2015_FC's_Equipment_Maintenance_PWS_Sources_Sought_Draft_8_Jun_15.pdf
PDF 293 KB Posted
- Attached to
- Fitness / Gym Equipment Maintenance
- Solicitation number
- FA4830-15-Q-0068
About this file
FA4830-15-Q-0068 -- Fitness Equipment maintenance DRAFT PWS
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: FA4830-15-Q-0068 Contract No.: FA4830-15- Contract Title: Fitness Equipment Maintenance
DRAFT
23d Force Support Squadron
Fitness Equipment Maintenance Services
PERFORMANCE WORK STATEMENT
Current as of: 8 June 2015, Draft 3
23d Contracting Squadron Moody Air Force Base, Georgia
TABLE OF CONTENTS
PARAGRAPH TITLE
1 DESCRIPTION OF SERVICES
2 SERVICES SUMMARY (SS) TABLE
3 GOVERNMENT-FURNISHED PROPERTY AND
SERVICES
4 GENERAL INFORMATION
5 APPENDICES
Appendix A. Definitions Appendix B. Equipment List Appendix C. Repairs and Parts Request Form Appendix D. Maintenance Log Example
1. DESCRIPTION OF SERVICES.
1.1. General Description of Service. The Contractor shall provide all labor personnel, equipment tools, parts, materials, supervision, and other items and non-personal services necessary to perform routine inspections, preventative maintenance, and repairs of cardio and strength equipment as defined in this Performance Work Statement (PWS) within the Freedom 1 Fitness Center Complex/Building #404 & Annex/Building #400. (Equipment Maintenance Services) as defined in this (Performance Work Statement except where specified as Government-furnished property and services, at Moody AFB, Georgia. The Contractor shall perform to the standards in this contract.
1.1. General Description. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to perform gym equipment inspections, maintenance, and repairs as defined in this Performance Work Statement (PWS) except where specified as Government-furnished property and services, at Moody AFB, Georgia. The Contractor shall perform to the standards in this contract.
1.1.1. Contractor tasks include, but are not limited to the following: inspect, maintain and repair gym equipment in accordance with original equipment manufacturers (OEM) specifications, procedures, industry standards, and/or best practices,(in that order). The estimated quantities of work are listed in Appendix (B), Sunshade Inspection Checklist.
1.1.2. The Contractor shall submit reports and documentation as identified throughout this PWS. Requests for such reports and documentation and responses shall be coordinated through the Fitness Center Director (FCD), Contractor Officer Representative (COR), or the FCD Designee.
1.2. Location. Service will be performed at the Freedom 1 Fitness, 4851 Burrell St., Building 404 and the Annex Fitness Center Building 400, (both) on Moody AFB, GA 31699.
1.3. Hours of Operation. All work will be performed between the hours of 0500-2200 Monday through Thursday, 0500-2000 Friday. Federal holidays will be observed at the Freedom 1 Fitness Center as specified in 4.4.1. of this PWS.
1.4. Operational Requirements and Specific Tasks
DRAFT
1.4.1. Initial Inspection. An initial inspection shall be conducted by the contractor within 15 calendar days of contract award. The initial inspection is to allow the conctractor to develop a maintenance plan.
1.4.1.2. The initial inspection will allow the contractor to inspect all equipment listed in appendix (B) and to research the corresponding equipment manuals for manufacturer recommended maintenance requirements.
1.4.2. Maintenance Schedule. Within 5 business days following the initial inspection, the contractor shall submit a maintenance schedcule to the Fitness Center Director (FCD) and the Contract Officer Representative (COR) for approval.
1.4.2.1. The maintenance schedule shall include all manufacturer recommended maintenance for each piece of equiment listed in Appendix (B)
1.4.2.2. The maintenance schedule shall include all contractor recommended maintenance and inspections additional to manufacturers recommendations.
1.4.2.3. The maintenance schedule shall include all reparis identified in the intitial inspection, the dates they can be repaired, parts required and all associated costs.
1.4.2.4. The maintenance schedule shall include inspections and preventative maintenance at least monthly.
1.4.2.5. A maintenance schedule shall be updated, re-accomplished, and approved for each fiscal year, by the beginning of that fiscal year, for the duration of the contract.
1.4.2.6. All preventive maintenance and repairs will be documented on a maintenance log. An example maintenance log can be found in Appendix D. All logs, guides, specifications, and manuals used to perform this contract will be maintained by the Fitness Center staff at the front counter.
