Attachment_05_-_AF_Form_66.xlsx
XLSX spreadsheet 44 KB Posted
- Attached to
- Repair Multiple 6000 Area Facilities Federal contract opportunity
- Solicitation number
- FA4819-19-R-A024
About this file
Attachment 05 - AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA's_-_6000_Area.xlsx | XLSX spreadsheet | |
| APPENDIX_A_6000_Area_Facilities_Multi_XLWU198140_Rev5.docx | DOCX document | |
| QA's_-_6000_Area.xlsx | XLSX spreadsheet | |
| Solicitation_Amendment_FA481919RA0240002_SF_30.pdf | ||
| APPENDIX_A_6000_Area_Facilities_Revised_9-3-19.pdf | ||
| QA's_-_6000_Area.xlsx | XLSX spreadsheet | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| Amendment_0001_-_SF_30.pdf | ||
| Attachment_04_-_Wage_Determination_4_Jan_2019.pdf | ||
| Attachment_11_-_Insurance_Requirements.pdf | ||
| Attachment_01_-_Statement_of_Work_6_Aug_2019.pdf | ||
| Attachment_03_-_Appendix_B_Photos_20_May_2019.pdf | ||
| Attachment_02_-_Appendix_A_Scope_of_Work_6_Aug_2019.pdf | ||
| Attachment_06_-_AF_Form_3000.pdf | ||
| Attachment_09_General_Financial_Information.pdf | ||
| Attachment_10_-_Sample_RFI.PDF | ||
| Attachment_08_-_AF3065.pdf | ||
| Solicitation_-_FA481919RA024.pdf | ||
| Attachment_07_-_AF_3064.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 SCHEDULE OF MATERIAL SUBMITTALS Project No. XLWU 19-8140 Repair 6000 Area Facilities: B6011, B6017, B6021, B6025, B6026, B6027, B6031, B6070, B6072, 26055, B6051, B6053, B6054, B6055, B6056, and B6085
Solicitation/Contract Number
FA4890-XX-X-XXXX-XXXX
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST REPORTS | OTHER | ||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||||||||||
| COMPLETED TABLE TO BE PROVIDED WITH FULLY EDITED SPECIFICATIONS AT 95% DESIGN SUBMITTAL | |||||||||||||||||||||
| DIGITAL SUBMISSIONS WHEREVER POSSIBLE UNLESS OTHERWISED DIRECTED - SUBMITTALS TO BE ACCOMPANIED BY AF FORM 3000 | |||||||||||||||||||||
| 1 | Master Document List | See SOW | |||||||||||||||||||
| 2 | Requests for Information (RFI) | Includes any attachments | |||||||||||||||||||
| 3 | RFI Tabular Report | Contractor to keep record | |||||||||||||||||||
| 4 | RFI Tracking Sheet | Contractor to keep track of serialized RFI submissions and reponses | |||||||||||||||||||
| 5 | Integrated Master Schedule | See SOW | |||||||||||||||||||
| 6 | FAA Form 7460-1 Notice of Proposed Construction or Alt. | N/A | |||||||||||||||||||
| 7 | FAA Response to Form 7460-1 Submission | N/A | |||||||||||||||||||
| 8 | Personnel Background Checks and Base Entry Applications | Submit 14 days before the NTP, and/or before personnel require access to the base | |||||||||||||||||||
| 9 | Entry Authorization List | Contractor must keep up-to-date | |||||||||||||||||||
| 10 | Contractor Vehicle List | Must be kept up-to-date | |||||||||||||||||||
| 11 | Code Review Memo | Submit at least 5 day prior to design | |||||||||||||||||||
| 12 | Daily Reports | Submitted as addendum to Weekly Status Report Message | |||||||||||||||||||
| 13 | Weekly Project Meeting Agenda | At least 1 day prior to meeting | |||||||||||||||||||
| 14 | Weekly Project Meeting Minutes | Within 2 days of meeting, email message with agenda attached is acceptable | |||||||||||||||||||
| 15 | Weekly Status Report Message | Following Tuesday | |||||||||||||||||||
| 16 | Monthly Status Report | 10 day of the following month | |||||||||||||||||||
| 17 | Project Kickoff Meeting Minutes | See SOW | |||||||||||||||||||
| 18 | Site Investigation Memo | See SOW | |||||||||||||||||||
| 19 | Hydrant Flow Testing Records | NA | |||||||||||||||||||
| 20 | Fire Pump Evaluation Records | NA | |||||||||||||||||||
| 21 | Backflow Prevention Device Evaluation Documentation | NA | |||||||||||||||||||
| 22 | Hidden Pipe Location Documenation | See SOW | |||||||||||||||||||
| 23 | Geotechnical Investigation Documentation | See SOW | |||||||||||||||||||
| 24 | Quality Control Plan | See SOW | |||||||||||||||||||
| 25 | Health and Safety Plan | See SOW | |||||||||||||||||||
| 26 | Safety Training Memos | Contractor Must Keep Record | |||||||||||||||||||
