09/2010
4 07/23/2010
5 08/06/2010
6 08/27/2010
7 09/10/2010
8 10/15/2010
9 11/05/2010
10 11/19/2010
11 12/03/2010
12 01/21/2011
13 02/04/2011
14 04/01/2011
15 04/08/2011
16 04/15/2011
17 05/13/2011
18 06/17/2011
BRAZ0003-003 11/23/2009
COCONINO, MARICOPA, MOHAVE, PINAL (Area West and North of the
San Francisco River to the Gila River), & YUMA COUNTIES
Rates Fringes
Bricklayer - Cement Block
Layer............................$ 24.62 4.57
BRAZ0003-008 11/23/2009
PIMA AND PINAL (Area East and South of the San Francisco River to the Gila River) COUNTIES
Bricklayer - Cement Block
Layer............................$ 18.00 4.49
CARP0408-001 07/01/2009
CARPENTER........................$ 23.00 7.24
CARP1327-001 01/01/2010
DRYWALL HANGER...................$ 19.25 6.61
ELEC0570-003 12/01/2010
PIMA, PINAL (Southern Part), AND YUMA COUNTIES
Electrician/Wireman..............$ 22.90 18%+4.70
Zone Definitions
(b) ZONE PAY -Workmen employed in Zones B and C shall be paid
Zone Pay as follows:
Zone B............an additional $ 1.25 per hour
Zone C............an additional $ 3.75 per hour
SECTION 3.05 ZONES
(a) Zones shall be created in Tucson, Arizona, the headquarters of the Union. Zones may be established in other localities by mutual consent of the parties hereto
(Section 1.03). Zones and the applicable rates of pay shall be the same for all Employers coming under the terms of this Agreement.
In Tucson, Zone A shall be the area within a twenty-nine (29) mile radius from a basing point at the City Hall.
Zone B shall be the area from the outer limits of the twenty-nine (29) mile radius, extending out another seventeen (17) miles (a 46 mile radius total).
Zone C shall be the area from the forty-six (46) mile radius, extending to the outside limits of the Local Union's jurisdiction.
If any owner's contiguous property falls within more than one
Zone, it shall all be considered to be within the closer
Zone.
ELEC0640-005 06/21/2010
COCONINO, MARICOPA, MOHAVE, and PINAL (Area North and West of the boundary line beginning at a point where Papago Indian
Reservation Road No. 15 crosses the Pima-Pinal County line, then Northeasterly on Road No. 15 to the intersection with
Highway FAS-267, extending North on FAS-267 to the intersection with Florence Canal, North & East on Florence Canal to the intersection of the line "Second Guide Meridian East" then
North to the Maricopa-Pinal County Lines) COUNTIES
Electrician/Wireman..............$ 24.80 3%+7.14
ENGI0428-003 06/01/2010
Power Equipment Operator
(2) Crane under 15 tons.....$ 25.22 9.79
(3) Crane,15 tons to 100 tons........................$ 26.30 9.79
(4) Crane, 100 tons and over........................$ 27.33 9.79
IRON0075-002 08/01/2009
IRONWORKER, STRUCTURAL
Zone 1:.....................$ 26.52 17.59
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson
Zone 2: 050 to 100 miles - Add $4.00
Zone 3: 100 to 150 miles - Add $5.00
Zone 4: 150 miles & over - Add $6.50
LABO0383-005 06/01/2009
LABORER (Brick/Block Tender).....$ 16.72 4.35
PAIN0086-003 04/01/2010
PAINTER..........................$ 17.85 4.70
* PAIN0086-005 06/01/2011
GLAZIER..........................$ 26.50 6.98
PLUM0469-002 07/01/2010
ZONE A: COCONINO, MARICOPA, MOHAVE & YUMA COUNTIES
ZONE B: PIMA AND PINAL COUNTIES
PLUMBER/PIPEFITTER
Zone A......................$ 31.65 14.90
Zone B......................$ 28.55 14.65
SFAZ0669-001 04/01/2011
SPRINKLER FITTER (Fire
Sprinklers)......................$ 29.85 17.45
SHEE0359-002 01/01/2011
PIMA and PINAL (South of the 33rd Parallel) COUNTIES
Sheet Metal Worker (Including
HVAC)
Zone 1......................$ 28.75 13.00+3%
SHEE0359-003 01/01/2011
COCONINO, MARICOPA, MOHAVE, PINAL (North of the 33rd Parallel), and YUMA COUNTIES
Sheet Metal Worker (Including
HVAC)............................$ 28.75 13.00+3%
SUAZ2004-001 01/14/2004
Cement Mason/Finisher............$ 15.25 5.01
Laborers
Concrete Worker.............$ 8.88 0.00
Form Setter.................$ 9.63 0.00
General/Cleanup.............$ 11.37 2.91
Waterproofing...............$ 12.59 0.00
PLASTERER........................$ 15.00 0.00
Power Equipment Operator
Backhoe.....................$ 14.78 0.00
TILE FINISHER....................$ 11.00 0.00
TILE SETTER......................$ 14.98 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .