Attachment 1 - Price Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Answers_Continued.pdf | ||
| Questions_and_Answers.pdf | ||
| FA4830-12-R-0005_Airfield_Pavements_IDIQ_POC_Change.doc | DOC document | |
| FA4830-12-R-0005_Site_Visit_Attendance_Record.pdf | ||
| FA4830-12-R-0005_Airfield_Pavements_IDIQ_Solicitation_-_Amendment_One.pdf | ||
| Site_Visit_Conference_Reservation_Form_Amended.pdf | ||
| Question_Form_Amended.pdf | ||
| Waste_Management_Report.xls | XLS spreadsheet | |
| SAMPLE_PROJECT_-_Demolition_Area_Taxiway_E.pdf | ||
| FA4830-12-R-0005_Airfield_Pavements_IDIQ_Solicitation.pdf | ||
| Wage_Decision_GA_-_Lowndes.pdf | ||
| Wage_Decision_FL_-_Polk.pdf | ||
| Wage_Decision_FL_-_Highlands.pdf | ||
| Question_Form.pdf | ||
| AF_Form_66.pdf | ||
| Disclosure_of_Lobbying_Activities.pdf | ||
| SAMPLE_PROJECT_-_Site_Plan_Taxiway_E.pdf | ||
| Specifications.pdf | ||
| Site_Visit_Conference_Reservation_Form.pdf | ||
| Contractor_Information.pdf | ||
| SAMPLE_PROJECT_-_Statement_of_Work.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Breakout
| Totals | |
| Base Year | 0.00 |
| Option Year One | 0.00 |
| Option Year Two | 0.00 |
| Option Year Three | 0.00 |
| Option Year Four | 0.00 |
| TOTAL | $0.00 |
&LAttachment One&RFA4830-12-R-0005
Basic Year
| Price Schedule | ||||||
| Airfield Pavements IDIQ | ||||||
| CLIN 0001 - Base Year | ||||||
| Line | ||||||
| Item # | Description | Unit | Estimated Quantity | Unit Price | Extended Amount | |
| 1 | Demolition and excavation, existing concrete (not to include sawcutting) | CY | 996 | $0.00 | ||
| 2 | Excavation, existing aggregate/soils for placement of new | CY | 1,401 | $0.00 | ||
| 3 | Transport, excavated materials (incl. Dump fees) off base | CY | 2,398 | $0.00 | ||
| 4 | Transport, excavated materials (no dump fees) on base (2 miles round trip) | CY | 200 | $0.00 | ||
| 5 | Fill, in-place, compacted (obtaining, transporting, spreading, compacting) | CY | 381 | $0.00 | ||
| 6 | Aggregate, graded granite, 6" in place, compacted (obtaining, transporting, spreading, compacting) | CY | 794 | $0.00 | ||
| 7 | Testing, compaction, base course, sub-base, or subgrade (per 6" lift) | EA | 16 | $0.00 | ||
| 8 | Testing, concrete strength | EA | 28 | $0.00 | ||
| 9 | Testing, concrete slump | EA | 11 | $0.00 | ||
| 10 | Joint filler, expansion joint, 3/4" | LF | 475 | $0.00 | ||
| 11 | PCC crack, complete routing & sealing - Specification Section 03251 | LF | 243 | $0.00 | ||
| 12 | PCC Joint Resealing-fuel resistant, up to 3/4" width, pre-formed | LF | 6,237 | $0.00 | ||
| 13 | PCC Joint Resealing - fuel resistant, up to 1" width, poured Silicone | LF | 759 | $0.00 | ||
| 14 | PCC Joint Resealing - fuel resistant, up to 2-1/2" width, poured Silicone | LF | 162 | $0.00 | ||
| 15 | Sawcut concrete, up to 9" | LF | 713 | $0.00 | ||
| 16 | Sawcut concrete, 9" to 12" | LF | 300 | $0.00 | ||
| 17 | Sawcut concrete, 12" to 18" | LF | 150 | $0.00 | ||
| 18 | Concrete pavement, plain, in-place | CY | 1,793 | $0.00 | ||
| 19 | Concrete pavement, high early strength | CY | 14 | $0.00 | ||
| 20 | Dowels, 1"x16", (drilled/grouted into existing, new slab poured on remaining end) | EA | 200 | $0.00 | ||
| 21 | Dowels, 1"x16", installed (new slabs poured both ends) | EA | 200 | $0.00 | ||