| 27 | HAZMAT Manangement Plan | See SOW | |||||||||||||||||||
| 28 | Waste Management Plan | See SOW | |||||||||||||||||||
| 29 | Environmental Protection Plan | See SOW | |||||||||||||||||||
| 30 | Dewatering Plan | NA | |||||||||||||||||||
| 31 | Form 81 Contractor's Hazardous Material Questionaire | See SOW | |||||||||||||||||||
| 32 | Form 82 Short Term Contractor's Hazardous Material Inventory | See SOW | |||||||||||||||||||
| 33 | Form 83 Contractor Environmental Reporting Entry Form | See SOW | |||||||||||||||||||
| 34 | Safety Data Sheets | Required for all chemicals | |||||||||||||||||||
| 35 | HAZMAT or HAZWASTE Disposal Reqest | See SOW | |||||||||||||||||||
| 36 | HAZMAT or HAZWASTE Disposal Report | See SOW | |||||||||||||||||||
| 37 | Construction Work Plan | See SOW | |||||||||||||||||||
| 38 | All Permit Applications | See SOW | |||||||||||||||||||
| 39 | All Permits | See SOW | |||||||||||||||||||
| 40 | Work Clearance Request(s) | See SOW | |||||||||||||||||||
| 41 | Dig Permit(s) | See SOW | |||||||||||||||||||
| 42 | Hot Work and Welding Permit(s) | See SOW | |||||||||||||||||||
| 43 | Utility Outage Request(s) | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 44 | Lift Plan(s) | 10 days in advance | |||||||||||||||||||
| 45 | Crane Usage Notification | 10 days in advance | |||||||||||||||||||
| 46 | Scaffolding Usage Notification | See SOW | |||||||||||||||||||
| 47 | Building Information Modeling (BIM) Tools | NA | |||||||||||||||||||
| 48 | Project Management Tools | Notifies Govt. of computing tools used to accomplish Project Management | |||||||||||||||||||
| 49 | Conferencing Tools | Notifies Govt. of computing tools used to support audiovisuals and communication for meetings | |||||||||||||||||||
| 50 | Designer of Record (DOR) Memo | Identifies DOR & shows his/her qualifications IAW FBPE rules | |||||||||||||||||||
| 51 | Florida Engineering Certificate of Authorization | IAW FBPE rules | |||||||||||||||||||
| 52 | Design Team Qualifications | See SOW | |||||||||||||||||||
| 53 | Documentation of Licensed and Certified Personnel | Submitted for both the design team and for the construction team | |||||||||||||||||||
| 54 | Welder Qualifications | See SOW | |||||||||||||||||||
| 55 | Design Quality Control Plan | See SOW | |||||||||||||||||||
| 56 | Confined Space Entry Permit(s) | NA | |||||||||||||||||||
| 57 | Meeting Agendas | See SOW | |||||||||||||||||||
| 58 | Design Charrette Agenda | See SOW | |||||||||||||||||||
| 59 | Photo Documentation of Project Site | See SOW | |||||||||||||||||||
| 60 | Meeting Recordings | Prior notice to all government employees is required, If recordings, include with minutes | |||||||||||||||||||
| 61 | Site or Event Recordings | Prior notice to all government employees is required, If recordings, include with minutes | |||||||||||||||||||
| 62 | Design Charrette Outbriefing | See SOW, with 35%, or 65% or 95% design | |||||||||||||||||||
| 63 | Design Charrette Minures | See SOW, with 35%, or 65% or 95% design | |||||||||||||||||||
| 64 | Design Charrette Report | Includes conceptual design documents | |||||||||||||||||||
| 65 | File Transfer Notification | Notifies Govt. of computing tools used to accomplish large file transfer | |||||||||||||||||||
| 66 | Project Stakeholder Questionaire | Before initial design | |||||||||||||||||||
| 67 | Fencing and Other Barriers | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 68 | SCIF Trailers | NA | |||||||||||||||||||
| 69 | Construction Trailer | Contractor use | |||||||||||||||||||
| 70 | Administrative Trailers | NA | |||||||||||||||||||
| 72 | Temporary Toilette Facilities | Contractor use | |||||||||||||||||||
| 73 | Hangar Bay Tent | NA | |||||||||||||||||||
| 74 | Incident Notifications | For any reportable incidents, submit to government within 5 of incident (after) | |||||||||||||||||||
| 75 | Incident Reports | For any reportable incidents, submit to government within 5 of incident (after) | |||||||||||||||||||
