FA486109RA012_Nellis_Roof IDIQ_RFP.pdf

PDF 331 KB Posted

Attached to
Roofing IDIQ - Nellis AFB NV Federal contract opportunity
Solicitation number
FA4861-09-R-A-012
Issued by
Department of the Air Force Air Combat Command

About this file

Solicitation - Roofing IDIQ

View the file

Other files for this federal contract opportunity

Other files attached to Roofing IDIQ - Nellis AFB NV, newest first.
File Type Posted
Preproposal Site Visit Attendance Sheet.pdf PDF
Preproposal Site Visit Minutes.pdf PDF
FA4861-09-R-A012 Q A.docx DOCX document
FA486109RA012_Atch3_WDR_NV080004_21.pdf PDF
FA486109RA012_Atch2_WDR_NV080001_19.pdf PDF
FA486109RA012_Atch1_Specs.pdf PDF
FA486109RA012_Atch4_Questionnaire.pdf PDF
FA486109RA012_Nellis_Roof IDIQ_Synopsis.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Use typew riter or black ink to enter prices in Section B.

This project is limited to competition betw een SBA Certif ied 8(a) small business firms in Region 9 (i.e., Nevada, Arizona, California). Proposals w ill be evaluated on the basis of Best Value to the Government w here Past Performance is signif icantly more important than price.

Facsimile offers/amendments are NOT authorized and w ill NOT be accepted. Proposals must be received by the 99th Contracting squadron, 5865 Sw aab Blvd, Bldg 588, Nellis AFB, Nevada on or before the date/time specif ied in Block 13A.

All times used are local time, Pacific Daylight Savings Time (PDST)

The maximum contract amount shall not exceed $15,000,000.

PATRICK W. MOCK 702-652-9117

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13-Aug-2009

(RFP)

(IFB)

X

CALL:

Roof Repairs For Various Facilities

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________14 Sep 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

99 CONS/LGCA

5865 SWAAB BLVD, BLDG 588

NELLIS AFB NV 89191-7063

FA4861

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

04:30 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

Roofing IDIQ

8. ADDRESS OFFER TO (If Other Than Item 7)

702-652-2532FAX:TEL: 702-652-9113 TEL: FAX:

FA4861-09-R-A012 105

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA4861-09-R-A012

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Lot Base Year: Rpr Roofs Var Facilities IDIQ

FFP

Contractor shall provide all labor, materials, supplies, equipment, transportation, supervision, and all else necessary to REPAIR ROOFS, VARIOUS FACILITIES, Nellis AFB, Creech AFB, and Tonopah Test Range NV. All work shall be accomplished in conformance with the terms and conditions of the contract as well as those attached, referenced, or specified in the individual task orders that may be issued by the Contracting Officer.

FOB: Destination

PROJECT: ROOFING IDIQ

SIGNAL CODE: A

NET AMT

ITEM(S) 0001 - PRICING SCHEDULE NEXT PAGE

ROOFING IDIQ

EXHIBIT 01

PRICING SCHEDULE - BASE PERIOD

0001: Contractor shall furnish all plant, labor, equipment, material, supplies, transportation, supervision and all else necessary to complete roofing projects as may be ordered by the Contracting Officer in conformance with the terms and conditions specified, referenced or attached herein. The performance period within which to issue task orders shall be for a period of 365 days commencing on the date of award. (See Section F)

EXHIBIT

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

01AA Repair Shingle Roof 4:12 slope or> Paragraph 1.3.1.2.1

100 SF 1,000 $ $

01AB Repair Shingle Roof <4:12 slope Paragraph 1.3.1.2.1

100 SF 1,000 $ $

01AC Repair BUR w/Mod Bitumen Paragraph 1.3.1.3.1

100 SF 400 $ $

01AD Replace BUR w/APP Mod Bitumen Paragraph 1.3.1.3.2

100 SF 2,000 $ $

01AE Replace BUR w/APP Mod Bitumen 3,000-8,000 SF per project Paragraph 1.3.1.3.2

100 SF 1,000 $ $

01AF Replace BUR w/APP Mod Bitumen >8,000 SF per project Paragraph 1.3.1.3.2

100 SF 20,000 $ $

01AG Replace shingles w/APP Mod Bitumen Roof 800-5,000 per project Paragraph 1.3.1.4.1

100 SF 2,000 $ $

01AH Replace shingles w/APP Mod Bitumen Roof >5,000 SF per project Paragraph 1.3.1.4.1

100 SF 6,000 $ $

01AJ Replace Damaged preformed Metal Paragraph 1.3.1.5.1

100 SF 100 $ $

01AK Replace BUR w/EPDM 800-3,000 SF per project Paragraph 1.3.1.6.1

10 SF 100 $ $

EXHIBIT

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

01AL Replace BUR with EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.1

100 SF 5,000 $ $

01AM Replace BUR w/EPDM Paragraph 1.3.1.6.1

100 SF 30,000 $ $

01AN Replace BUR with EPDM 800- 3,000 SF per project Paragraph 1.3.1.6.2

10 SF 100 $ $

01AP Replace BUR W/EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.2

100 SF 5,000 $ $

01AQ Replace BUR w/EPDM >8,000 SF per project Paragraph 1.3.1.6.2

100 SF 30,000 $ $

01AR Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.3

10,000 SF 22,000 $ $

01AS Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.3

100,000 SF 120,000 $ $

01AT Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.4

10,000 SF 22,000 $ $

01AU Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.4

100,000 SF 256,000 $ $

01AV Install Elastomeric Acrylic Coating System 3,000-8,000 SF per project Paragraph 1.3.1.7.1

100 SF 5,000 $ $

001AW Install Elastomeric Acrylic Coating System >8,000 SF per project Paragraph 1.3.1.7.1

100 SF 15,000 $ $

01AX Install ½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

01AY Install ¾” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

01AZ Install 1” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

01BA Install 1½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

01BB Install 2” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

01BC Install 2½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

01BD Install Tapered Perlite Board Insulation Paragraph 1.3.1.8.2

100 BF 5,000 $ $

01BE Install ¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

01BF Install 1” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

01BG Install 1¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

01BH Install 2” Polyiso Board Insulation Paragraph 1.3.1.8.3

SF 5,000 $ $

01BJ Install 2 ½” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

01BK Install 3” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

01BL Install 3 ½ ” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 133,000 $ $