| 22 | Welded Steel Fabric Reinforcing, 4x4 - W4xW4 | SF | 1,719 | $0.00 | ||
| 23 | Dowels, 1 1/4" x 20", installed (new slabs poured both ends) | EA | 1,620 | $0.00 | ||
| 24 | Grounding/Tie-Down Rods, installed in existing concrete pavement or in concrete pavement under construction. | EA | 41 | $0.00 | ||
| 25 | Mobilization, for Grounding/Tie-Down Rods projects that do not include pavement work | EA | 1 | $0.00 | ||
| 26 | Complete spall repair by full depth patch, (not to include saw cutting) | SF-IN | 972 | $0.00 | ||
| 27 | Port-a-John, rental (per 30 days, pumped weekly) | EA | 5 | $0.00 | ||
| 28 | Rubber Removal | SF | 200 | $0.00 | ||
| 29 | Paint Removal | SF | 200 | $0.00 | ||
| 30 | Pavement Markings, Airfields - Specification Section 02577 | SF | 1,215 | $0.00 | ||
| 31 | Airfield and Roadway Pavement Marking - Specification Section 02579 | SF | 10,000 | $0.00 | ||
| 32 | Temporary Grassing - - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 33 | Grass - Pesacola Bahia - Hydroseed or Seed - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 34 | Grass - Pesacola Bahia Sod - IAW GA DOT SPECS, 2001 EDITION | SY | 1 | $0.00 | ||
| 35 | Aircraft Traffic Interruptions on Runways | HR | 15 | $0.00 | ||
| 36 | Demolition and excavation, existing asphaltic pavement overlaid on portland cement concrete (including sawcutting) | CY | 16 | $0.00 | ||
| 37 | Demolition and excavation of existing asphaltic pavement (including sawcutting) | CY | 16 | $0.00 | ||
| 38 | Asphaltic Concrete Pavement | SY-IN | 810 | $0.00 | ||
| 39 | Soil Erosion and Sedimentation Plan | EA | 3 | $0.00 | ||
| 40 | Lowndes County Land Disturbance Permit and Application Preparation | EA | 3 | $0.00 | ||
| 41 | NPDES Permit | AC | 3 | $0.00 | ||
| 42 | Monitoring Erosion and Sedimentation BMP's | DAY | 270 | $0.00 | ||
| 43 | Storm Water Run-Off Samples and Sample Reports | EA | 10 | $0.00 | ||
| 44 | Temporary Silt Fence, Type B (Obtaining, Installation, and Removing) | LF | 1,215 | $0.00 | ||
| 45 | Hay or Straw Bales (Obtaining, Installation, and Removing) | LF | 324 | $0.00 | ||
| 46 | Inlet Sediment Trap (Obtaining, Installation, and Removing) | EA | 3 | $0.00 | ||
| 47 | Mobilization/Demobilization to/from Avon Park, FL | EA | 2 | $0.00 | ||
| Subtotal Base Year | $0.00 |
&LAttachment One&RFA4830-12-R-0005 &C
Option One
| Price Schedule | ||||||
| Airfield Pavements IDIQ | ||||||
| CLIN 1001 - Option Year One | ||||||
| Line | ||||||
| Item # | Description | Unit | Estimated Quantity | Unit Price | Extended Amount | |
| 1 | Demolition and excavation, existing concrete (not to include sawcutting) | CY | 1,107 | $0.00 | ||
| 2 | Excavation, existing aggregate/soils for placement of new | CY | 1,557 | $0.00 | ||
| 3 | Transport, excavated materials (incl. Dump fees) off base | CY | 2,664 | $0.00 | ||
| 4 | Transport, excavated materials (no dump fees) on base (2 miles round trip) | CY | 200 | $0.00 | ||
| 5 | Fill, in-place, compacted (obtaining, transporting, spreading, compacting) | CY | 423 | $0.00 | ||
| 6 | Aggregate, graded granite, 6" in place, compacted (obtaining, transporting, spreading, compacting) | CY | 882 | $0.00 | ||
| 7 | Testing, compaction, base course, sub-base, or subgrade (per 6" lift) | EA | 18 | $0.00 | ||
| 8 | Testing, concrete strength | EA | 32 | $0.00 | ||