1.4.3. Inspections and Preventative Maintenance. All inspections and preventative maintenance shall be in accordance with the maintenance schedule submitted to the FCD and COR in accordance with paragraph 1.4.2 of this PWS.
1.4.3.1. Inpsections and preventative maintenance work shall be in accordance with manufactureres recommendations for each piece of equipment listed in appendix (B) and shall include, but is not limited to, lubrication, adjustments, functional checks, and preventive maintenance based upon the specific needs of the individual equipment, and replacement of all parts deemed necessary by the original equipment manufacturer recommendations.
DRAFT
1.4.3.2. Contractor shall be responsible for validtating through the FCD or COR all manufacturer warranties and equipment invoices to ensure times of maintenance, service, replacement parts, and equipment service is documented correctly. Contractor shall comply with all requirements to maintain equipment warranty in good standing.
1.4.4. Unscheduled Maintenance, Non-Routine Service Calls, and Emergency Repairs. Maintenance and repair is required on any piece of equipment listed in appendix (B) when the equipment no longer meets the requirements of manufacturer’s intended use. All reparis shall be accomplished in accordance with the manufacturers recommendations.
1.4.4.1. The FCD and the COR or designted representative are authorized to make calls to the contractor for unscheduled maintenance or non-routine services.
1.4.4.2. The contractor shall complete an on-site inspection of unscheduled maintneance or non-routine service calls within 3 business days. An anticipated time for repair, parts ordered, and associated cost shall be delivered to the FCD, COR, or dsignee for approval on the form in Appendix (C) at the end of the call.
1.4.4.3. Emergency Repairs. Emergency Repairs are those repairs designated by the FCD or COR, and repairs required on equipment vital to the operations of the Fitness Center or a Fitness Center Program. Equipment is vital if the Fitness Center Program would fail without the equipment’s use.
1.4.4.3.1. The FCD and COR are authorized to make calls for emergency repairs.
1.4.4.3.2. The contractor shall respond with an on-site inspection within 24 hours to inspect the equipment, make repairs if immediately possible, or determine the parts needed to make repairs. An anticipated time for repair, parts ordered, and associated cost shall be delivered to the FCD, COR, or dsignee for approval on the form in Appendix (C) at the end of the call.
1.4.5. Equipment Replacement Parts. Contractor shall request approval from FCD or the COR using the form in appendix (C) before ordering replacement parts or requesting manufacturer’s warranty service. When approval is received by the contractor, the contractor shall order the specified replacement parts within one business day. Only the original equipment manufacturer standard parts or a verifiable equal shall be used in repairs.
1.4.6. Contractor Requirements. Contractor shall be experienced in performing electrical, electronic, and mechanical maintenance on many different brands of cardio, strength, and fitness equipment listed in appendix (B)
DRAFT
2.0. SERVICE SUMMARY.
2.1. General. The purpose of this paragraph is to state the performance objectives, the paragraph where located in the PWS or SOW, and identify the performance thresholds (standards) to determine the overall effectiveness of services delivered to the Government.
Performance Objective
PWS or SOW Paragraph
Performance Threshold
SS-1
Inspection/Preventive Maintenance
Preventive Maintenance of those items in Appendix A will occur at regular intervals, as defined by Appendix B, IAW manufacturers’ specifications, and industry standards.
The contractor will accomplish all cleaning, repair and maintenance at manufactures standards and level
SS-2
Equipment Maintenance Service Repairs (Unscheduled and/or Non-routine)
Equipment listed in Appendix B will be repaired in accordance with current maintenance procedure, manufacturers’ specifications, industry standards and Appendix B.
Repair services rendered will result in fully operational equipment 95% of the time.
SS-3
Equipment Replacement parts
Equipment listed in Appendix B will require emergency repair (to the extent described above in “Equipment Repairs”) in circumstances wherein the equipment is inoperable and limits mission accomplishment IAW assessment of Fitness Center management.
Contractor responds to emergency service calls within 24 hours (barring natural disasters or installation defensive posture changes), and repair services rendered will result in fully operational equipment 100% of the time.
DRAFT
Contractor responds to emergency repair service calls within 24 hours.
3.0. Government-Furnished Services.
3.1. Refuse Collection. The base refuse and recycling services Contractor is responsible for the collection and removal of all trash and refuse. However, when the Contractor finds it necessary, at times, to dispose of refuse and trash generated as a result of this contract requirement, the Contractor may use the base dumpsters.