| 76 | 35% Design Package | See SOW | |||||||||||||||||||
| 77 | 35% BIM | See SOW | |||||||||||||||||||
| 78 | 35% Design Analysis (DA) | See SOW | |||||||||||||||||||
| 79 | 35% Cost Engineering Analysis | See SOW | |||||||||||||||||||
| 80 | 35% Value Engineering Recommendations | See SOW | |||||||||||||||||||
| 81 | 35% Construction Phasing Plan | See SOW | |||||||||||||||||||
| 82 | 35% Testing and Balancing (TAB) Plan | See SOW | |||||||||||||||||||
| 83 | 35% Draft Commissioning Plan | See SOW | |||||||||||||||||||
| 84 | 35% Design Specifications | See SOW | |||||||||||||||||||
| 85 | 35% Design Drawings | See SOW | |||||||||||||||||||
| 86 | 35% Design Submittal Register | See SOW | |||||||||||||||||||
| 87 | 35% Comprehenisve Interior Design (CID) | See SOW | |||||||||||||||||||
| 88 | 35% Structural Interior Design (SID) | See SOW | |||||||||||||||||||
| 89 | 35% Furniture Fixtures and Equipment (FF&E) | See SOW | |||||||||||||||||||
| 90 | 35% Construction Schedule | See SOW | |||||||||||||||||||
| 91 | 35% Training Plan | See SOW | |||||||||||||||||||
| 92 | 35% Design Review Meeting (DRM) Agenda | See SOW | |||||||||||||||||||
| 93 | 35% DRM Draft Minutes | See SOW | |||||||||||||||||||
| 94 | 35% DRM Minutes | See SOW | |||||||||||||||||||
| 95 | 65% Design Package | NA | |||||||||||||||||||
| 96 | 65% BIM | NA | |||||||||||||||||||
| 97 | 65% Design Analysis (DA) | NA | |||||||||||||||||||
| 98 | 65% Cost Engineering Analysis | NA | |||||||||||||||||||
| 99 | 65% Value Engineering Recommendations | NA | |||||||||||||||||||
| 100 | 65% Construction Phasing Plan | NA | |||||||||||||||||||
| 101 | 65% Testing and Balancing (TAB) Plan | NA | |||||||||||||||||||
| 102 | 65% Draft Commissioning Plan | NA | |||||||||||||||||||
| 103 | 65% Design Specifications | NA | |||||||||||||||||||
| 104 | 65% Design Drawings | NA | |||||||||||||||||||
| 105 | 65% Design Submittal Register | NA | |||||||||||||||||||
| 106 | 65% Comprehenisve Interior Design (CID) | NA | |||||||||||||||||||
| 107 | 65% Structural Interior Design (SID) | NA | |||||||||||||||||||
| 108 | 65% Furniture Fixtures and Equipment (FF&E) | NA | |||||||||||||||||||
| 109 | 65% Construction Schedule | NA | |||||||||||||||||||
| 110 | 65% Training Plan | NA | |||||||||||||||||||
| 111 | 65% Design Review Meeting (DRM) Agenda | NA | |||||||||||||||||||
| 112 | 65% DRM Draft Minutes | NA | |||||||||||||||||||
| 113 | 65% DRM Minutes | NA | |||||||||||||||||||
| 114 | 95% Design Package | See SOW | |||||||||||||||||||
| 115 | 95% BIM | See SOW | |||||||||||||||||||
| 116 | 95% Design Analysis (DA) | See SOW | |||||||||||||||||||
| 117 | 95% Cost Engineering Analysis | See SOW | |||||||||||||||||||
| 118 | 95% Value Engineering Recommendations | See SOW | |||||||||||||||||||
| 119 | 95% Construction Phasing Plan | See SOW | |||||||||||||||||||
| 120 | 95% Testing and Balancing (TAB) Plan | See SOW | |||||||||||||||||||
| 121 | 95% Draft Commissioning Plan | See SOW | |||||||||||||||||||
| 122 | 95% Design Specifications | See SOW | |||||||||||||||||||
| 123 | 95% Design Drawings | See SOW | |||||||||||||||||||
| 124 | 95% Design Submittal Register | See SOW | |||||||||||||||||||
| 125 | 95% Comprehenisve Interior Design (CID) | See SOW | |||||||||||||||||||
| 126 | 95% Structural Interior Design (SID) | See SOW | |||||||||||||||||||
| 127 | 95% Furniture Fixtures and Equipment (FF&E) | See SOW | |||||||||||||||||||
| 128 | 95% Construction Schedule | See SOW | |||||||||||||||||||
| 129 | 95% Training Plan | See SOW | |||||||||||||||||||
| 130 | 95% Design Review Meeting (DRM) Agenda | See SOW | |||||||||||||||||||
| 131 | 95% DRM Draft Minutes | See SOW | |||||||||||||||||||
| 132 | 95% DRM Minutes | See SOW | |||||||||||||||||||
| 133 | 100% Design Package | See SOW | |||||||||||||||||||
| 134 | 100% BIM | See SOW | |||||||||||||||||||
| 135 | 100% DA | See SOW | |||||||||||||||||||
| 136 | 100% Cost Engineering Analysis | See SOW | |||||||||||||||||||
| 137 | 100% Value Engineering Recommendations | See SOW | |||||||||||||||||||
