Jan_6_Revised_Draft_Fire_Suppression_System_PWS.pdf
PDF 70 KB Posted
- Attached to
- Fire Suppression System Maintenance Federal contract opportunity
- Solicitation number
- FA4861-17-R-A020
About this file
PWS 06 Jan 17 Revision 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4861-17-R-A020_PWS_Updated_18_January_2017.pdf | ||
| FA4861-17-R-A020_Questions_&_Answers.pdf | ||
| FA4861-17-R-A020_PWS_Dated__14_December_2016_Attachment_1.pdf | ||
| FA4861-17-R-A020_Pass_Template_Attachment_2.xlsx | XLSX spreadsheet | |
| FA4861-17-R-A020_WD_2015-5593_Attachment_3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
WATER, WET CHEMICAL & HALON FIRE SUPPRESSION SYSTEMS
6 January 2017
1. DESCRIPTION OF SERVICES: The contractor shall provide all personnel, labor, equipment, supplies, tools, materials, supervision, and all other items and services necessary to perform inspection, maintenance, and repair of the fire suppression systems located at Creech and Nellis AFB’s as listed in Appendix A. All work shall be in compliance with all NFPA codes and standards, as well as any other applicable Federal, State, or local laws and codes.
2. SPECIFIC REQUIREMENTS: The work shall be performed in accordance with this PWS and shall be subject to the terms and conditions of the contract. The contractor shall maintain the fire suppressions systems identified in Appendix A, and shall be accomplished in a manner which ensures their serviceability and purpose.
2.1. Inspection and Testing: The contractor shall inspect and test fire suppression systems semi-annually (twice a year) beginning with an initial assessment. Any discrepancies or impairments found, and any repair required shall be reported to the COR, and perform required repairs in accordance with paragraph 2.2.1 and 2.2.2 below.
2.1.1. Wet Chemical: Inspections shall be performed twice a year during the months of April and October. All inspections shall be in accordance with the most current NFPA 17 and 17A guidelines.
2.1.2. Halon: Inspections shall be performed twice a year during the months of April and October. All inspections shall be in accordance with the most current NFPA 12A guidelines.
2.2. Repairs:
2.2.1. Minor Repairs: Defined as non-routine scheduled & unscheduled repairs and cost no more than $3,000 to make repairs. Minor repairs shall be paid for utilizing the Government-Wide Purchase Card (GPC). Contractor shall accept GPC as a form of payment. When minor repairs are required and or identified during the inspection, the contractor shall prepare and submit a detailed cost estimate to the Contracting Officer Representative (COR) that includes labor, trip charges (if applicable), and material costs required to complete the repair. The contractor shall only commence with repair work after receiving authorization from the COR. All repair work shall be in accordance with the most current NFPA 12A, 17 and 17A, normal commercial practices using parts specified by the manufacturer or items of equal or higher quality.
2.2.2. Major Repairs: Defined as non-routine scheduled & unscheduled repairs and cost more than $3,000 to make repairs. Major repairs will be invoiced using a separate line item on the contract through the Wide Area Workflow System (WAWF). When major repairs are required and or identified during the inspections, the contractor shall prepare and submit a detailed cost estimate to the COR that includes labor, trip charges (if applicable), and material costs required to complete the repair. The contractor shall commence repair work after receiving authorization from the Contracting Officer (CO). All repair work shall be in accordance with the most current NFPA 12A, 17 and 17A, normal commercial practices using parts specified by the manufacturer or items of equal or higher quality.
2.3. Service Calls:
2.3.1. Contractor shall coordinate with the COR on the arrival and departure of repair personnel on Nellis and Creech AFBs. Coordination is required so the facility users are notified prior to any fire suppression maintenance being performed.
2.4. Repair Service Calls:
2.4.1. A repair service call is an unscheduled minor or major repair. A call of this type would suggest that there has been a fire suppression systems fault or the possibility of a failure if the issue is not corrected. Additionally, this type of call does not pose a threat to the safety of personnel, property, equipment, or mission accomplishment.
2.4.2. The contractor shall respond to repair service call notifications by phone from the COR and be available on site during normal business hours no later than the following business day. A repair service call may require, but is not limited to troubleshooting, testing, repair or replacement of parts, and all other work necessary to restore the fire suppression systems to a safe and operable condition. Upon arrival, the contractor shall diagnose the condition and perform required repairs in accordance with this PWS.