01BM Install Tapered Polyiso Board Insulation Paragraph 1.3.1.8.4

100 BF 68,000 $

01BN Install ½” Fiber Board Insulation Paragraph 1.3.1.8.5

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

01BP Install 1” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

01BQ Install 1 ½” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

01BR Install Fiberglass Blanket Insulation Paragraph 1.3.1.8.6

100 SF 5,000 $ $

01BS Repair Cap on Parapet Wall (to 24”) Paragraph 1.3.1.9.1

100 LF 500 $ $

01BT Repair Cap on Parapet Wall (to 40”) Paragraph 1.3.1.9.2

100 LF 500 $ $

01BU Install EPDM Boot on Pipe Penetrations to 18” dia Paragraph 1.3.1.9.3

1 EA 310 $ $

01BV Repair Pipe and Support Flashing to 4” dia Paragraph 1.3.1.9.3

10 EA 50 $ $

01BW Install Aluminum Gutter and Downspout Paragraph 1.3.1.10.1

50 LF 50 $ $

01BX Install concrete Splash Block Paragraph 1.3.1.10.2

1 EA 10 $ $

01BY Install Expansion Joint Paragraph 1.3.1.10.3

50 LF 600 $ $

01BZ Install metal pitch Pans Paragraph 1.3.1.10.4

4 EA 10 $ $

01CA Install Scupper in Parapet Wall Paragraph 1.3.1.10.5

1 EA 10 $ $

01CB Install Metal Drain Strainers & Clamp Rings Paragraph 1.3.1.10.6

1 EA 38 $ $

01CC Install Stationary Roof Ventilator Paragraph 1.3.1.10.7

1 EA 10 $ $

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

01CD Install Turbine roof Ventilator Paragraph 1.3.1.10.8

1 EA 10 $ $

01CE Extend pipe Vents Paragraph 1.3.1.10.9

1 LF 50 $ $

01CF Remove & Reinstall Rooftop Equipment Paragraph 1.3.1.10.10

1 EA 26 $ $

01CG Remove and Reinstall Heavy Rooftop Equipment Paragraph 1.3.1.10.11

1 EA 20 $ $

01CH Replace Fasteners Paragraph 1.3.1.11.1

100 EA 500 $ $

01CJ Install Elasto Tape on metal Seams Paragraph 1.3.1.11.2

100 LF 500 $ $

01CK Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.1.11.3

1 EA 50 $ $

001CL Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.1.11.4

1 EA 50 $ $

01CM Rpr BUR w/Hydro Stop Paragraph 1.3.1.11.5

10 SF 1,000 $ $

01CN Spray or Roll Coating on PUF Roof Paragraph 1.3.1.11.6

100 SF 4,000 $ $

01CP Power Wash Roof Paragraph 1.3.1.11.7

100 SF 10,000 $ $

01CQ Sweep Roof Clean Paragraph 1.3.1.11.8

100 SF 5,000 $ $

01CR Clean Gutters, Downspouts, Roof Drains Paragraph 1.3.1.11.9

100 LF 2,200 $ $

01CS Install ½” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 3,000 $ $

01CT Install 5/8” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 3,000 $ $

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

01CU Install ¾” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 1,000 $ $

01CV Replace Nailers Paragraph 1.3.1.12.2

100 LF 500 $ $

01CW Replace Wood Fascia Paragraph 1.3.1.12.3

100 LF 500 $ $

01CX Install Fabricated Sheet Metal Paragraph 1.3.1.13.1

10 SF 500 $ $

01CY Install Prefinished Fabricated Sheetmetal Paragraph 1.3.1.13.2

10 SF 500 $ $

01CZ Replace Metal Roof Decking Paragraph 1.3.1.13.3

100 SF 32,000 $ $

01DA Paint Roof Vents & Rooftop Equipment Paragraph 1.3.1.14.1

100 SF 500 $ $

01DB Paint Wood Fascia Paragraph 1.3.1.14.2

100 LF 500 $ $

01DC Paint Metal Edge Flashing Paragraph 1.3.1.14.3

100 LF 500 $ $

01DD Asbestos Sampling and Testing Paragraph 1.3.1.15.1

1 EA 200 $ $

01DE Remove Asbestos Mastic Paragraph 1.3.1.15.2

10 SF 2,200 $ $

01DF Remove Asbestos Shingle Roofing Paragraph 1.3.1.15.3

100 SF 4,000 $ $

01DG Remove Asbestos BUR Paragraph 1.3.1.15.4

100 SF 133,000 $ $

01DH Install ACM Encapsulant Sheet Paragraph 1.3.1.15.5

100 SF 10,000 $ $

01DJ Install ACM Encapsulant Agent Paragraph 1.3.1.15.6

100 SF 10,000 $ $

01DK LBP Sampling and Testing Paragraph 1.3.1.15.7

1 EA 100 $ $

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

01DL Remove LBP Paragraph 1.3.1.15.8

100 SF 200 $ $

01DM Encapsulate LBP Paragraph 1.3.1.15.9

100 SF 500 $ $

01DN Perform Roof Inspection Paragraph 1.3.1.16.1

1 EA 10 $ $

01DP Perform Roof Flood Test Paragraph 1.3.1.16.2

1 EA 5 $ $

01DQ Install Roof Warranty Signs Paragraph 1.3.1.16.3

2 EA 40 $ $

01DR Replace Corroded Bridge Bolts Paragraph 1.3.1.11.10

10 EA 400 $ $

01DS Replace Corroded Bridge Bolts Paragraph 1.3.1.11.11

10 EA 400 $ $

01DT Percent Increase for Non-standard Hours Paragraph 1.3.5.1 $ 25,000 X ______% $

01DU Percent Increase for Creech AFB work Paragraph 1.3.5.3 $ 25,0000 X ____% $

01DV Percent Increase for Tonopah AFB work Paragraph 1.3.5.4 $ 1,250,000 X ____% $

ESTIMATED TOTAL FOR THE BASE PERIOD

(ELINs 01AA 01DV): $

NOTE: The estimated quantities shown in the pricing schedules, Exhibits 01 through 05, are shown for the purpose of determining the low offeror and are not guaranteed to be ordered. The dollar amount ordered shall not exceed the amount specified as the maximum contract amount ($15 Million) and may accrue during one or more contract periods.

0002 Lot OPTION Opt #1: Rpr Roofs Var Facilities IDIQ

FFP

Contractor shall provide all labor, materials, supplies, equipment, transportation, supervision, and all else necessary to REPAIR ROOFS, VARIOUS FACILITIES, Nellis AFB, Creech AFB, and Tonopah Test Range NV. All work shall be accomplished in conformance with the terms and conditions of the contract as

ITEM(S) 0002 - PRICING SCHEDULE NEXT PAGE

EXHIBIT 02

PRICING SCHEDULE - OPTION YEAR #1

0002: Contractor shall furnish all plant, labor, equipment, material, supplies, transportation, Contracting Officer in conformance with the terms and conditions specified, referenced or attached herein. The performance period within which to issue delivery orders shall be for a period of 365 days after the end of the basic year performance period (See Section F).