| 138 | 100% Construction Phasing Plan | See SOW | |||||||||||||||||||
| 139 | 100% TAB Plan | See SOW | |||||||||||||||||||
| 140 | 100% Commissioning Plan | See SOW | |||||||||||||||||||
| 141 | 100% Design Specifications | See SOW | |||||||||||||||||||
| 142 | 100% Design Drawings | See SOW | |||||||||||||||||||
| 143 | 100% Design Submittal Register | See SOW | |||||||||||||||||||
| 144 | 100% Comprehenisve Interior Design (CID) | See SOW | |||||||||||||||||||
| 145 | 100% Structural Interior Design (SID) | See SOW | |||||||||||||||||||
| 146 | 100% Furniture Fixtures and Equipment (FF&E) | See SOW | |||||||||||||||||||
| 147 | 100% Construction Schedule | See SOW | |||||||||||||||||||
| 148 | 100% Training Plan | See SOW | |||||||||||||||||||
| 149 | 100% Design Review Meeting (DRM) Agenda | See SOW | |||||||||||||||||||
| 150 | 100% DRM Draft Minutes | See SOW | |||||||||||||||||||
| 151 | 100% DRM Minutes | See SOW | |||||||||||||||||||
| 152 | Corrected 100% Design Package | See SOW | |||||||||||||||||||
| 153 | Corrected 100% DRM Agenda | See SOW | |||||||||||||||||||
| 154 | Corrected 100% DRM Minutes | See SOW | |||||||||||||||||||
| 155 | BACnet Testing Laboratory Certification Reports | NA | |||||||||||||||||||
| 156 | BACnet Protocaol Implementation Conformance Statements | NA | |||||||||||||||||||
| 157 | Operator Training Records | See SOW | |||||||||||||||||||
| 158 | Operator Training Reports | See SOW | |||||||||||||||||||
| 159 | Maintainer Training Records | See SOW | |||||||||||||||||||
| 160 | Maintainer Training Reports | See SOW | |||||||||||||||||||
| 161 | Draft DD Form 1354 | See SOW, with NTP | |||||||||||||||||||
| 162 | Final DD Form 1354 | See SOW | |||||||||||||||||||
| 163 | Plumbing Testing Records | See SOW | |||||||||||||||||||
| 164 | Electrical Component and Circuit Test Records | See SOW, with 100% design | |||||||||||||||||||
| 165 | Foundations | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 166 | Fire Panel | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 167 | Fire Detection System Components | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 168 | Proportioning Equipment | NA | |||||||||||||||||||
| 169 | Fire Suppression System Testing Records | See SOW, with 100% design | |||||||||||||||||||
| 170 | Fire Foam Concentrates | NA | |||||||||||||||||||
| 171 | Mass Notification System Testing Records | NA | |||||||||||||||||||
| 172 | Concrete Testing Reports | See SOW, with 100% design | |||||||||||||||||||
| 173 | Inspection Punchlists | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 174 | Inspection Reports | See SOW, with 100% design | |||||||||||||||||||
| 175 | Grounding System Test Reports | See SOW, with 100% design | |||||||||||||||||||
| 176 | Lightning Protection System Certification Reports | See SOW, with 100% design | |||||||||||||||||||
| 177 | Sustainment Management System (SMS) Database | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 178 | Red Line Drawings | Maintain in construction trailer, provide to Govt. upon request | |||||||||||||||||||
| 179 | TAB Report(s) | NA | |||||||||||||||||||
| 180 | Commissioning Report | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 181 | Field Change Documentation | Maintain in construction trailer, provide to Govt. upon request | |||||||||||||||||||
| 182 | DOR Certification Memo | Prior to final design | |||||||||||||||||||
| 183 | As-Built Drawings and Documentation | Digital and hard copy - signed and sealed | |||||||||||||||||||
| 184 | End of Project BIM | See SOW, with 100% design | |||||||||||||||||||
| 185 | Warranty Memos | Final Inspection | |||||||||||||||||||
| 186 | Warranty Documentation | Final Inspection | |||||||||||||||||||
| 187 | Operations and Maintenance (O&M) Documentation and Manuals | Digital and hard copy with discs containing the digital version | |||||||||||||||||||
| 188 | Shop Drawings | Final Inspection | |||||||||||||||||||