| 9 | Testing, concrete slump | EA | 13 | $0.00 | ||
| 10 | Joint filler, expansion joint, 3/4" | LF | 527 | $0.00 | ||
| 11 | PCC crack, complete routing & sealing - Specification Section 03251 | LF | 270 | $0.00 | ||
| 12 | PCC Joint Resealing-fuel resistant, up to 3/4" width, pre-formed | LF | 6,930 | $0.00 | ||
| 13 | PCC Joint Resealing - fuel resistant, up to 1" width, poured Silicone | LF | 843 | $0.00 | ||
| 14 | PCC Joint Resealing - fuel resistant, up to 2-1/2" width, poured Silicone | LF | 180 | $0.00 | ||
| 15 | Sawcut concrete, up to 9" | LF | 792 | $0.00 | ||
| 16 | Sawcut concrete, 9" to 12" | LF | 300 | $0.00 | ||
| 17 | Sawcut concrete, 12" to 18" | LF | 150 | $0.00 | ||
| 18 | Concrete pavement, plain, in-place | CY | 1,992 | $0.00 | ||
| 19 | Concrete pavement, high early strength | CY | 14 | $0.00 | ||
| 20 | Dowels, 1"x16", (drilled/grouted into existing, new slab poured on remaining end) | EA | 200 | $0.00 | ||
| 21 | Dowels, 1"x16", installed (new slabs poured both ends) | EA | 200 | $0.00 | ||
| 22 | Welded Steel Fabric Reinforcing, 4x4 - W4xW4 | SF | 1,910 | $0.00 | ||
| 23 | Dowels, 1 1/4" x 20", installed (new slabs poured both ends) | EA | 1,800 | $0.00 | ||
| 24 | Grounding/Tie-Down Rods, installed in existing concrete pavement or in concrete pavement under construction. | EA | 45 | $0.00 | ||
| 25 | Mobilization, for Grounding/Tie-Down Rods projects that do not include pavement work | EA | 1 | $0.00 | ||
| 26 | Complete spall repair by full depth patch, (not to include saw cutting) | SF-IN | 1,080 | $0.00 | ||
| 27 | Port-a-John, rental (per 30 days, pumped weekly) | EA | 5 | $0.00 | ||
| 28 | Rubber Removal | SF | 200 | $0.00 | ||
| 29 | Paint Removal | SF | 200 | $0.00 | ||
| 30 | Pavement Markings, Airfields - Specification Section 02577 | SF | 1,350 | $0.00 | ||
| 31 | Airfield and Roadway Pavement Marking - Specification Section 02579 | SF | 10,000 | $0.00 | ||
| 32 | Temporary Grassing - - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 33 | Grass - Pesacola Bahia - Hydroseed or Seed - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 34 | Grass - Pesacola Bahia Sod - IAW GA DOT SPECS, 2001 EDITION | SY | 1 | $0.00 | ||
| 35 | Aircraft Traffic Interruptions on Runways | HR | 15 | $0.00 | ||
| 36 | Demolition and excavation, existing asphaltic pavement overlaid on portland cement concrete (including sawcutting) | CY | 18 | $0.00 | ||
| 37 | Demolition and excavation of existing asphaltic pavement (including sawcutting) | CY | 18 | $0.00 | ||
| 38 | Asphaltic Concrete Pavement | SY-IN | 900 | $0.00 | ||
| 39 | Soil Erosion and Sedimentation Plan | EA | 3 | $0.00 | ||
| 40 | Lowndes County Land Disturbance Permit and Application Preparation | EA | 3 | $0.00 | ||
| 41 | NPDES Permit | AC | 3 | $0.00 | ||
| 42 | Monitoring Erosion and Sedimentation BMP's | DAY | 270 | $0.00 | ||
| 43 | Storm Water Run-Off Samples and Sample Reports | EA | 10 | $0.00 | ||
| 44 | Temporary Silt Fence, Type B (Obtaining, Installation, and Removing) | LF | 1,350 | $0.00 | ||
| 45 | Hay or Straw Bales (Obtaining, Installation, and Removing) | LF | 360 | $0.00 | ||
| 46 | Inlet Sediment Trap (Obtaining, Installation, and Removing) | EA | 3 | $0.00 | ||
| 47 | Mobilization/Demobilization to/from Avon Park, FL | EA | 2 | $0.00 | ||