EXHIBIT

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

02AA Repair Shingle Roof 4:12 slope or> Paragraph 1.3.1.2.1

100 SF 1,000 $ $

02AB Repair Shingle Roof <4:12 slope Paragraph 1.3.1.2.1

100 SF 1,000 $ $

02AC Repair BUR w/Mod Bitumen Paragraph 1.3.1.3.1

100 SF 400 $ $

02AD Replace BUR w/APP Mod Bitumen Paragraph 1.3.1.3.2

100 SF 2,000 $ $

02AE Replace BUR w/APP Mod Bitumen 3,000-8,000 SF per project Paragraph 1.3.1.3.2

100 SF 1,000 $ $

02AF Replace BUR w/APP Mod Bitumen >8,000 SF per project Paragraph 1.3.1.3.2

100 SF 20,000 $ $

02AG Replace shingles w/APP Mod Bitumen Roof 800-5,000 per project Paragraph 1.3.1.4.1

100 SF 2,000 $ $

02AH Replace shingles w/APP Mod Bitumen Roof >5,000 SF per project Paragraph 1.3.1.4.1

100 SF 6,000 $ $

02AJ Replace Damaged preformed Metal Paragraph 1.3.1.5.1

100 SF 100 $ $

02AK Replace BUR w/EPDM 800-3,000 SF per project

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

02AL Replace BUR with EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.1

100 SF 5,000 $ $

02AM Replace BUR w/EPDM Paragraph 1.3.1.6.1

100 SF 30,000 $ $

02AN Replace BUR with EPDM 800- 3,000 SF per project Paragraph 1.3.1.6.2

10 SF 100 $ $

02AP Replace BUR W/EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.2

100 SF 5,000 $ $

02AQ Replace BUR w/EPDM >8,000 SF per project Paragraph 1.3.1.6.2

100 SF 30,000 $ $

02AR Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.3

10,000 SF 22,000 $ $

02AS Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.3

100,000 SF 120,000 $ $

02AT Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.4

10,000 SF 22,000 $ $

02AU Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.4

100,000 SF 256,000 $ $

02AV Install Elastomeric Acrylic Coating System 3,000-8,000 SF per project Paragraph 1.3.1.7.1

100 SF 5,000 $ $

001AW Install Elastomeric Acrylic Coating System >8,000 SF per project Paragraph 1.3.1.7.1

100 SF 15,000 $ $

02AX Install ½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

02AY Install ¾” Expanded Perlite Board Insulation

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

02AZ Install 1” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

02BA Install 1½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

02BB Install 2” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

02BC Install 2½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

02BD Install Tapered Perlite Board Insulation Paragraph 1.3.1.8.2

100 BF 5,000 $ $

02BE Install ¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

02BF Install 1” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

02BG Install 1¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

02BH Install 2” Polyiso Board Insulation Paragraph 1.3.1.8.3

SF 5,000 $ $

02BJ Install 2 ½” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

02BK Install 3” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

02BL Install 3 ½ ” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 133,000 $ $

