Attachment_4_CAFB_Labeling_Standards.pdf
PDF 965 KB Posted
- Attached to
- SOF Upgrade Electrical Hangars 195/196 Federal contract opportunity
- Solicitation number
- FA4855-16-R-0010
About this file
Attachment 4 CAFB Labeling Standards
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4855-16-R-0010-0001.pdf | ||
| Questions_and_Answers.pdf | ||
| Attachment_6_Wage_Determination.pdf | ||
| Attachment_3_CAFB_Architectural_Compatibility_Guide.pdf | ||
| Attachment_2_SOMS.pdf | ||
| FA4855-16-R-0010.pdf | ||
| Attachment_1_SOO.pdf | ||
| Attachment_5_CAFB_Electrical_Standards.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PATCH PANEL
TELECOMMUNICATIONS RACK
PORT ON PANEL
R1 -A -1
HORIZONTAL CABLES
TR1 - TR2
100 PR 24 AWG
CA01 301 - 400
CABLE NUMBER TERMINATED COUNT
TERMINATION LOCATIONS
CABLE SIZE
TR1 - TR2
12 FIBER MM
FO 01 1-12
TERMINATION LOCATIONS
FIBER CABLE NUMBER
SINGLE OR CABLE SIZE
CABLE GUAGE
FIBER TERMINATIONS
BUILDING BACKBONE CABLES
MMAC - 1 - X
R1 -A - X
TELECOMMUNICATIONS RACK PATCH PANEL
JACK NUMBER
DEVICE
CARD NUMBER
PORT NUMBER
PATCH CABLES
MULTIMODE
WARNING
IF THIS CLAMP OR CABLE
IS LOOSE OR MUST BE
REMOVED PLEASE CALL THE
BUILDING TELECOMMUNICATIONS
MANAGER
TMGB
TR1
ER1
TELECOMMUNICATIONS
MAIN GROUNDING
BUSBAR
TELECOMMUNICATIONS
ROOM
EQUIPMENT ROOM
GROUNDING
TBB
TGB
TGB
TBB
Attachment 4, FA4855-16-R-0010, 15 May 2015
OUTLET PORT
R1-A 1 2
PATCH PANEL LETTER
(Patch Panels will be lettered in order starting with A)
TELECOMMUNICATIONS RACK NUMBER
(Telecommunications Racks will be numbered numerically, starting with 1, i.e. R1, R2)
3 R1-A 4
JACK LOCATION LABELS
R1-A 1 2
R1-A 5 6
Jacks shall be arranged and labeled according to their location in a room. They shall be arranged clockwise in ascending order around the room while standing in the doorway looking into the room. Floor jack number arrangement should work in clockwise order, looking out the TR doorway. The 27 SOCS labeling scheme adheres to the requirements outlined in the TIA/EIA 606 telecommunication standard.
A
PATCH PANEL
NUMBER
OUTLET PORT
LOCATION
PATCH PANEL
SINGLE GANG DOUBLE GANG
R1-A 3 4 R1-A
3 4 R1-A
7 8
OUTLET PORT
(Ports will be numbered according to port number on patch panel. Ports will be numbered consecutively per quad face plate.)
1 R1-A 2
100 PR 24 AWG
CA01 301 - 400
CABLE NUMBER TERMINATED COUNT
CABLE SIZE
FO Bxx- Bxx 1-12 MM or SM
Fiber Optic Cable I.D.
FIBER CABLE NUMBER SINGLE OR
CABLE GUAGE
FIBER TERMINATIONS
OUTSIDE PLANT CABLES
MULTIMODE
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
File details come from the government source that posted it. Updated .