3.2. Emergency Medical Service. Moody Air Force Base Emergency Medical Technicians (EMTs) will provide emergency medical services, if required, on a reimbursable basis. The Contractor is responsible to reimburse the Government.
3.3. Utilities. The Government will furnish reasonable amounts of utilities to include electricity, water, sewage, and heating. The Contractor shall exercise responsible use of all utilities.
3.4. Smoking. The Contractor and/or his employees shall not smoke inside Government facilities and shall ensure that their work areas are neat, clean, and orderly. Contractor must smoke at approved locations.
3.5. Original Equipment Manufacturers Service Manuals. The Original equipment manufacturer service manuals will be kept at the Fitness Center Front Desk and will be available for Contractor use upon request.
4. GENERAL INFORMATION.
4.1. Contractor Personnel.
4.1.1. Contract Manager. The Contractor shall provide a contract manager who shall be responsible for the performance of work. The name of the contract manager and an alternate(s), who shall act for the Contractor when the manager is absent, shall be designated in writing to the CO prior to the contract start date.
4.1.1.1. The contract manager or alternate(s) shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract.
4.1.1.2. The contract manager or alternate(s) shall be available during standard duty hours within sixty (60) minutes to meet on the installation with Government personnel
DRAFT
designated by the CO discuss problem areas. After standard duty hours the manager or designated alternate shall be available within two (2) hours.
4.1.1.3. The contract manager and alternate(s) shall be able to read, write, speak, and understand English.
4.1.2. Contractor Employees. The CO may restrict the employment under this contract of any Contractor employee(s), or prospective contract employee(s) who is identified as a potential threat to the health, safety, security, general well being or the operational mission of the installation and its population.
4.1.2.1. Contract personnel shall present a neat appearance and be easily recognized.
This may be accomplished by wearing clothing bearing the name of the company (uniforms) or by wearing appropriate badges, which contain the company name and employee’s name. The Contractor is responsible for acquiring an appropriate number of badges to meet their needs at their own expense.
4.1.2.2. The Contractor shall ensure that employees have current and valid professional certifications before starting work. Vehicle operators shall have a valid Georgia driver’s license.
4.1.2.3. The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person could create a conflict of interest, nor shall the Contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval in accordance with DD 5500.7-R Joint ethics Regulation (JER), Chapter 2. In addition, the Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities, paragraph 3.
4.1.2.4. The Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station (PCS), change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall or active duty. The abrupt absence of these personnel could adversely affect the Contractor’s ability to perform. Their absence at any time shall not constitute an excuse for nonperformance under this contract.
4.2. Government Quality Assurance.
4.2.1. The Government will periodically evaluate the Contractor’s performance by appointing representatives Contracting Officer’s Representatives (CORs) to monitor Contractor performance to ensure services are received in accordance with the contract requirements. The CORs will evaluate the Contractor’s performance through intermittent on-site inspections of the
DRAFT
Contractor’s quality control program, receipt of complaints from base personnel, and/or COR surveillance and evaluation. The Government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. The Government may inspect contract services using a variety of methods.
4.3. Re-performance of Nonconforming Contractor Services.
4.3.1. Re-performance of Service. When service performed does not conform to contract requirements, the Contractor shall re-perform the service in conformity with the contract specifications at no additional cost to the Government. Re-performance of the service(s) shall commence immediately upon notification by the COR; and the Contractor shall have a sufficient workforce dedicated to ensure corrections are accomplished within 3 business days without degradation to standard services.
4.3.2. Acceptable Performance. Acceptable performance is achieved when the Contractor’s performance meets the minimum contract standard(s).
4.3.3. Unacceptable Performance. Unacceptable performance exists when the Contractor does not meet the minimum contract performance standard(s).
4.3.4. Performance that does not meet contract standards shall be dealt with as cited in accordance with 52.212-4, Contract Terms and Conditions—Commercial Items—(a) Inspection and Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or re-performance of nonconforming services at no increase in contract price. If repair/replacement or re-performance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services.