02BM Install Tapered Polyiso Board Insulation Paragraph 1.3.1.8.4

100 BF 68,000 $

02BN Install ½” Fiber Board Insulation

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

02BP Install 1” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

02BQ Install 1 ½” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

02BR Install Fiberglass Blanket Insulation Paragraph 1.3.1.8.6

100 SF 5,000 $ $

02BS Repair Cap on Parapet Wall (to 24”) Paragraph 1.3.1.9.1

100 LF 500 $ $

02BT Repair Cap on Parapet Wall (to 40”) Paragraph 1.3.1.9.2

100 LF 500 $ $

02BU Install EPDM Boot on Pipe Penetrations to 18” dia Paragraph 1.3.1.9.3

1 EA 310 $ $

02BV Repair Pipe and Support Flashing to 4” dia Paragraph 1.3.1.9.3

10 EA 50 $ $

02BW Install Aluminum Gutter and Downspout Paragraph 1.3.1.10.1

50 LF 50 $ $

02BX Install concrete Splash Block Paragraph 1.3.1.10.2

1 EA 10 $ $

02BY Install Expansion Joint Paragraph 1.3.1.10.3

50 LF 600 $ $

02BZ Install metal pitch Pans Paragraph 1.3.1.10.4

4 EA 10 $ $

02CA Install Scupper in Parapet Wall Paragraph 1.3.1.10.5

1 EA 10 $ $

02CB Install Metal Drain Strainers & Clamp Rings Paragraph 1.3.1.10.6

1 EA 38 $ $

02CC Install Stationary Roof Ventilator

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

02CD Install Turbine roof Ventilator Paragraph 1.3.1.10.8

1 EA 10 $ $

02CE Extend pipe Vents Paragraph 1.3.1.10.9

1 LF 50 $ $

02CF Remove & Reinstall Rooftop Equipment Paragraph 1.3.1.10.10

1 EA 26 $ $

02CG Remove and Reinstall Heavy Rooftop Equipment Paragraph 1.3.1.10.11

1 EA 20 $ $

02CH Replace Fasteners Paragraph 1.3.1.11.1

100 EA 500 $ $

02CJ Install Elasto Tape on metal Seams Paragraph 1.3.1.11.2

100 LF 500 $ $

02CK Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.1.11.3

1 EA 50 $ $

001CL Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.11.4

1 EA 50 $ $

02CM Rpr BUR w/Hydro Stop Paragraph 1.3.1.11.5

10 SF 1,000 $ $

02CN Spray or Roll Coating on PUF Roof Paragraph 1.3.1.11.6

100 SF 4,000 $ $

02CP Power Wash Roof Paragraph 1.3.1.11.7

100 SF 10,000 $ $

02CQ Sweep Roof Clean Paragraph 1.3.1.11.8

100 SF 5,000 $ $

02CR Clean Gutters, Downspouts, Roof Drains Paragraph 1.3.1.11.9

100 LF 2,200 $ $

02CS Install ½” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 3,000 $ $

02CT Install 5/8” Plywood Sheathing

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

02CU Install ¾” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 1,000 $ $

02CV Replace Nailers Paragraph 1.3.1.12.2

100 LF 500 $ $

02CW Replace Wood Fascia Paragraph 1.3.1.12.3

100 LF 500 $ $

02CX Install Fabricated Sheet Metal Paragraph 1.3.1.13.1

10 SF 500 $ $

02CY Install Prefinished Fabricated Sheetmetal Paragraph 1.3.1.13.2

10 SF 500 $ $

02CZ Replace Metal Roof Decking Paragraph 1.3.1.13.3

100 SF 32,000 $ $

02DA Paint Roof Vents & Rooftop Equipment Paragraph 1.3.1.14.1

100 SF 500 $ $

02DB Paint Wood Fascia Paragraph 1.3.1.14.2

100 LF 500 $ $

02DC Paint Metal Edge Flashing Paragraph 1.3.1.14.3

100 LF 500 $ $

02DD Asbestos Sampling and Testing Paragraph 1.3.1.15.1

1 EA 200 $ $

02DE Remove Asbestos Mastic Paragraph 1.3.1.15.2

10 SF 2,200 $ $

02DF Remove Asbestos Shingle Roofing Paragraph 1.3.1.15.3

100 SF 4,000 $ $

02DG Remove Asbestos BUR Paragraph 1.3.1.15.4

100 SF 133,000 $ $

02DH Install ACM Encapsulant Sheet Paragraph 1.3.1.15.5

100 SF 10,000 $ $

02DJ Install ACM Encapsulant Agent Paragraph 1.3.1.15.6

100 SF 10,000 $ $

02DK LBP Sampling and Testing

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

02DL Remove LBP Paragraph 1.3.1.15.8

100 SF 200 $ $

02DM Encapsulate LBP Paragraph 1.3.1.15.9

100 SF 500 $ $

02DN Perform Roof Inspection Paragraph 1.3.1.16.1

1 EA 10 $ $

02DP Perform Roof Flood Test Paragraph 1.3.1.16.2

1 EA 5 $ $

02DQ Install Roof Warranty Signs Paragraph 1.3.1.16.3

2 EA 40 $ $

02DR Replace Corroded Bridge Bolts Paragraph 1.3.1.11.10

10 EA 400 $ $

02DS Replace Corroded Bridge Bolts Paragraph 1.3.1.11.11

10 EA 400 $ $

02DT Percent Increase for Non-standard Hours Paragraph 1.3.5.1 $ 25,000 X

02DU Percent Increase for Creech AFB work Paragraph 1.3.5.3 $ 25,0000 X

02DV Percent Increase for Tonopah AFB work Paragraph 1.3.5.4 $ 1,250,000 X

ESTIMATED TOTAL FOR THE OPTION YEAR #1

(ELINs 02AA – 02DV): $

NOTE: The estimated quantities shown in the pricing schedules, Exhibits 01 through 05, are shown for the purpose of determining the low offeror and are not guaranteed to be ordered. The total dollar amount

0003 Lot OPTION Opt #2: Rpr Roofs Var Facilities IDIQ

FFP

Contractor shall provide all labor, materials, supplies, equipment, transportation, supervision, and all else necessary to REPAIR ROOFS, VARIOUS FACILITIES, Nellis AFB, Creech AFB, and Tonopah Test Range NV. All work shall be accomplished in conformance with the terms and conditions of the contract as

ITEM(S) 0003 - PRICING SCHEDUE NEXT PAGE

EXHIBIT 03

PRICING SCHEDULE - OPTION YEAR #2

0003: Contractor shall furnish all plant, labor, equipment, material, supplies, transportation, Contracting Officer in conformance with the terms and conditions specified, referenced or attached herein. The performance period within which to issue delivery orders shall be for a period of 366 days after the end of the Option Period #1 performance period (See Section F).

EXHIBIT

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

03AA Repair Shingle Roof 4:12 slope or> Paragraph 1.3.1.2.1

100 SF 1,000 $ $

03AB Repair Shingle Roof <4:12 slope Paragraph 1.3.1.2.1

100 SF 1,000 $ $

03AC Repair BUR w/Mod Bitumen Paragraph 1.3.1.3.1

100 SF 400 $ $

03AD Replace BUR w/APP Mod Bitumen Paragraph 1.3.1.3.2

100 SF 2,000 $ $

03AE Replace BUR w/APP Mod Bitumen 3,000-8,000 SF per project Paragraph 1.3.1.3.2

100 SF 1,000 $ $

03AF Replace BUR w/APP Mod Bitumen >8,000 SF per project Paragraph 1.3.1.3.2

100 SF 20,000 $ $

03AG Replace shingles w/APP Mod Bitumen Roof 800-5,000 per project Paragraph 1.3.1.4.1

100 SF 2,000 $ $

03AH Replace shingles w/APP Mod Bitumen Roof >5,000 SF per project Paragraph 1.3.1.4.1

100 SF 6,000 $ $

03AJ Replace Damaged preformed Metal Paragraph 1.3.1.5.1

100 SF 100 $ $

03AK Replace BUR w/EPDM 800-3,000 SF per project

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

03AL Replace BUR with EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.1

100 SF 5,000 $ $

03AM Replace BUR w/EPDM Paragraph 1.3.1.6.1

100 SF 30,000 $ $

03AN Replace BUR with EPDM 800- 3,000 SF per project Paragraph 1.3.1.6.2

10 SF 100 $ $

03AP Replace BUR W/EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.2

100 SF 5,000 $ $

03AQ Replace BUR w/EPDM >8,000 SF per project Paragraph 1.3.1.6.2

100 SF 30,000 $ $

03AR Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.3

10,000 SF 22,000 $ $

03AS Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.3

100,000 SF 120,000 $ $

03AT Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.4

10,000 SF 22,000 $ $

03AU Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.4

100,000 SF 256,000 $ $

03AV Install Elastomeric Acrylic Coating System 3,000-8,000 SF per project Paragraph 1.3.1.7.1

100 SF 5,000 $ $

001AW Install Elastomeric Acrylic Coating System >8,000 SF per project Paragraph 1.3.1.7.1

100 SF 15,000 $ $

03AX Install ½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

03AY Install ¾” Expanded Perlite Board Insulation

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

03AZ Install 1” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

03BA Install 1½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

03BB Install 2” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

03BC Install 2½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

03BD Install Tapered Perlite Board Insulation Paragraph 1.3.1.8.2

100 BF 5,000 $ $

03BE Install ¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

03BF Install 1” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

03BG Install 1¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

03BH Install 2” Polyiso Board Insulation Paragraph 1.3.1.8.3

SF 5,000 $ $

03BJ Install 2 ½” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

03BK Install 3” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

03BL Install 3 ½ ” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 133,000 $ $