| 189 | HVAC Plant Submittal Package | See SOW, with 95% design, or 10 days prior to construction., with 95% design | |||||||||||||||||||
| 190 | HVAC Chemical | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 191 | HVAC Duct Metals | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 192 | HVAC Dampers and Louvers | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 193 | HVAC Duct Insulation and Sealants | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 194 | Air Handling Equipment | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 195 | Variable Air Volume (VAV) Equipment | NA | |||||||||||||||||||
| 196 | Hydronic Piping | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 197 | Hydronic Valves and Components | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 198 | Piping | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 199 | Pipe Marking | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 200 | Expansion Components | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 201 | Pipe Valves | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 202 | Valve Tagging | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 203 | Supervisory Switches | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 204 | Backflow Prevention Components | NA | |||||||||||||||||||
| 205 | Water, Electrical, and Gas Metering Equipment and Devices | NA | |||||||||||||||||||
| 206 | Pumps and Pumping Equipment | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 207 | Pipe Insulation and Cladding | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 208 | Access Panels | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 209 | Variable Frequency Drive (VFD) Equipment | NA | |||||||||||||||||||
| 210 | Pipe Hangars | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 211 | Pipe Sleeves | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 212 | Seismic Support | NA | |||||||||||||||||||
| 213 | Vibration Isolation and Control Components | NA | |||||||||||||||||||
| 214 | Sensors | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 215 | Control System Components | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 216 | Control System Points | NA | |||||||||||||||||||
| 217 | Corrosion Monitoring and Control | NA | |||||||||||||||||||
| 218 | Formwork | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 219 | Concrete Formulation | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 220 | Concrete Reinforcement | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 221 | Concrete Adhesives and Sealants | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 222 | Thermal Insulation | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 223 | Insulating Foams | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 224 | Fire Retardants | NA | |||||||||||||||||||
| 225 | Metals | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 226 | Rubber and Resilient Materials | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 227 | Fasteners | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 228 | Bracing | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 229 | Structural Materials | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 230 | Wall Panels | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 231 | Vapor Barriers | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 232 | Wall Board Materials | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 233 | Wall and Corner Guards | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 234 | Bollards | NA | |||||||||||||||||||
| 235 | Primers, Paints, and Protective Coatings | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 236 | Colors and Finishes | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 237 | Galvanizing | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 238 | Roofing Materials | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 239 | Flashing | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 240 | Gutters and Downspouts | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 241 | Doors & Door Frames | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 242 | Service Doors | NA | |||||||||||||||||||