4.4. Hours of Operation.
4.4.1. Holidays. The Contractor is not required to provide services on the following days, in accordance with the DOL Wage Decision:
New Year’s Day 1 January
Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February
Good Friday Friday before Easter Memorial Day Last Monday in May
DRAFT
Independence Day 4 July Labor Day First Monday in September
Columbus Day Second Monday in October Veterans Day 11 November
Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
4.4.2. Good Friday--The Contractor may substitute the “Good Friday” holiday time-off for the day after Thanksgiving, which is usually considered a “family day” for the general base population. If the Contractor takes advantage of this option, this arrangement must be finalized between the CO, Contractor, and COR two (2) weeks prior to the holiday
4.4.2.1. On work days that have been declared “family days,” the Base may be minimally manned with many offices and facilities closed. On these days, the COR shall ensure that the Contractor has access to the work site.
NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday. Holidays falling on a Sunday will be observed on the following Monday.
4.4.3. Holiday Services. Services scheduled for a certain day of the week, but cannot be performed due to a holiday, shall be performed either the day before or the day after the holiday. If a service is scheduled on Monday and that Monday is a holiday, then the service shall be performed on the day after the holiday (Tuesday). Services scheduled for Friday and a holiday is on Friday, then the service shall be performed on the Thursday before the holiday.
4.5. Security Requirements.
4.5.1. All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the Government installation, shall abide by all security regulations of the installation.
4.5.1. Pass and Identification. Pass and identification items required for contract performance shall be obtained for Contractor personnel and non-Government-provided vehicles. Procurement of the appropriate passes and identification items are the responsibility of the Contractor.
4.5.1.2. The Contractor shall obtain personnel pass application forms from their Contract Administrator. The Contractor employee shall complete and carry the forms to the Security Forces personnel at the Visitors’ Center; vehicle registration, proof of insurance, and a valid driver’s license must be presented for all vehicles to be registered.
4.5.1.3. Contractor shall be responsible for retrieving pass and identification items from Contractor employees upon their departure from employment, prior to contract expiration date; these items shall be turned in to the personnel at the Visitors’ Center.
4.5.2. Listing of Employees. The Contractor shall maintain a current listing of employees. The list shall include the employee's name, social security number, and type of investigation if contract work involves access to Government-automated-information systems (AIS), unescorted entry to Air Force restricted areas, or other sensitive areas designated by the installation commander, or for access to unclassified sensitive information or sensitive equipment. The list shall be provided to the CO and the sponsoring agency’s Security Manager. An updated listing shall be provided when an employee's status or information changes.
4.5.3. Security Training. Contractor employees must receive initial and recurring security training from the Contractor’s representative concerning the “Security Requirements” associated with the contract on which the employee performs. The Government may provide additional security information to the Contractor for dissemination to employees as world events and security requirements change.
4.5.3.1. Key Control. The Contractor shall establish and implement methods of ensuring all keys and vault combinations issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
4.5.3.1.1. The Contractor shall immediately report to the COR or Program Manager any occurrences of lost or duplicated keys.
4.5.3.1.2. In the event keys, other than master keys, are lost or duplicated, the Contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the Government. The Government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government, and the total cost deducted from the monthly payment due the Contractor.
4.5.3.1.3. The Contractor shall prohibit the use of keys, issued by the Government, by any persons other than the Contractor’s employees and the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in performance of contract work requirements in those areas.
4.5.3.2. Lock Combinations. The Contractor shall control access to all Government-provided lock combinations to preclude unauthorized entry. The Contractor is not
DRAFT
authorized to record lock combinations without written approval by the Government Program Manager.
4.5.4. Traffic Laws. The Contractor and its employees shall comply with base s traffic regulations.
4.5.5. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately-owned vehicle(s) while on Moody AFB GA.
4.5.6. Physical Security. The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for Contractor use. The Contractor shall be responsible for safeguarding Government funds and monies received for services or products provided in performance of this contract. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
4.5.6.1. Fire Prevention. The Contractor is responsible for following Fire Prevention practices and procedures as set forth in AFI 32-2001, Fire Emergency Services Program.
4.5.7. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
4.5.7.1. Controlled Areas. The Contractor shall implement local base procedures for entry to Air Force controlled areas where contractor personnel will work.
4.5.8. Retrieving Identification Media. The Contractor shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires; e.g., retirement, etc.
4.5.9. For Official Use Only (FOUO). The Contractor shall comply with DoD 5400- 2R, Appendix C, Section 2, Information Security Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material
4.5.10. Additional Security Requirements. Additional security requirements, including Communications Security (COMSEC) User Requirements; Command, Control, Communications, and Computer (C4) Systems; Information Assurance (IA) Program;
and Operations Security (OPSEC), shall be complied with by Contractor personnel.