03BM Install Tapered Polyiso Board Insulation Paragraph 1.3.1.8.4

100 BF 68,000 $

03BN Install ½” Fiber Board Insulation

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

03BP Install 1” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

03BQ Install 1 ½” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

03BR Install Fiberglass Blanket Insulation Paragraph 1.3.1.8.6

100 SF 5,000 $ $

03BS Repair Cap on Parapet Wall (to 24”) Paragraph 1.3.1.9.1

100 LF 500 $ $

03BT Repair Cap on Parapet Wall (to 40”) Paragraph 1.3.1.9.2

100 LF 500 $ $

03BU Install EPDM Boot on Pipe Penetrations to 18” dia Paragraph 1.3.1.9.3

1 EA 310 $ $

03BV Repair Pipe and Support Flashing to 4” dia Paragraph 1.3.1.9.3

10 EA 50 $ $

03BW Install Aluminum Gutter and Downspout Paragraph 1.3.1.10.1

50 LF 50 $ $

03BX Install concrete Splash Block Paragraph 1.3.1.10.2

1 EA 10 $ $

03BY Install Expansion Joint Paragraph 1.3.1.10.3

50 LF 600 $ $

03BZ Install metal pitch Pans Paragraph 1.3.1.10.4

4 EA 10 $ $

03CA Install Scupper in Parapet Wall Paragraph 1.3.1.10.5

1 EA 10 $ $

03CB Install Metal Drain Strainers & Clamp Rings Paragraph 1.3.1.10.6

1 EA 38 $ $

03CC Install Stationary Roof Ventilator

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

03CD Install Turbine roof Ventilator Paragraph 1.3.1.10.8

1 EA 10 $ $

03CE Extend pipe Vents Paragraph 1.3.1.10.9

1 LF 50 $ $

03CF Remove & Reinstall Rooftop Equipment Paragraph 1.3.1.10.10

1 EA 26 $ $

03CG Remove and Reinstall Heavy Rooftop Equipment Paragraph 1.3.1.10.11

1 EA 20 $ $

03CH Replace Fasteners Paragraph 1.3.1.11.1

100 EA 500 $ $

03CJ Install Elasto Tape on metal Seams Paragraph 1.3.1.11.2

100 LF 500 $ $

03CK Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.1.11.3

1 EA 50 $ $

001CL Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.11.4

1 EA 50 $ $

03CM Rpr BUR w/Hydro Stop Paragraph 1.3.1.11.5

10 SF 1,000 $ $

03CN Spray or Roll Coating on PUF Roof Paragraph 1.3.1.11.6

100 SF 4,000 $ $

03CP Power Wash Roof Paragraph 1.3.1.11.7

100 SF 10,000 $ $

03CQ Sweep Roof Clean Paragraph 1.3.1.11.8

100 SF 5,000 $ $

03CR Clean Gutters, Downspouts, Roof Drains Paragraph 1.3.1.11.9

100 LF 2,200 $ $

03CS Install ½” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 3,000 $ $

03CT Install 5/8” Plywood Sheathing

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

03CU Install ¾” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 1,000 $ $

03CV Replace Nailers Paragraph 1.3.1.12.2

100 LF 500 $ $

03CW Replace Wood Fascia Paragraph 1.3.1.12.3

100 LF 500 $ $

03CX Install Fabricated Sheet Metal Paragraph 1.3.1.13.1

10 SF 500 $ $

03CY Install Prefinished Fabricated Sheetmetal Paragraph 1.3.1.13.2

10 SF 500 $ $

03CZ Replace Metal Roof Decking Paragraph 1.3.1.13.3

100 SF 32,000 $ $

03DA Paint Roof Vents & Rooftop Equipment Paragraph 1.3.1.14.1

100 SF 500 $ $

03DB Paint Wood Fascia Paragraph 1.3.1.14.2

100 LF 500 $ $

03DC Paint Metal Edge Flashing Paragraph 1.3.1.14.3

100 LF 500 $ $

03DD Asbestos Sampling and Testing Paragraph 1.3.1.15.1

1 EA 200 $ $

03DE Remove Asbestos Mastic Paragraph 1.3.1.15.2

10 SF 2,200 $ $

03DF Remove Asbestos Shingle Roofing Paragraph 1.3.1.15.3

100 SF 4,000 $ $

03DG Remove Asbestos BUR Paragraph 1.3.1.15.4

100 SF 133,000 $ $

03DH Install ACM Encapsulant Sheet Paragraph 1.3.1.15.5

100 SF 10,000 $ $

03DJ Install ACM Encapsulant Agent Paragraph 1.3.1.15.6

100 SF 10,000 $ $

03DK LBP Sampling and Testing

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

03DL Remove LBP Paragraph 1.3.1.15.8

100 SF 200 $ $

03DM Encapsulate LBP Paragraph 1.3.1.15.9

100 SF 500 $ $

03DN Perform Roof Inspection Paragraph 1.3.1.16.1

1 EA 10 $ $

03DP Perform Roof Flood Test Paragraph 1.3.1.16.2

1 EA 5 $ $

03DQ Install Roof Warranty Signs Paragraph 1.3.1.16.3

2 EA 40 $ $

03DR Replace Corroded Bridge Bolts Paragraph 1.3.1.11.10

10 EA 400 $ $

03DS Replace Corroded Bridge Bolts Paragraph 1.3.1.11.11

10 EA 400 $ $

03DT Percent Increase for Non-standard Hours Paragraph 1.3.5.1 $ 25,000 X

03DU Percent Increase for Creech AFB work Paragraph 1.3.5.3 $ 25,0000 X

03DV Percent Increase for Tonopah AFB work Paragraph 1.3.5.4 $ 1,250,000 X

ESTIMATED TOTAL FOR THE OPTION YEAR #2

(CLINs 03AA – 03DV): $

NOTE: The estimated quantities shown in the pricing schedules, Exhibits 01 through 05, are shown for the purpose of determining the low offeror and are not guaranteed to be ordered. The total dollar amount

0004 Lot OPTION Opt #3: Rpr Roofs Var Facilities IDIQ

FFP

Contractor shall provide all labor, materials, supplies, equipment, transportation, supervision, and all else necessary to REPAIR ROOFS, VARIOUS FACILITIES, Nellis AFB, Creech AFB, and Tonopah Test Range NV. All work shall be accomplished in conformance with the terms and conditions of the contract as

ITEM(S) 0004 - PRICING SCHEDULE NEXT PAGE

EXHIBIT 04

PRICING SCHEDULE - OPTION YEAR #3

0004: Contractor shall furnish all plant, labor, equipment, material, supplies, transportation, Contracting Officer in conformance with the terms and conditions specified, referenced or attached herein. The performance period within which to issue delivery orders shall be for a period of 365 days after the end of the Option Period #2 performance period (See Section F).