| Subtotal Option One | $0.00 |
&LAttachment One&RFA4830-12-R-0005
Option Two
| Price Schedule | ||||||
| Airfield Pavements IDIQ | ||||||
| CLIN 2001 - Option Year Two | ||||||
| Line | ||||||
| Item # | Description | Unit | Estimated Quantity | Unit Price | Extended Amount | |
| 1 | Demolition and excavation, existing concrete (not to include sawcutting) | CY | 1,230 | $0.00 | ||
| 2 | Excavation, existing aggregate/soils for placement of new | CY | 1,730 | $0.00 | ||
| 3 | Transport, excavated materials (incl. Dump fees) off base | CY | 2,960 | $0.00 | ||
| 4 | Transport, excavated materials (no dump fees) on base (2 miles round trip) | CY | 200 | $0.00 | ||
| 5 | Fill, in-place, compacted (obtaining, transporting, spreading, compacting) | CY | 470 | $0.00 | ||
| 6 | Aggregate, graded granite, 6" in place, compacted (obtaining, transporting, spreading, compacting) | CY | 980 | $0.00 | ||
| 7 | Testing, compaction, base course, sub-base, or subgrade (per 6" lift) | EA | 20 | $0.00 | ||
| 8 | Testing, concrete strength | EA | 35 | $0.00 | ||
| 9 | Testing, concrete slump | EA | 14 | $0.00 | ||
| 10 | Joint filler, expansion joint, 3/4" | LF | 586 | $0.00 | ||
| 11 | PCC crack, complete routing & sealing - Specification Section 03251 | LF | 300 | $0.00 | ||
| 12 | PCC Joint Resealing-fuel resistant, up to 3/4" width, pre-formed | LF | 7,700 | $0.00 | ||
| 13 | PCC Joint Resealing - fuel resistant, up to 1" width, poured Silicone | LF | 937 | $0.00 | ||
| 14 | PCC Joint Resealing - fuel resistant, up to 2-1/2" width, poured Silicone | LF | 200 | $0.00 | ||
| 15 | Sawcut concrete, up to 9" | LF | 880 | $0.00 | ||
| 16 | Sawcut concrete, 9" to 12" | LF | 300 | $0.00 | ||
| 17 | Sawcut concrete, 12" to 18" | LF | 150 | $0.00 | ||
| 18 | Concrete pavement, plain, in-place | CY | 2,213 | $0.00 | ||
| 19 | Concrete pavement, high early strength | CY | 14 | $0.00 | ||
| 20 | Dowels, 1"x16", (drilled/grouted into existing, new slab poured on remaining end) | EA | 200 | $0.00 | ||
| 21 | Dowels, 1"x16", installed (new slabs poured both ends) | EA | 200 | $0.00 | ||
| 22 | Welded Steel Fabric Reinforcing, 4x4 - W4xW4 | SF | 2,122 | $0.00 | ||
| 23 | Dowels, 1 1/4" x 20", installed (new slabs poured both ends) | EA | 2,000 | $0.00 | ||
| 24 | Grounding/Tie-Down Rods, installed in existing concrete pavement or in concrete pavement under construction. | EA | 50 | $0.00 | ||
| 25 | Mobilization, for Grounding/Tie-Down Rods projects that do not include pavement work | EA | 1 | $0.00 | ||
| 26 | Complete spall repair by full depth patch, (not to include saw cutting) | SF-IN | 1,200 | $0.00 | ||
| 27 | Port-a-John, rental (per 30 days, pumped weekly) | EA | 6 | $0.00 | ||
| 28 | Rubber Removal | SF | 200 | $0.00 | ||
| 29 | Paint Removal | SF | 200 | $0.00 | ||
| 30 | Pavement Markings, Airfields - Specification Section 02577 | SF | 1,500 | $0.00 | ||
| 31 | Airfield and Roadway Pavement Marking - Specification Section 02579 | SF | 10,000 | $0.00 | ||
| 32 | Temporary Grassing - - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 33 | Grass - Pesacola Bahia - Hydroseed or Seed - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 34 | Grass - Pesacola Bahia Sod - IAW GA DOT SPECS, 2001 EDITION | SY | 1 | $0.00 | ||