| 243 | Hangar Doors | NA | |||||||||||||||||||
| 244 | Hangar Door Structure | NA | |||||||||||||||||||
| 245 | Windows & Glazing | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 246 | Flooring | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 247 | Grating | NA | |||||||||||||||||||
| 248 | Locker Room Components | NA | |||||||||||||||||||
| 249 | Bathroom Partitions | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 250 | Sink Fixtures | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 251 | Faucets | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 252 | Urinal Fixtures | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 253 | Toilette Fixtures | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 254 | Flushometer Components | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 255 | Bathroom Equipment | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 256 | Water Coolers | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 257 | Safety and Eye Wash Stations | NA | |||||||||||||||||||
| 258 | Oil Water Separator | NA | |||||||||||||||||||
| 259 | Containment Tank Equipment | NA | |||||||||||||||||||
| 260 | Specialty Equipment | NA | |||||||||||||||||||
| 261 | Trench Drains | NA | |||||||||||||||||||
| 262 | Power Protection Devices | NA | |||||||||||||||||||
| 263 | Transformers | NA | |||||||||||||||||||
| 264 | Switchgear | NA | |||||||||||||||||||
| 265 | Electrical Panels | NA | |||||||||||||||||||
| 266 | Electrical Enclosures | NA | |||||||||||||||||||
| 267 | Electrical Devices | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 268 | Conduit | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 269 | Duct Banks | NA | |||||||||||||||||||
| 270 | Wiring | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 271 | Wire Components | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 272 | Uninterruptible Power Supply (UPS) Components | NA | |||||||||||||||||||
| 273 | Transfer Switches | NA | |||||||||||||||||||
| 274 | Generators | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 275 | Signage and Labeling | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 276 | Lighting Fixtures | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 277 | Lighting Controls | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 278 | Pavements | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 279 | Pavement Marking | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 280 | Communications Equipment, Components, and Devices | See SOW, with 95% design, or 10 days prior to construction. | |||||||||||||||||||
| 281 | Spare Parts and Bench Stock | NA | |||||||||||||||||||
| 236 | |||||||||||||||||||||
| 237 | |||||||||||||||||||||
| 238 | |||||||||||||||||||||
| 239 | |||||||||||||||||||||
| 240 | |||||||||||||||||||||
| 241 | |||||||||||||||||||||
| 242 | |||||||||||||||||||||
| 243 | |||||||||||||||||||||
| 244 | |||||||||||||||||||||
| 245 | |||||||||||||||||||||
| 246 | |||||||||||||||||||||
| 247 | |||||||||||||||||||||
| 248 | |||||||||||||||||||||
| 249 | |||||||||||||||||||||
| 250 | |||||||||||||||||||||
| 251 | |||||||||||||||||||||
| 252 | |||||||||||||||||||||
| 253 | |||||||||||||||||||||
| 254 | |||||||||||||||||||||
| 255 | |||||||||||||||||||||
| 256 | |||||||||||||||||||||
| 257 | |||||||||||||||||||||
| 258 | |||||||||||||||||||||
| 259 | |||||||||||||||||||||
| 260 | |||||||||||||||||||||
| 261 | |||||||||||||||||||||
| 262 | |||||||||||||||||||||
| 263 | |||||||||||||||||||||
| 264 | |||||||||||||||||||||
| 265 | |||||||||||||||||||||
| 266 | |||||||||||||||||||||
| 267 | |||||||||||||||||||||
| 268 | |||||||||||||||||||||
| 269 | |||||||||||||||||||||
| 270 | |||||||||||||||||||||
| 271 | |||||||||||||||||||||
| 272 | |||||||||||||||||||||
| 273 | |||||||||||||||||||||
| 274 | |||||||||||||||||||||
| 275 |
AF Form 66 (Computer Generated) Page &P of &N
File details come from the government source that posted it.