EXHIBIT

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

04AA Repair Shingle Roof 4:12 slope or> Paragraph 1.3.1.2.1

100 SF 1,000 $ $

04AB Repair Shingle Roof <4:12 slope Paragraph 1.3.1.2.1

100 SF 1,000 $ $

04AC Repair BUR w/Mod Bitumen Paragraph 1.3.1.3.1

100 SF 400 $ $

04AD Replace BUR w/APP Mod Bitumen Paragraph 1.3.1.3.2

100 SF 2,000 $ $

04AE Replace BUR w/APP Mod Bitumen 3,000-8,000 SF per project Paragraph 1.3.1.3.2

100 SF 1,000 $ $

04AF Replace BUR w/APP Mod Bitumen >8,000 SF per project Paragraph 1.3.1.3.2

100 SF 20,000 $ $

04AG Replace shingles w/APP Mod Bitumen Roof 800-5,000 per project Paragraph 1.3.1.4.1

100 SF 2,000 $ $

04AH Replace shingles w/APP Mod Bitumen Roof >5,000 SF per project Paragraph 1.3.1.4.1

100 SF 6,000 $ $

04AJ Replace Damaged preformed Metal Paragraph 1.3.1.5.1

100 SF 100 $ $

04AK Replace BUR w/EPDM 800-3,000 SF per project

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

04AL Replace BUR with EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.1

100 SF 5,000 $ $

04AM Replace BUR w/EPDM Paragraph 1.3.1.6.1

100 SF 30,000 $ $

04AN Replace BUR with EPDM 800- 3,000 SF per project Paragraph 1.3.1.6.2

10 SF 100 $ $

04AP Replace BUR W/EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.2

100 SF 5,000 $ $

04AQ Replace BUR w/EPDM >8,000 SF per project Paragraph 1.3.1.6.2

100 SF 30,000 $ $

04AR Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.3

10,000 SF 22,000 $ $

04AS Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.3

100,000 SF 120,000 $ $

04AT Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.4

10,000 SF 22,000 $ $

04AU Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.4

100,000 SF 256,000 $ $

04AV Install Elastomeric Acrylic Coating System 3,000-8,000 SF per project Paragraph 1.3.1.7.1

100 SF 5,000 $ $

001AW Install Elastomeric Acrylic Coating System >8,000 SF per project Paragraph 1.3.1.7.1

100 SF 15,000 $ $

04AX Install ½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

04AY Install ¾” Expanded Perlite Board Insulation

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

04AZ Install 1” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

04BA Install 1½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

04BB Install 2” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

04BC Install 2½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

04BD Install Tapered Perlite Board Insulation Paragraph 1.3.1.8.2

100 BF 5,000 $ $

04BE Install ¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

04BF Install 1” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

04BG Install 1¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

04BH Install 2” Polyiso Board Insulation Paragraph 1.3.1.8.3

SF 5,000 $ $

04BJ Install 2 ½” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

04BK Install 3” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

04BL Install 3 ½ ” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 133,000 $ $