4.6. Safety Requirements.
4.6.1. Safety of personnel and performance shall conform to Office of Safety and Health Administration (OSHA) requirements as specified in AFI 91-301, Air Force Occupational and Environmental Safety, Fire Protection, and Health (AFOSH) Program.
4.6.2. Cell Phone Usage. Cell phone usage while driving on base is prohibited, unless one is using a completely “hands-free” device.
4.8. Government Performance of Services During Labor Strike.
4.8.1. The services called for under this PWS and at the direction of the CO, the Contractor agrees to remove its non-striking force from the performance site and not to interfere in any way with Government performance.
4.8.2. Contractor further agrees under such circumstances to permit the Government to use any essential Contractor-furnished property. The Government will equitably compensate the Contractor for use of such property.
4.8.3. Contractor shall not be entitled to payment for any performance period or parts thereof during which the Government assumes performance.
4.9. Records Management.
4.9.1. All records, files, documents, regardless of media (e.g., paper, electronic, etc.), as described in this PWS, are the responsibility of the Contractor and are the property of the Government and shall remain so upon termination or completion of the contract.
4.9.2. The Contractor shall keep these items current and maintain and dispose of them in accordance with the requirements established in Air Force Instruction (AFI) 33-322, Records Management Program, paragraph 5, Air Force Manual (AFMAN) 33-363, paragraph 6.4, Air Force Instruction (AFI) 33-364, paragraph 2.10, and the Air Force Records Disposition Schedule which may be accessed from the web address cited below:
https://www.my.af.mil/afrims/afrims/afrims/rims.cfm.4
4.9.3. Records shall be turned over to the Government upon completion of the contract, unless otherwise stated. All records are subject to the Freedom of Information and Privacy Act. The Moody AFB Records Management Office (23 CS/SCXKR), 257-3500, will provide assistance and training to the Contractor to ensure compliance with Federal record-keeping requirements.
4.10. Health and Safety on Government Installations.
https://www.my.af.mil/afrims/afrims/afrims/rims.cfm.4
DRAFT
4.11.1. In performing work under this contract on a Government installation, the contractor shall:
4.10.2. Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
4.12.3 Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
5. APPENDICES.
APPENDIX A
DEFINITIONS
General Definitions.
CO - Contracting Officer
Contract Management. Implementation of the Performance Plan (PP)/Quality Assurance Surveillance Plan (QASP) after contract award by the multi-functional team (MFT). It integrates the goals and objectives identified by the multi-functional team (MFT), oversight and performance management, and performance measurement in accordance with the Performance Plan or Quality Assurance Surveillance Plan.
Contracting Officer’s Representative (COR). Individuals designated to perform quality assessment functions, and oversee performance in accordance with the quality assurance surveillance plan (QASP). They serve as on-site technical managers assessing Contractor performance against contract performance standards.
Defective Service. Any service output that does not conform to contract requirements as stipulated in the Services Summary.
Functional Commander/Functional Director (FC/FD). The person responsible for a functional area at the Squadron level. For example, the Civil Engineer Squadron Commander is the Functional Commander for the Civil Engineering performance-based work statements.
Market Research. A continuous process for gathering data on service characteristics, suppliers’ capabilities, and current business practices, in addition to the analysis of that data to make acquisition decisions.
Multi-Functional Team (MFT). A team of stakeholders responsible for a service acquisition. Includes not only representatives of the technical and procurement communities, but also stakeholders of the service acquisition and the Contractor(s) who provide the service. This team could be a Business Requirements Advisory Group (BRAG), a Mission Area Acquisition Team (MAAT), an Integrated Product Team (IPT), working group, and A-76 IPT or Steering Group, etc. At Moody AFB GA this team is called the Multi-Functional Team (MFT).
Performance Assessment/Quality Assurance. A process that measures success towards achieving defined performance goals or objectives defined within the performance
DRAFT
thresholds in the services summary or the process of assessing progress towards achieving the objectives/goals developed in a Performance Plan.
Performance Management. The use of performance measurement information to effect positive change in organizational culture, systems, and processes, by helping to set agreed upon performance goals, allocating and prioritizing resources, informing managers to either confirm or change current policy or program direction(s) to meet those goals, and sharing results of performance in pursuing those goals.
Performance Management Assessment Program/Quality Assurance Program. A quality assurance program that is developed, planned, and managed to carry out cost-effectively all efforts to affect the quality of services. The Performance Management Assessment Program includes performance measurement and performance management by the multi-functional team (MFT).