| 35 | Aircraft Traffic Interruptions on Runways | HR | 15 | $0.00 | ||
| 36 | Demolition and excavation, existing asphaltic pavement overlaid on portland cement concrete (including sawcutting) | CY | 20 | $0.00 | ||
| 37 | Demolition and excavation of existing asphaltic pavement (including sawcutting) | CY | 20 | $0.00 | ||
| 38 | Asphaltic Concrete Pavement | SY-IN | 1,000 | $0.00 | ||
| 39 | Soil Erosion and Sedimentation Plan | EA | 3 | $0.00 | ||
| 40 | Lowndes County Land Disturbance Permit and Application Preparation | EA | 3 | $0.00 | ||
| 41 | NPDES Permit | AC | 3 | $0.00 | ||
| 42 | Monitoring Erosion and Sedimentation BMP's | DAY | 270 | $0.00 | ||
| 43 | Storm Water Run-Off Samples and Sample Reports | EA | 10 | $0.00 | ||
| 44 | Temporary Silt Fence, Type B (Obtaining, Installation, and Removing) | LF | 1,500 | $0.00 | ||
| 45 | Hay or Straw Bales (Obtaining, Installation, and Removing) | LF | 400 | $0.00 | ||
| 46 | Inlet Sediment Trap (Obtaining, Installation, and Removing) | EA | 3 | $0.00 | ||
| 47 | Mobilization/Demobilization to/from Avon Park, FL | EA | 2 | $0.00 | ||
| Subtotal Option Two | $0.00 |
&LAttachment One&RFA4830-12-R-0005
Option Three
| Price Schedule | ||||||
| Airfield Pavements IDIQ | ||||||
| CLIN 3001 - Option Year Three | ||||||
| Line | ||||||
| Item # | Description | Unit | Estimated Quantity | Unit Price | Extended Amount | |
| 1 | Demolition and excavation, existing concrete (not to include sawcutting) | CY | 1,353 | $0.00 | ||
| 2 | Excavation, existing aggregate/soils for placement of new | CY | 1,903 | $0.00 | ||
| 3 | Transport, excavated materials (incl. Dump fees) off base | CY | 3,256 | $0.00 | ||
| 4 | Transport, excavated materials (no dump fees) on base (2 miles round trip) | CY | 200 | $0.00 | ||
| 5 | Fill, in-place, compacted (obtaining, transporting, spreading, compacting) | CY | 517 | $0.00 | ||
| 6 | Aggregate, graded granite, 6" in place, compacted (obtaining, transporting, spreading, compacting) | CY | 1,078 | $0.00 | ||
| 7 | Testing, compaction, base course, sub-base, or subgrade (per 6" lift) | EA | 22 | $0.00 | ||
| 8 | Testing, concrete strength | EA | 39 | $0.00 | ||
| 9 | Testing, concrete slump | EA | 15 | $0.00 | ||
| 10 | Joint filler, expansion joint, 3/4" | LF | 645 | $0.00 | ||
| 11 | PCC crack, complete routing & sealing - Specification Section 03251 | LF | 330 | $0.00 | ||
| 12 | PCC Joint Resealing-fuel resistant, up to 3/4" width, pre-formed | LF | 8,470 | $0.00 | ||
| 13 | PCC Joint Resealing - fuel resistant, up to 1" width, poured Silicone | LF | 1.031 | $0.00 | ||
| 14 | PCC Joint Resealing - fuel resistant, up to 2-1/2" width, poured Silicone | LF | 220 | $0.00 | ||
| 15 | Sawcut concrete, up to 9" | LF | 968 | $0.00 | ||
| 16 | Sawcut concrete, 9" to 12" | LF | 300 | $0.00 | ||
| 17 | Sawcut concrete, 12" to 18" | LF | 150 | $0.00 | ||
| 18 | Concrete pavement, plain, in-place | CY | 2,434 | $0.00 | ||
| 19 | Concrete pavement, high early strength | CY | 14 | $0.00 | ||
| 20 | Dowels, 1"x16", (drilled/grouted into existing, new slab poured on remaining end) | EA | 200 | $0.00 | ||
| 21 | Dowels, 1"x16", installed (new slabs poured both ends) | EA | 200 | $0.00 | ||
| 22 | Welded Steel Fabric Reinforcing, 4x4 - W4xW4 | SF | 2,334 | $0.00 | ||