2.5. Emergency Repair Service Calls:
2.5.1. Emergency repair services shall be provided 24 hours a day, seven days a week.
2.5.2. An emergency repair service call is an unscheduled minor or major repair. A call of this type would suggest that there has been a fire suppression system failure that presents a serious threat to the safety of personnel, property, equipment, or mission accomplishment.
2.5.3. The contractor shall respond to emergency repair service call notifications by phone from the COR and be available on site within four (4) hours during normal business hours and within six (6) hours at times other than normal business hours. An emergency repair service call may require, but is not limited to troubleshooting, testing, repair or replacement of parts, and all other work necessary to restore the fire suppression systems to a safe and operable condition. Upon arrival, the contractor shall diagnose the condition and perform required repairs in accordance with this
PWS.
2.6. Payment for service calls shall be made in accordance with this PWS. The payment will not be approved until report is received.
2.7. Hydrostatic Testing: The contractor shall hydrostatically test extinguishers as specified in the manufacturer’s recommendations at no extra cost to the government. The contractor shall attach a sticker/plate identifying pertinent information on all extinguishers that pass the test. Extinguishers that fail the hydrostatic test shall be identified and shall be returned to the government.
2.8. Service Tags: Upon completion of all work, the contractor, shall attach a tag indicating the name of the company, name and certificate number of technician performing service, date work was completed, month and year when next service shall be performed, and frequency of service for the system (i.e., semi-annual). The contractor shall attach the tags so that it is readily visible.
2.9. Warranty: The contractor shall offer the government a minimum of a 90-day warranty period for all work accomplished under this contract.
2.10. Schedule: The COR and the Nellis Fire Department’s Technical Service Office Quality Assurance Person (QAP) will be notified of the work schedule produced by the contractor at least ten (10) business days prior to performance of inspections. The schedule will list facility numbers, description of installed equipment, date, and time. The schedule may be altered due to security or mission requirements. Changes to the schedule may be requested by either party at least twenty-four (24) hours in advance, except work scheduled in restricted areas. Restricted area work schedules changes require forty-eight (48) hour notice.
2.11. Reports: The contractor shall prepare and submit a report within five (5) business days after completion of each semi-annual inspection. The report shall be submitted via e-mail and shall include identification of each fire suppression system, location within the facility, current condition, discrepancies, and the repairs needed with written quote. Additionally, the report shall include the date of inspection, facility number, inspector, and other necessary relevant information. All records, documents and associated papers provided to the government or generated during the period of this contract become government property and will be turned into the government upon contract termination or completion. During the contract period, all records, documents and associated papers will be available for government review.
3. SERVICES SUMMARY:
Performance Objective PWS Reference Performance Threshold Inspection and Testing: The contractor shall inspect and test fire suppression systems identified in Appendix A in accordance with the PWS.
Para 2.1. to 2.1.2. & Appendix A
Zero defect: Entire fire suppression systems must be inspected and tested.
Repair Service Call: The contractor shall respond to unscheduled minor or major repair service call in accordance with the PWS.
Para 2.4. to 2.4.2. 1 defect per month: Respond no later than the following business day.
Emergency Repair Service Call: The contractor shall respond to unscheduled minor or major emergency repair service call in accordance with the PWS.
Para 2.5. to 2.5.3.
Zero defects: Respond to emergency repair within four (4) hours during normal business hours and within six (6) hours at times other than normal business hours.
Reports: The contractor shall prepare and submit a report in accordance with the PWS. Para 2.11.
1 defect per report: Report provided no later than five (5) business days after each semi-annual inspection..
4. QUALITY CONTROL PLAN: The contractor shall develop and maintain a quality control program to ensure maintenance services are performed in accordance with commonly accepted commercial practices and services identified in this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure nonperformance of defective services does not occur. A written Quality Control Plan shall be submitted to the CO within five (5) business days after contract award for review and acceptance.
5. QUALITY ASSURANCE: The government shall evaluate the contractor’s performance through the COR to ensure services are received as specified. The government will evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The contractor shall submit a schedule of all inspections, prior to start of work. Additionally, the COR will assess the contractor’s performance through inspection, receipt of complaints from base personnel, and or fire inspectors which will routinely perform additional quality control checks during their scheduled and unscheduled building inspections.
6. SECURITY REQUIREMENTS:
6.1. The contractor shall requests a base and vehicle pass for employees, through the base contracting office, at the time of contract award. The contractor shall comply with base access REAL ID Act requirements IAW Public Law 109-13, 49 U.S.C., section 30301 and the Code of Federal Regulations (CFR) Title 6, Part 37. Contractor employees will be required to obtain and display identification badges at all times. Furthermore, anticipate delays in getting commercial vehicles on base and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits throughout the base. Procedures for commercial vehicle access to Air Force Bases are subject to change without prior notice.