Performance Objective. The outcome associated with successful contract performance in a specific area. This is a critical success factor in achieving the organization’s mission, vision and strategy which, if not achieved, would likely result in a significant decrease in customer satisfaction or risk mission failure. Obtaining multi-services/sub-services performed at a certain measurable standard and consistently ensures success in achieving the objectives critical to the mission.
Performance Threshold. The minimum standard of a performance objective required by the Government.
Quality Assurance Program Coordinator (QAPC). Mission support group individual, normally from the contracting activity, selected to coordinate and manage the Performance Management Assessment Program (Quality Assurance Program), in addition to the training of the CORs, COR Supervisors, and Functional Commanders when necessary.
Quality Control. Those actions taken by the Contractor to ensure the standards of performance of services as stated in the contract and PWS or SOW are obtained.
Quality Assurance. Those actions taken by the Government to ensure services meet the requirements of the Performance Work Statement (PWS) or Statement of Work (SOW) and contract.
Services Summary (SS). A summary of the performance objective(s) and performance threshold(s) required by the Government in contractor performance, along with the paragraph where the particular objective and threshold are located in the PWS or SOW.
APPENDIX B
EQUIPMENT LISTINGS
Location Equipment
Type Manufacturer Model Serial Number Life
Expectancy Weight room- Selectorized section AbCoster AbCoster CS2000 N/A
Upstairs track AbCoster AbCoster CS2000 N/A
Cardio Room -row 3
Cybex Arc Trainer Cybex 750AT
D0908750AT90004N08
Cardio Room -row 2
Elliptical Trainer Life Fitness 95XS
ASX108009
Cardio Rm-row
Elliptical Trainer Life Fitness 95XS
ASX108010
Cardio Room -row 2
Elliptical Trainer Life Fitness 95XS ASX108007
Cardio Room -row 2
Elliptical Trainer Life Fitness 95XS ASX108006
Cardio Room -row 2
Elliptical Trainer Life Fitness 95XS ASX108008
Cardio Room -row 2
Elliptical Trainer Life Fitness 95XS ASX108021
Family Fitness room
Elliptical Trainer 95XS ASX107789
Cardio Room -row 3
Elliptical Trainer Life Fitness 95XS ASX108005
Cardio Room -row 3
Elliptical Trainer Life Fitness 95XS ASX108011
Cardio Room -row 3
Elliptical Trainer Life Fitness 95XS ASX107882
DRAFT
Location Equipment type Manufacturer Model Serial Number Life
Expectancy Cardio Room -row 3 Elliptical Trainer Life Fitness 95XS ASX108012
Cardio Room -row 4
Incline Treadmill Free Motion FMTK72509.1 DD600290130
Free Weight room ISO Lateral
Row Hammer Strength ILROW E06 9531
Weight room - Selectorized section
Triceps Extension
Strength MTSTE MTSTE0612007
45 Degree Bench
Hammer Strength FWUB75 A03 6014
45 Degree Bench
Hammer Strength FWUB75 A03 6015
Free Weight room 4-way Neck Hammer
Strength PL4W D03 3442
Adjustable Bench
Hammer Strength FWMAB FWMAB0612116
Adjustable Bench
Hammer Strength FWMAB FWMAB0612110
Adjustable Bench
Hammer Strength FWMAB FWMAB0612117
Free Weight room
BASE TWIST
LEFT
Hammer Strength GBTL B02 795
Free Weight room
BASE TWIST
RIGHT
Hammer Strength GBTR B02 794
Free Weight room Across from squat rack
Decline Bench Storage
Rack(with A04 4429)
Hammer Strength OBWS A00 11261
Flat Bench Hammer Strength FWFB A02 11299
Flat Bench Hammer Strength FWFB A02 11296
DRAFT
Location/Equip #serial #
Equipment type Manufacturer Model Serial Number
Life Expectancy
Flat Bench Hammer Strength FWFB A02 11297
Free Weight room- Across from squat racks
Incline Bench (with A00
11262)