| 23 | Dowels, 1 1/4" x 20", installed (new slabs poured both ends) | EA | 2,200 | $0.00 | ||
| 24 | Grounding/Tie-Down Rods, installed in existing concrete pavement or in concrete pavement under construction. | EA | 55 | $0.00 | ||
| 25 | Mobilization, for Grounding/Tie-Down Rods projects that do not include pavement work | EA | 1 | $0.00 | ||
| 26 | Complete spall repair by full depth patch, (not to include saw cutting) | SF-IN | 1,320 | $0.00 | ||
| 27 | Port-a-John, rental (per 30 days, pumped weekly) | EA | 7 | $0.00 | ||
| 28 | Rubber Removal | SF | 200 | $0.00 | ||
| 29 | Paint Removal | SF | 200 | $0.00 | ||
| 30 | Pavement Markings, Airfields - Specification Section 02577 | SF | 1,650 | $0.00 | ||
| 31 | Airfield and Roadway Pavement Marking - Specification Section 02579 | SF | 10,000 | $0.00 | ||
| 32 | Temporary Grassing - - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 33 | Grass - Pesacola Bahia - Hydroseed or Seed - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 34 | Grass - Pesacola Bahia Sod - IAW GA DOT SPECS, 2001 EDITION | SY | 1 | $0.00 | ||
| 35 | Aircraft Traffic Interruptions on Runways | HR | 15 | $0.00 | ||
| 36 | Demolition and excavation, existing asphaltic pavement overlaid on portland cement concrete (including sawcutting) | CY | 22 | $0.00 | ||
| 37 | Demolition and excavation of existing asphaltic pavement (including sawcutting) | CY | 22 | $0.00 | ||
| 38 | Asphaltic Concrete Pavement | SY-IN | 1,100 | $0.00 | ||
| 39 | Soil Erosion and Sedimentation Plan | EA | 3 | $0.00 | ||
| 40 | Lowndes County Land Disturbance Permit and Application Preparation | EA | 3 | $0.00 | ||
| 41 | NPDES Permit | AC | 3 | $0.00 | ||
| 42 | Monitoring Erosion and Sedimentation BMP's | DAY | 270 | $0.00 | ||
| 43 | Storm Water Run-Off Samples and Sample Reports | EA | 10 | $0.00 | ||
| 44 | Temporary Silt Fence, Type B (Obtaining, Installation, and Removing) | LF | 1,650 | $0.00 | ||
| 45 | Hay or Straw Bales (Obtaining, Installation, and Removing) | LF | 440 | $0.00 | ||
| 46 | Inlet Sediment Trap (Obtaining, Installation, and Removing) | EA | 3 | $0.00 | ||
| 47 | Mobilization/Demobilization to/from Avon Park, FL | EA | 2 | $0.00 | ||
| Subtotal Option Three | $0.00 |
&LAttachment One&RFA4830-12-R-0005
Option Four
| Price Schedule | ||||||
| Airfield Pavements IDIQ | ||||||
| CLIN 4001 - Option Year Four | ||||||
| Line | ||||||
| Item # | Description | Unit | Estimated Quantity | Unit Price | Extended Amount | |
| 1 | Demolition and excavation, existing concrete (not to include sawcutting) | CY | 1,488 | $0.00 | ||
| 2 | Excavation, existing aggregate/soils for placement of new | CY | 2,093 | $0.00 | ||
| 3 | Transport, excavated materials (incl. Dump fees) off base | CY | 3,582 | $0.00 | ||
| 4 | Transport, excavated materials (no dump fees) on base (2 miles round trip) | CY | 200 | $0.00 | ||
| 5 | Fill, in-place, compacted (obtaining, transporting, spreading, compacting) | CY | 569 | $0.00 | ||
| 6 | Aggregate, graded granite, 6" in place, compacted (obtaining, transporting, spreading, compacting) | CY | 1,186 | $0.00 | ||
| 7 | Testing, compaction, base course, sub-base, or subgrade (per 6" lift) | EA | 24 | $0.00 | ||
| 8 | Testing, concrete strength | EA | 42 | $0.00 | ||
| 9 | Testing, concrete slump | EA | 17 | $0.00 | ||
