CZQZ160001-SOW_RUBBER_REMOVAL_0422.pdf
PDF 463 KB Posted
- Attached to
- Remove Rubber Runway 04/22 Federal contract opportunity
- Solicitation number
- FA4855-15-B-0014
About this file
Attachment 1 Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Runway_Rubber_Removal_Drawings.pdf | ||
| FA4855-15-B-0014-0001.doc | DOC document | |
| Questions_and_answers.docx | DOCX document | |
| DRAWING_SET_0422-CZQZ16-0001.pdf | ||
| CZQZ160001SOMS.pdf | ||
| Solicitation_FA4855-15-B-0014.doc | DOC document | |
| NM50.doc | DOC document | |
| Specifications_16-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
RUBBER REMOVAL RWY 04/22
Project Number: CZQZ16-0001
Cannon Air Force Base, New Mexico
20 May, 2015
1. STATEMENT OF NEED: IAW AFI 13-204 v3 paragraph 15.1.1.3.41.2 requirements for Runway 04/22 in order to prevent aircraft accidents or mishaps on the runways.
2. OBJECTIVES: The objectives of this work include but are not limited to:
Removing rubber and reflective markings within the designated runway 04/22 area and reapplication of reflective markings within the designated runway 04/22 area. All drawings described below are in accordance with the Civil Works Project Manual of Specifications:
a. Drawing set 04/22 sheet 1: SITE PLAN
b. Drawing set 04/22 sheet 2: TOUCHDOWN PLAN
c. Drawing set 04/22 sheet 3: DETAIL
PERIOD OF PERFORMANCE:
Period of performance is expected to be 30 days.
Attachment 1 FA4855-15-B-0014
File details come from the government source that posted it. Updated .