Hammer Strength OIP A04 6798
Free Weight room Across from squat rack
Incline Bench Storage Rack
(with A04 6798)
Hammer Strength OBWS A00 11262
Free Weight room
ISO Lateral Chest Press
Hammer Strength ILCB B06 3176
Free Weight room
ISO Lateral D.Y. Row
Hammer Strength FLDRW B05 1984
Free Weight room
ISO Lateral Press
Strength ILBPH D06 8707
MTS
Abdominal Crunch
Hammer Strength MTSAB MTSAB0612028
Weight room- Selectorized section
MTS Bicep Curl
Hammer Strength MTSBC MTSBC0612006
Weight room- Selectorized section
MTS Chest Press
Hammer Strength MTSCP MTSCP0612010
Weight room- Selectorized section
MTS Decline Press
Hammer Strength MTSDP MTSDP0612006
Weight room- Selectorized section
MTS Front Pulldown
Hammer Strength MTSFP MTSFP0612010
Weight room- Selectorized section
MTS Incline Press
Hammer Strength MTSIP MTSIP0612011
Weight room- Selectorized section
MTS Kneeling Leg Curl
Strength MTSKC MTSKC0612008
DRAFT
Location Equipment
Type Manufacturer Model Serial Number Life
Expectancy Weight room- Selectorized section
MTS Leg Extension
Hammer Strength MTSLE MTSLE0612007
Free Weight room MTS Row Hammer
Strength MTSRW MTSRW0612009
Weight room- Selectorized section
MTS Shoulder Press
Hammer Strength MTSSP MTSSP0612012
Free Weight room
Plate Loaded Lat Raise
Hammer Strength PLLR C02 2573
Free Weight room
Plate Loaded Linear Hack
Press
Hammer Strength PLLHP PLLHP0612023
Free Weight room
Plate Loaded Linear Hack
Press
Hammer Strength PLLHP PLLHP0911002
Free Weight room
Plate Loaded Linear Leg
Press
Hammer Strength HSLLP HSLLP0612058
Free Weight room
Plate Loaded Linear Leg
Press
Hammer Strength HSLLP HSLLP0911008
Free Weight room Pullover Hammer
Strength PLPO A03 2294
Free Weight room Seated Bicep Hammer
Strength PLBI D02 8368
Free Weight room Seated Calf Hammer
Strength PLCALF B10 8288
Free Weight room Seated Dip Hammer
Strength PLDIP B02 4140
Free Weight room
Seated/Standing Shrug
Hammer Strength PLSH A03 3487
Free Weight room
Side Crunch/Back Extension 44
Degree
Strength BWBE A03 6451
DRAFT
Location Equipment
Type Manufacturer Model Serial Number Life
Expectancy
Free Weight room
Side Crunch/Back Extension 44
Degree
Hammer Strength BWBE A03 6450
Free Weight room Smith Machine Hammer Strength HSSM HSSM0612045
Free Weight room Squat Rack/ Storage
Hammer Strength HDEMR/ STD-STOR A01 37/ A00 487
Free Weight room Squat Rack/ Storage
Hammer Strength HDEMR/ STD-STOR A01 36/ A00 486
Free Weight room Squat Rack/ Storage
Hammer Strength HDEMR/ STD-STOR A01 34/ A00 462
Free Weight Room Curl Bar Tree Hammer
Strength FWBAR A 4414
Free Weight room V-SQUAT Hammer Strength PLVSQ B02 3708
Free Weight room- Across from squat rack
Decline Bench (with A00
11261)
Strength ODB A04 4429
Weight room- Selectorized section Abdominal Life Fitness FZAB FZAB0612039
Free Weight room Adjustable
Cable Crossover (Multi-Jungle)
Life Fitness MJAXO-STA MJAXO0612027
Free Weight room Adjustable
Pulley (Multi- Jungle)
Life Fitness MJAP-STA MJAP0612070
Weight room- Selectorized section
Assisted Dip/Chin Life Fitness PSADCSE PSADCSE061205
Weight room- Selectorized section Back Extension Life Fitness FZBE FZBE0612026
Weight room- Selectorized section Bicep Curl Life Fitness FZBC FZBC0612031
Location
Equipment Type
Manufactu rer Model Serial Number Life
Expectancy
Weight room - Selectorized section Calf Extension Life
Fitness FZCE FZCE0612019
Weight room - Selectorized section Chest Press Life
Fitness
FZCP FZCP0612043
Free Weight room Dual Pulley Pulldown
(Multi-Jungle)
Life Fitness MJLPD-STA MJLPD0612031
Free Weight room
Dual Pulley Row (Multi-
Jungle)
Life Fitness MJRWD-STA MJRWD0612026