6.2. Restricted Area Entry: Some systems are located in restricted areas and require advanced notice for access. Delays may be encountered in gaining access and leaving these areas even with prior coordination. Contractor personnel and vehicles may be under armed escort in restricted areas and are subjected to being searched at all times, before and after entry.
7. SPECIAL QUALIFICATIONS:
7.1. The contractor shall provide the name and telephone number of the contractor's on-site contract manager and alternate responsible for all requirements in the PWS for normal and after duty hours. The contract manager and alternate(s) must be able to read, write, speak and understand English.
7.2. The contractor shall ensure employees have a current Nevada State Fire Marshall license and certificate of registration for fire suppression systems work, which shall be presented to the CO at the time proposals are due. Technician(s) must also be able to read, write, speak, and understand English.
8. GOVERNMENT- FURNISHED SERVICES/MATERIALS:
8.1. Facilities: None
8.2. Utilities: The Government will furnish electricity, water, and sewage as necessary for accomplishment of work in accordance with this contract. All facilities do not receive the same utility services. The Contractor shall not change or modify any utility system or component; or connect any contractor property, equipment, or system without prior CO review and approval.
8.3. Materials: None
8.4. Security, Fire, and Medical Services: The Government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available, on a cost reimbursement basis.
8.5. Telephone: None
8.6. Solid Waste Collection and Disposal: None
9. CONTRACTOR-FURNISHED MATERIALS/REPLACEMENT PARTS:
9.1. Fusible Links – Current year fusible links shall be furnished and installed by the contractor at no additional cost to the government.
9.2. O-Rings – Replacement for worn out O-rings shall be furnished and installed by the contractor at no additional cost to the government.
9.3. Nozzle Caps and Cables – Replacement for worn, deteriorated or missing nozzle caps and attachment cables shall be furnished and installed by the contractor at no additional cost to the government.
9.4. Replacement Chemical – Replacement for wet and halon suppressant shall be furnished and installed by the contractor at no additional cost to the government.
10. CONTRACTOR RESPONSIBILITIES:
10.1. The contractor shall provide the COR, facility manager, and the Fire Department at least one (1) hour notice to isolate the fire alarm prior to working on the fire suppression system.
10.2. Damage: The contractor assumes full responsibility for any and all government property damaged in whole or in part from negligent acts or omissions by the contractor, subcontractor or any employee, agent or representative of the contractor. The contractor shall repair or reimburse the government for any and all damage of whatever kind to any and all government property associated with the performance of this service. For example, if the contractor, during a work performance causes a system to discharge, he/she shall perform all tasks necessary to repair all damages associated with the discharge at no cost to the government.
11. GENERAL INFORMATION:
11.1. HOURS OF OPERATIONS: Perform inspection, maintenance, and repairs services during normal business hours which are7:00AM - 4:00PM, Monday through Friday, excluding federal holidays, unless otherwise required in the contract or approved by the CO.
11.2. RECOGNIZED HOLIDAYS: The contractor is not required to provide service on federal holidays, except in emergency situations; the holidays are:
New Year's Day - l January Martin Luther King Day - 3rd Monday in January Presidents Day - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran's Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
If these holidays fall on Saturday, the proceeding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance.
11.3. IDENTIFICATION OF CONTRACT EMPLOYEES: Contract personnel shall present a neat and professional appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract.
This shall be accomplished through the wearing of distinctive clothing, overcoats, or hats bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.