04BM Install Tapered Polyiso Board Insulation Paragraph 1.3.1.8.4

100 BF 68,000 $

04BN Install ½” Fiber Board Insulation

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

04BP Install 1” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

04BQ Install 1 ½” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

04BR Install Fiberglass Blanket Insulation Paragraph 1.3.1.8.6

100 SF 5,000 $ $

04BS Repair Cap on Parapet Wall (to 24”) Paragraph 1.3.1.9.1

100 LF 500 $ $

04BT Repair Cap on Parapet Wall (to 40”) Paragraph 1.3.1.9.2

100 LF 500 $ $

04BU Install EPDM Boot on Pipe Penetrations to 18” dia Paragraph 1.3.1.9.3

1 EA 310 $ $

04BV Repair Pipe and Support Flashing to 4” dia Paragraph 1.3.1.9.3

10 EA 50 $ $

04BW Install Aluminum Gutter and Downspout Paragraph 1.3.1.10.1

50 LF 50 $ $

04BX Install concrete Splash Block Paragraph 1.3.1.10.2

1 EA 10 $ $

04BY Install Expansion Joint Paragraph 1.3.1.10.3

50 LF 600 $ $

04BZ Install metal pitch Pans Paragraph 1.3.1.10.4

4 EA 10 $ $

04CA Install Scupper in Parapet Wall Paragraph 1.3.1.10.5

1 EA 10 $ $

04CB Install Metal Drain Strainers & Clamp Rings Paragraph 1.3.1.10.6

1 EA 38 $ $

04CC Install Stationary Roof Ventilator

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

04CD Install Turbine roof Ventilator Paragraph 1.3.1.10.8

1 EA 10 $ $

04CE Extend pipe Vents Paragraph 1.3.1.10.9

1 LF 50 $ $

04CF Remove & Reinstall Rooftop Equipment Paragraph 1.3.1.10.10

1 EA 26 $ $

04CG Remove and Reinstall Heavy Rooftop Equipment Paragraph 1.3.1.10.11

1 EA 20 $ $

04CH Replace Fasteners Paragraph 1.3.1.11.1

100 EA 500 $ $

04CJ Install Elasto Tape on metal Seams Paragraph 1.3.1.11.2

100 LF 500 $ $

04CK Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.1.11.3

1 EA 50 $ $

001CL Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.11.4

1 EA 50 $ $

04CM Rpr BUR w/Hydro Stop Paragraph 1.3.1.11.5

10 SF 1,000 $ $

04CN Spray or Roll Coating on PUF Roof Paragraph 1.3.1.11.6

100 SF 4,000 $ $

04CP Power Wash Roof Paragraph 1.3.1.11.7

100 SF 10,000 $ $

04CQ Sweep Roof Clean Paragraph 1.3.1.11.8

100 SF 5,000 $ $

04CR Clean Gutters, Downspouts, Roof Drains Paragraph 1.3.1.11.9

100 LF 2,200 $ $

04CS Install ½” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 3,000 $ $

04CT Install 5/8” Plywood Sheathing

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

04CU Install ¾” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 1,000 $ $

04CV Replace Nailers Paragraph 1.3.1.12.2

100 LF 500 $ $

04CW Replace Wood Fascia Paragraph 1.3.1.12.3

100 LF 500 $ $

04CX Install Fabricated Sheet Metal Paragraph 1.3.1.13.1

10 SF 500 $ $

04CY Install Prefinished Fabricated Sheetmetal Paragraph 1.3.1.13.2

10 SF 500 $ $

04CZ Replace Metal Roof Decking Paragraph 1.3.1.13.3

100 SF 32,000 $ $

04DA Paint Roof Vents & Rooftop Equipment Paragraph 1.3.1.14.1

100 SF 500 $ $

04DB Paint Wood Fascia Paragraph 1.3.1.14.2

100 LF 500 $ $

04DC Paint Metal Edge Flashing Paragraph 1.3.1.14.3

100 LF 500 $ $

04DD Asbestos Sampling and Testing Paragraph 1.3.1.15.1

1 EA 200 $ $

04DE Remove Asbestos Mastic Paragraph 1.3.1.15.2

10 SF 2,200 $ $

04DF Remove Asbestos Shingle Roofing Paragraph 1.3.1.15.3

100 SF 4,000 $ $

04DG Remove Asbestos BUR Paragraph 1.3.1.15.4

100 SF 133,000 $ $

04DH Install ACM Encapsulant Sheet Paragraph 1.3.1.15.5

100 SF 10,000 $ $

04DJ Install ACM Encapsulant Agent Paragraph 1.3.1.15.6

100 SF 10,000 $ $

04DK LBP Sampling and Testing

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

04DL Remove LBP Paragraph 1.3.1.15.8

100 SF 200 $ $

04DM Encapsulate LBP Paragraph 1.3.1.15.9

100 SF 500 $ $

04DN Perform Roof Inspection Paragraph 1.3.1.16.1

1 EA 10 $ $

04DP Perform Roof Flood Test Paragraph 1.3.1.16.2

1 EA 5 $ $

04DQ Install Roof Warranty Signs Paragraph 1.3.1.16.3

2 EA 40 $ $

04DR Replace Corroded Bridge Bolts Paragraph 1.3.1.11.10

10 EA 400 $ $

04DS Replace Corroded Bridge Bolts Paragraph 1.3.1.11.11

10 EA 400 $ $

04DT Percent Increase for Non-standard Hours Paragraph 1.3.5.1 $ 25,000 X

04DU Percent Increase for Creech AFB work Paragraph 1.3.5.3 $ 25,0000 X

04DV Percent Increase for Tonopah AFB work Paragraph 1.3.5.4 $ 1,250,000 X

ESTIMATED TOTAL FOR THE OPTION YEAR #3

(CLINs 04AA – 04DV): $

NOTE: The estimated quantities shown in the pricing schedules, Exhibits 01 through 05, are shown for

0005 Lot OPTION Opt #4: Rpr Roofs Var Facilities IDIQ

FFP

Contractor shall provide all labor, materials, supplies, equipment, transportation, supervision, and all else necessary to REPAIR ROOFS, VARIOUS FACILITIES, Nellis AFB, Creech AFB, and Tonopah Test Range NV. All work shall be accomplished in conformance with the terms and conditions of the contract as

ITEM(S) 0005 - PRICING SCHEDULE NEXT PAGE

EXHIBIT 05

PRICING SCHEDULE - OPTION YEAR #4

0005: Contractor shall furnish all plant, labor, equipment, material, supplies, transportation, Contracting Officer in conformance with the terms and conditions specified, referenced or attached herein. The performance period within which to issue delivery orders shall be for a period of 365 days after the end of the Option Period #3 performance period (See Section F).

EXHIBIT

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

05AA Repair Shingle Roof 4:12 slope or> Paragraph 1.3.1.2.1

100 SF 1,000 $ $

05AB Repair Shingle Roof <4:12 slope Paragraph 1.3.1.2.1

100 SF 1,000 $ $

05AC Repair BUR w/Mod Bitumen Paragraph 1.3.1.3.1

100 SF 400 $ $

05AD Replace BUR w/APP Mod Bitumen Paragraph 1.3.1.3.2

100 SF 2,000 $ $

05AE Replace BUR w/APP Mod Bitumen 3,000-8,000 SF per project Paragraph 1.3.1.3.2

100 SF 1,000 $ $

05AF Replace BUR w/APP Mod Bitumen >8,000 SF per project Paragraph 1.3.1.3.2

100 SF 20,000 $ $

05AG Replace shingles w/APP Mod Bitumen Roof 800-5,000 per project Paragraph 1.3.1.4.1

100 SF 2,000 $ $

05AH Replace shingles w/APP Mod Bitumen Roof >5,000 SF per project Paragraph 1.3.1.4.1

100 SF 6,000 $ $

05AJ Replace Damaged preformed Metal Paragraph 1.3.1.5.1

100 SF 100 $ $

05AK Replace BUR w/EPDM 800-3,000 SF per project

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

05AL Replace BUR with EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.1

100 SF 5,000 $ $

05AM Replace BUR w/EPDM Paragraph 1.3.1.6.1

100 SF 30,000 $ $

05AN Replace BUR with EPDM 800- 3,000 SF per project Paragraph 1.3.1.6.2

10 SF 100 $ $

05AP Replace BUR W/EPDM 3,000- 8,000 SF per project Paragraph 1.3.1.6.2

100 SF 5,000 $ $

05AQ Replace BUR w/EPDM >8,000 SF per project Paragraph 1.3.1.6.2

100 SF 30,000 $ $

05AR Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.3

10,000 SF 22,000 $ $

05AS Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.3

100,000 SF 120,000 $ $

05AT Replace PUFF w/EPDM 10,000- 100,000 SF per project Paragraph 1.3.1.6.4

10,000 SF 22,000 $ $

05AU Replace PUFF w/EPDM >100,000 SF per project Paragraph 1.3.1.6.4

100,000 SF 256,000 $ $

05AV Install Elastomeric Acrylic Coating System 3,000-8,000 SF per project Paragraph 1.3.1.7.1

100 SF 5,000 $ $

001AW Install Elastomeric Acrylic Coating System >8,000 SF per project Paragraph 1.3.1.7.1