Free Weight room Lat Pulldown (Multi-Jungle)
Life Fitness MJLP STATION MJLPD0612059
Weight room- Selectorized section Lat Pulldown Life
Fitness PSPDSE PSPDSE0612034
Weight room- Selectorized section Leg Extension Life
Fitness FZLE FZLE0612047
Free Weight room Low Row (Multi-Jungle)
Life Fitness MJ ROW MFRW0612047
Free weight room Multi-Jungle Life
Fitness MJ-CORE MJCORE0612086
Free weight room Multi-Jungle Life
Fitness MJ-CORE MJCORE0612085
Weight room- Selectorized section
Pectoral Fly/Rear Deltoid
Life Fitness FXFRD FZFRD0612022
Weight room- Selectorized section
Pectoral Fly/Rear Deltoid
Life Fitness FZPEC FZPEC0612012
Weight room- Selectorized section Pulldown Life
Fitness FZPD FZPD0612033
Weight room- Selectorized section
Seated Leg Curl
Life Fitness FZSLC FZSLC0612039
DRAFT
Weight room - Selectorized section
Seated Leg Press
Life Fitness
FZSLC FZSLC0612039
Weight room - Selectorized section Shoulder Press Life
Fitness
FZSLP FZSLP0612049
Weight room - Selectorized section Tricep Press Life
Fitness
FZSP FZSP0612038
Free Weight room
Tricep Pulldown
(Multi-Jungle)
Life Fitness FZTP FZTP0612038
Old boxing room across from cardio room
Multi- Weighted Workout Station
MJTP-STA MJTP0612056
Cardio Room -row 1 AMT Precor AMT 835 AADRI29110005
Cardio Room -row 1 AMT Precor AMT 835 AADRI28110045
Cardio Room -row 1 AMT Precor AMT 835 AADRI29110006
Cardio Room -row 1 AMT Precor AMT 835 AADRI29110001
Cardio Room -row 1 AMT Precor AMT 835 AADRI29110002
Upstairs track
Cross Ramp- Elliptical Precor EFX 835 ADFXI12110028
Elliptical Precor EFX 835 ADFXI12110061
Elliptical Precor EFX 835 ADFXI12110017
Elliptical Precor EFX 835 ADFXI12110013
APPENDIX C
APPENDIX D
CARDIO EQUIPMENT CHECKLIST
CHECKLIST Cardiovascular Equipment Inspection Item:
Inspect crank bearings, belt tension Clean & Lubricate Chain, pedals/shafts w/30W oil Remove plastic side panels for access.
Vacuum dust under machine Wipe links; remove excess dust.
Adjust all components Clean & lubricate step chains w/30W oil Month Machine Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep AbCoster AbCoster Cybex Arc Trainer Free Motion Incline Treadmill
Incline Treadmill Life Fitness Elliptical Life Fitness Elliptical Life Fitness Elliptical Life Fitness Elliptical Life Fitness Elliptical Life Fitness Elliptical Life Fitness Elliptical Life Fitness Elliptical Life Fitness Elliptical Life Fitness Elliptical Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill
DRAFT
Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Life Fitness Treadmill Precor AMT Precor AMT Precor AMT Precor AMT Precor AMT Precor Stepper Precor Stepper Precor Recumbent Bike Precor Recumbent Bike Precor Recumbent Bike Precor Recumbent Bike Precor Recumbent Bike Precor Recumbent Bike Precor Recumbent Bike Precor Recumbent Bike Precor Upright Bike Precor Upright Bike Precor Upright Bike Precor Upright Bike Precor Upright Bike Precor Upright Bike Precor Upright Bike Precor Upright Bike Precor Upright Bike Precor Upright Bike Real Rider Spin Bike Real Rider Spin Bike Sci Fit Arm Cycle Star Trac Spin Bike 1 Star Trac Spin Bike 2 Star Trac Spin Bike 3 Star Trac Spin Bike 4 Star Trac Spin Bike 6 Star Trac Spin Bike 7 Star Trac Spin Bike 9 Star Trac Spin Bike 10
DRAFT
Star Trac Spin Bike 11 Star Trac Spin Bike 12 Star Trac Spin Bike 14 Star Trac Spin Bike 15 Star Trac Spin Bike 16 Star Trac Spin Bike 17 Star Trac Spin Bike 18 Star Trac Spin Bike 19 Star Trac Spin Bike 20 Star Trac Stairmill Star Trac Stairmill Star Trac Stairmill Star Trac Tread- Climber
| Performance Objective |
| General Definitions. |
File details come from the government source that posted it. Updated .