Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_&_Answers.pdf | ||
| Request_for_Quote_-_FBO_Amendment_02.pdf | ||
| Request_for_Quote_-_FBO_Amendment_01.pdf | ||
| Request_for_Quote_-_FBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
57th MUNS Reverse Osmosis System
SECTION I
DESCRIPTION OF SERVICES SPECIFIC TASKS
1. SCOPE OF WORK
1.1 The contractor shall provide all personnel, equipment, equipment, tools, materials, supervision, and other items necessary for the delivery and installation of a filter system as defined in this Statement of Work.
2. LOCATION
2.1 The project site is located at Nellis Air Force Base, Nevada.
2.2 Bldg 10309, 10325, 10304, 10302, 10402, 10406, 10432, 10301 and 283-D6 Area 2
3. DESCRIPTION OF WORK
3.1 Contractor shall deliver and install Reverse Osmosis System, provide all needed connections/hookups and clean up and haul away any waste.
4. FACILITIES DAMAGE:
4.1 The Contractor shall be responsible for any and all damage to buildings, facilities, grounds, and aircraft caused by his/her work forces or equipment, and shall repair said damages to the satisfaction of the Contracting Officer at no expense to the Government.
5. SCHEDULE
5.1 The Contractor shall prepare a written schedule of operation for all stages of work to be performed, and shall submit it to the Contracting Officer for approval prior to work start up.
6. WORKING HOURS
6.1 Working hours for the Contractor shall normally be between 07:30 am and 04:30 pm, Monday through Friday, excluding Federal holidays. If the Contractor desires to work during periods other than the above, he/she must identify by letter to the Contracting Officer at least five working days in advance of the dates desired, and identify the work that will be accomplished if approval is given. The Contractor shall not be reimbursed for any changes or work accomplished outside the scope of the contract without prior approval by the Contracting Officer. In addition to the above, close coordination with the Government must be maintained.
7. FINAL INSPECTION
7.1 The Contractor shall notify the 57 MXG / RA office (2-8403/2-2344) for the final inspection and certification. Final clean up shall be made prior to any inspection. All project documentation is required within 30 days of project acceptance, unless noted otherwise in the statement of work.
SECTION II
GENERAL INFORMATION
1. CONTRACTOR PERSONNEL REQUIREMENTS
1.1 The contractor shall provide the name of the responsible person who has full authority to act for the contractor on all matters relating to the performance of this contract. The name of this person or alternate(s) who shall act for the contractor when the responsible person is absent shall be designated in writing to the contracting office. The responsible person or alternate shall be available to discuss problem areas within 1 hour during normal duty hours and within 2 hours after normal duty hours. Normal duty hours for Nellis AFB are 07:30 am to 04:30 pm, Monday through Friday excluding Federal Holidays.
2. UNIFORM AND APPEARANCE
2.1 Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. While on duty, all employees shall wear a company unique uniform of the style and color normally used by industry. The uniform shall be clean and neat in appearance at all times.
3. SAFETY
3.1 There are no identified hazards on the designated property. Should a hazard be identified, the government corrects OSHA hazards according to the base wide government developed and approved plans of abatement taking into account safety and health priorities. The fact that no conditions have been identified does not warrant or guarantee that hazards do not exist, or that work-around procedures will not be necessary. Compliance with the OSHA and other applicable laws regulations for the protection of employees is exclusively the obligation of the contractor. Further, the government will assume no liability or responsibility for the contractor’s compliance or non-compliance with such requirements.
Before any modification of the facilities other than regular maintenance performed by the contractor at his or her expense, the contractor must furnish the contracting officer documentation describing, in detail, the modification proposed. No major alterations to the facilities shall be made without the specific written coordination form the contracting officer. In the case of alterations necessary for compliance with the OSHA, such permission shall not be unreasonably withheld.