| 10 | Joint filler, expansion joint, 3/4" | LF | 709 | $0.00 | ||
| 11 | PCC crack, complete routing & sealing - Specification Section 03251 | LF | 363 | $0.00 | ||
| 12 | PCC Joint Resealing-fuel resistant, up to 3/4" width, pre-formed | LF | 9,317 | $0.00 | ||
| 13 | PCC Joint Resealing - fuel resistant, up to 1" width, poured Silicone | LF | 1,134 | $0.00 | ||
| 14 | PCC Joint Resealing - fuel resistant, up to 2-1/2" width, poured Silicone | LF | 242 | $0.00 | ||
| 15 | Sawcut concrete, up to 9" | LF | 1,065 | $0.00 | ||
| 16 | Sawcut concrete, 9" to 12" | LF | 300 | $0.00 | ||
| 17 | Sawcut concrete, 12" to 18" | LF | 150 | $0.00 | ||
| 18 | Concrete pavement, plain, in-place | CY | 2,678 | $0.00 | ||
| 19 | Concrete pavement, high early strength | CY | 14 | $0.00 | ||
| 20 | Dowels, 1"x16", (drilled/grouted into existing, new slab poured on remaining end) | EA | 200 | $0.00 | ||
| 21 | Dowels, 1"x16", installed (new slabs poured both ends) | EA | 200 | $0.00 | ||
| 22 | Welded Steel Fabric Reinforcing, 4x4 - W4xW4 | SF | 2,568 | $0.00 | ||
| 23 | Dowels, 1 1/4" x 20", installed (new slabs poured both ends) | EA | 2,420 | $0.00 | ||
| 24 | Grounding/Tie-Down Rods, installed in existing concrete pavement or in concrete pavement under construction. | EA | 61 | $0.00 | ||
| 25 | Mobilization, for Grounding/Tie-Down Rods projects that do not include pavement work | EA | 1 | $0.00 | ||
| 26 | Complete spall repair by full depth patch, (not to include saw cutting) | SF-IN | 1,452 | $0.00 | ||
| 27 | Port-a-John, rental (per 30 days, pumped weekly) | EA | 7 | $0.00 | ||
| 28 | Rubber Removal | SF | 200 | $0.00 | ||
| 29 | Paint Removal | SF | 200 | $0.00 | ||
| 30 | Pavement Markings, Airfields - Specification Section 02577 | SF | 1,815 | $0.00 | ||
| 31 | Airfield and Roadway Pavement Marking - Specification Section 02579 | SF | 10,000 | $0.00 | ||
| 32 | Temporary Grassing - - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 33 | Grass - Pesacola Bahia - Hydroseed or Seed - IAW GA DOT SPECS, 2001 EDITION | AC | 1 | $0.00 | ||
| 34 | Grass - Pesacola Bahia Sod - IAW GA DOT SPECS, 2001 EDITION | SY | 1 | $0.00 | ||
| 35 | Aircraft Traffic Interruptions on Runways | HR | 15 | $0.00 | ||
| 36 | Demolition and excavation, existing asphaltic pavement overlaid on portland cement concrete (including sawcutting) | CY | 24 | $0.00 | ||
| 37 | Demolition and excavation of existing asphaltic pavement (including sawcutting) | CY | 24 | $0.00 | ||
| 38 | Asphaltic Concrete Pavement | SY-IN | 1,210 | $0.00 | ||
| 39 | Soil Erosion and Sedimentation Plan | EA | 3 | $0.00 | ||
| 40 | Lowndes County Land Disturbance Permit and Application Preparation | EA | 3 | $0.00 | ||
| 41 | NPDES Permit | AC | 3 | $0.00 | ||
| 42 | Monitoring Erosion and Sedimentation BMP's | DAY | 270 | $0.00 | ||
| 43 | Storm Water Run-Off Samples and Sample Reports | EA | 10 | $0.00 | ||
| 44 | Temporary Silt Fence, Type B (Obtaining, Installation, and Removing) | LF | 1,815 | $0.00 | ||
| 45 | Hay or Straw Bales (Obtaining, Installation, and Removing) | LF | 484 | $0.00 | ||
| 46 | Inlet Sediment Trap (Obtaining, Installation, and Removing) | EA | 3 | $0.00 | ||
| 47 | Mobilization/Demobilization to/from Avon Park, FL | EA | 2 | $0.00 | ||
| Subtotal Option 4 | $0.00 |