100 SF 15,000 $ $

05AX Install ½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

05AY Install ¾” Expanded Perlite Board Insulation

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

05AZ Install 1” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

05BA Install 1½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

05BB Install 2” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

05BC Install 2½” Expanded Perlite Board Insulation Paragraph 1.3.1.8.1

100 SF 5,000 $ $

05BD Install Tapered Perlite Board Insulation Paragraph 1.3.1.8.2

100 BF 5,000 $ $

05BE Install ¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

05BF Install 1” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

05BG Install 1¾” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

05BH Install 2” Polyiso Board Insulation Paragraph 1.3.1.8.3

SF 5,000 $ $

05BJ Install 2 ½” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

05BK Install 3” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 5,000 $ $

05BL Install 3 ½ ” Polyiso Board Insulation Paragraph 1.3.1.8.3

100 SF 133,000 $ $

05BM Install Tapered Polyiso Board Insulation Paragraph 1.3.1.8.4

100 BF 68,000 $

05BN Install ½” Fiber Board Insulation

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

05BP Install 1” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

05BQ Install 1 ½” Fiber Board Insulation Paragraph 1.3.1.8.5

100 SF 5,000 $ $

05BR Install Fiberglass Blanket Insulation Paragraph 1.3.1.8.6

100 SF 5,000 $ $

05BS Repair Cap on Parapet Wall (to 24”) Paragraph 1.3.1.9.1

100 LF 500 $ $

05BT Repair Cap on Parapet Wall (to 40”) Paragraph 1.3.1.9.2

100 LF 500 $ $

05BU Install EPDM Boot on Pipe Penetrations to 18” dia Paragraph 1.3.1.9.3

1 EA 310 $ $

05BV Repair Pipe and Support Flashing to 4” dia Paragraph 1.3.1.9.3

10 EA 50 $ $

05BW Install Aluminum Gutter and Downspout Paragraph 1.3.1.10.1

50 LF 50 $ $

05BX Install concrete Splash Block Paragraph 1.3.1.10.2

1 EA 10 $ $

05BY Install Expansion Joint Paragraph 1.3.1.10.3

50 LF 600 $ $

05BZ Install metal pitch Pans Paragraph 1.3.1.10.4

4 EA 10 $ $

05CA Install Scupper in Parapet Wall Paragraph 1.3.1.10.5

1 EA 10 $ $

05CB Install Metal Drain Strainers & Clamp Rings Paragraph 1.3.1.10.6

1 EA 38 $ $

05CC Install Stationary Roof Ventilator

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

05CD Install Turbine roof Ventilator Paragraph 1.3.1.10.8

1 EA 10 $ $

05CE Extend pipe Vents Paragraph 1.3.1.10.9

1 LF 50 $ $

05CF Remove & Reinstall Rooftop Equipment Paragraph 1.3.1.10.10

1 EA 26 $ $

05CG Remove and Reinstall Heavy Rooftop Equipment Paragraph 1.3.1.10.11

1 EA 20 $ $

05CH Replace Fasteners Paragraph 1.3.1.11.1

100 EA 500 $ $

05CJ Install Elasto Tape on metal Seams Paragraph 1.3.1.11.2

100 LF 500 $ $

05CK Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.1.11.3

1 EA 50 $ $

001CL Remove and Replace Penetration Sealant <4”dia Paragraph 1.3.11.4

1 EA 50 $ $

05CM Rpr BUR w/Hydro Stop Paragraph 1.3.1.11.5

10 SF 1,000 $ $

05CN Spray or Roll Coating on PUF Roof Paragraph 1.3.1.11.6

100 SF 4,000 $ $

05CP Power Wash Roof Paragraph 1.3.1.11.7

100 SF 10,000 $ $

05CQ Sweep Roof Clean Paragraph 1.3.1.11.8

100 SF 5,000 $ $

05CR Clean Gutters, Downspouts, Roof Drains Paragraph 1.3.1.11.9

100 LF 2,200 $ $

05CS Install ½” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 3,000 $ $

05CT Install 5/8” Plywood Sheathing

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

05CU Install ¾” Plywood Sheathing Paragraph 1.3.1.12.1

100 SF 1,000 $ $

05CV Replace Nailers Paragraph 1.3.1.12.2

100 LF 500 $ $

05CW Replace Wood Fascia Paragraph 1.3.1.12.3

100 LF 500 $ $

05CX Install Fabricated Sheet Metal Paragraph 1.3.1.13.1

10 SF 500 $ $

05CY Install Prefinished Fabricated Sheetmetal Paragraph 1.3.1.13.2

10 SF 500 $ $

05CZ Replace Metal Roof Decking Paragraph 1.3.1.13.3

100 SF 32,000 $ $

05DA Paint Roof Vents & Rooftop Equipment Paragraph 1.3.1.14.1

100 SF 500 $ $

05DB Paint Wood Fascia Paragraph 1.3.1.14.2

100 LF 500 $ $

05DC Paint Metal Edge Flashing Paragraph 1.3.1.14.3

100 LF 500 $ $

05DD Asbestos Sampling and Testing Paragraph 1.3.1.15.1

1 EA 200 $ $

05DE Remove Asbestos Mastic Paragraph 1.3.1.15.2

10 SF 2,200 $ $

05DF Remove Asbestos Shingle Roofing Paragraph 1.3.1.15.3

100 SF 4,000 $ $

05DG Remove Asbestos BUR Paragraph 1.3.1.15.4

100 SF 133,000 $ $

05DH Install ACM Encapsulant Sheet Paragraph 1.3.1.15.5

100 SF 10,000 $ $

05DJ Install ACM Encapsulant Agent Paragraph 1.3.1.15.6

100 SF 10,000 $ $

05DK LBP Sampling and Testing

DESCRIPTION/MINIMUM

QTY PER PROJECT/PHASE UNIT EST QTY UNIT PRICE EXTENDED

AMOUNT

05DL Remove LBP Paragraph 1.3.1.15.8

100 SF 200 $ $

05DM Encapsulate LBP Paragraph 1.3.1.15.9

100 SF 500 $ $

05DN Perform Roof Inspection Paragraph 1.3.1.16.1

1 EA 10 $ $

05DP Perform Roof Flood Test Paragraph 1.3.1.16.2

1 EA 5 $ $

05DQ Install Roof Warranty Signs Paragraph 1.3.1.16.3

2 EA 40 $ $

05DR Replace Corroded Bridge Bolts Paragraph 1.3.1.11.10

10 EA 400 $ $

05DS Replace Corroded Bridge Bolts Paragraph 1.3.1.11.11

10 EA 400 $ $

05DT Percent Increase for Non-standard Hours Paragraph 1.3.5.1 $ 25,000 X % $

05DU Percent Increase for Creech AFB work Paragraph 1.3.5.3 $ 25,0000 X % $

05DV Percent Increase for Tonopah AFB work Paragraph 1.3.5.4 $ 1,250,000 X % $

ESTIMATED TOTAL FOR THE OPTION YEAR 4

(CLINs 05AA – 05DV): $

NOTE: The estimated quantities shown in the pricing schedules, Exhibits 01 through 05, are shown for

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$50,000.00 $15,000,000.00

CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE

The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

0001 $50,000.00 $15,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

$15,000.00

$4,500,000.00

CLAUSES INCORPORATED BY FULL TEXT

52.222-30 DAVIS-BACON ACT--PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD)

(DEC 2001)

(a) The wage determination issued under the Davis-Bacon Act by the Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, that is effective for an option to extend the term of the contract, will apply to that option period.

(b) The Contracting Officer will make no adjustment in contract price, other than provided for elsewhere in this contract, to cover any increases or decreases in wages and benefits as a result of-- (1) Incorporation of the Department of Labor's wage determination applicable at the exercise of the option to extend the term of the contract;

(2) Incorporation of a wage determination otherwise applied to the contract…