11.4 MANPOWER REPORTING REQUIREMENTS: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil/.
http://www.ecmra.mil/ http://www.ecmra.mil/
APPENDIX A
LOCATION, TYPE, AND MODEL OF INSTALLED WATER, WET CHEMICAL & HALON
FIRE SUPPRESSION SYSTEMS
Facility Location Type Manufacture
Model Inspection Frequency
Bldg. 294 (Nellis) Touch N’ Go Flight Line Kitchen
Hood1 - Kitchen (Main) Stove and Oven
Wet Ansul R-102 Semi-Annual
Bldg. 294 (Nellis) Touch N’ Go Flight Line Kitchen
Hood 2 - Kitchen (Main) Fryer and Grill
Wet Ansul R-102 Semi-Annual
Bldg. 554 (Nellis) Officer’s Club
Hood 1 - Kitchen (Main) Fryer, Tilt Oven, Stove, Griddle, Steamer
Wet Ansul R-102 Semi-Annual
Bldg. 554 (Nellis) Officer’s Club
Hood 2 - Kitchen (Rear) Wet Ansul R-102 Semi-Annual
Bldg. 554 (Nellis) Officer’s Club
Hood 3 - Kitchen (Serving) Fryer and Stove
Wet Ansul R-102 Semi-Annual
Bldg. 554 (Nellis) Officer’s Club
Hood 4 - Kitchen (Serving) Griddle and Charbroiler
Wet Ansul R-102 Semi-Annual
Bldg. 600 (Nellis) Child Development Center
Hood - Kitchen (Main) Oven, Stove, Griddle
Water Avtec Quencher Semi-Annual
Bldg. 790 (Nellis) Cross Winds Inn Dining Facility
Hood 1 - Kitchen (Main) Stove, Tilt Grill, Kettle
Wet Buckeye Semi-Annual
Bldg. 790 (Nellis) Cross Winds Inn Dining Facility
Hood 2 - Kitchen (Main) Tilt Grill, and Fryer
Wet Buckeye Semi-Annual
Bldg. 790 (Nellis) Cross Winds Inn Dining Facility
Hood 3 - Kitchen (Serving) Griddle
Wet Buckeye Semi-Annual
Bldg. 790 (Nellis) Cross Winds Inn Dining Facility
Hood 4 - Kitchen (Serving) Griddle, Fryer, Charbroiler
Wet Buckeye Semi-Annual
Bldg. 790 (Nellis) Cross Winds Inn Dining Facility
Hood 5 - Kitchen (Main) Oven and Steamers
Wet Buckeye Semi-Annual
Bldg. 1626 (Nellis) Golf Course Club House
Hood 1 - Kitchen (Serving) Fryer and Griddle
Wet Ansul R-102 Semi-Annual
Bldg. 1626 (Nellis) Golf Course Club House
Hood 2 - Kitchen (Main) Wet Ansul R-102 Semi-Annual
Bldg. 2966 (Nellis) Child Development Center
Hood - Kitchen (Main) Stove Oven and Tilt Skillet
Wet Ansul R-102 Semi-Annual
Bldg. 2999 (Nellis) Youth Center
Hood - Kitchen (Main) Stove Oven
Wet Ansul R-102 Semi-Annual
Bldg. 61633 (Nellis) Engine Test Cell Hush House
Hangar Halon
Ansul Semi-Annual
Bldg. 61637 (Nellis) Engine Test Cell Hush House
Hangar Halon
Ansul Semi-Annual
Bldg. 71 (Creech) AAFES Dining Concession
Hood 1 - Kitchen (Serving) Griddle
Wet Fire Master Semi-Annual
Bldg. 71 (Creech) AAFES Dining Concession
Hood 2 - Kitchen (Main) Stove Oven
Wet Fire Master Semi-Annual
Bldg. 71 (Creech) AAFES Dining Concession
Hood 3- Kitchen (Main) Fryer Wet Fire Master Semi-Annual
Bldg. 85 (Creech) Fire Station 5
Hood - Kitchen Stove Oven Wet Range Guard Semi-Annual
Bldg. 1150 (Creech) Fire Station 6
Hood - Kitchen Stove Oven Wet Ansul R-102 Semi-Annual
Bldg. 1210 (Creech) Guardian Dining Facility
Hood 1 - Kitchen (Main) Oven Wet Ansul R-102 Semi-Annual
Bldg. 1210 (Creech) Guardian Dining Facility
Hood 2 - Kitchen (Main) Fryer and Range Top
Wet Ansul R-102 Semi-Annual
Bldg. 1210 (Creech) Guardian Dining Facility
Hood 3 - Kitchen (Main) Oven Wet Ansul R-102 Semi-Annual
Bldg. 1210 (Creech) Guardian Dining Facility
Hood 4 - Kitchen (Main) Baker Area
Wet Ansul R-102 Semi-Annual
Bldg. 1210 (Creech) Guardian Dining Facility
Hood 5 - Kitchen (Serving) Flat Top and Charbroiler
Wet Ansul R-102 Semi-Annual
Bldg. 1210 (Creech) Guardian Dining Facility
Hood 6 - Kitchen (Serving) Flat Top and Charbroiler
Wet Ansul R-102 Semi-Annual
File details come from the government source that posted it. Updated .