Attachment_05_-_AF_Form_66.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Repair Multiple 6000 Area Facilities Federal contract opportunity
Solicitation number
FA4819-19-R-A024
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 05 - AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Repair Multiple 6000 Area Facilities, newest first.
File Type Posted
QA's_-_6000_Area.xlsx XLSX spreadsheet
APPENDIX_A_6000_Area_Facilities_Multi_XLWU198140_Rev5.docx DOCX document
QA's_-_6000_Area.xlsx XLSX spreadsheet
Solicitation_Amendment_FA481919RA0240002_SF_30.pdf PDF
APPENDIX_A_6000_Area_Facilities_Revised_9-3-19.pdf PDF
QA's_-_6000_Area.xlsx XLSX spreadsheet
Site_Visit_Sign_In_Sheet.pdf PDF
Amendment_0001_-_SF_30.pdf PDF
Attachment_04_-_Wage_Determination_4_Jan_2019.pdf PDF
Attachment_11_-_Insurance_Requirements.pdf PDF
Attachment_01_-_Statement_of_Work_6_Aug_2019.pdf PDF
Attachment_03_-_Appendix_B_Photos_20_May_2019.pdf PDF
Attachment_02_-_Appendix_A_Scope_of_Work_6_Aug_2019.pdf PDF
Attachment_06_-_AF_Form_3000.pdf PDF
Attachment_09_General_Financial_Information.pdf PDF
Attachment_10_-_Sample_RFI.PDF PDF
Attachment_08_-_AF3065.pdf PDF
Solicitation_-_FA481919RA024.pdf PDF
Attachment_07_-_AF_3064.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 SCHEDULE OF MATERIAL SUBMITTALS Project No. XLWU 19-8140 Repair 6000 Area Facilities: B6011, B6017, B6021, B6025, B6026, B6027, B6031, B6070, B6072, 26055, B6051, B6053, B6054, B6055, B6056, and B6085

Solicitation/Contract Number

FA4890-XX-X-XXXX-XXXX

TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST REPORTSOTHER
APPROVEDDISAPPROVED
COMPLETED TABLE TO BE PROVIDED WITH FULLY EDITED SPECIFICATIONS AT 95% DESIGN SUBMITTAL
DIGITAL SUBMISSIONS WHEREVER POSSIBLE UNLESS OTHERWISED DIRECTED - SUBMITTALS TO BE ACCOMPANIED BY AF FORM 3000
1Master Document ListSee SOW
2Requests for Information (RFI)Includes any attachments
3RFI Tabular ReportContractor to keep record
4RFI Tracking SheetContractor to keep track of serialized RFI submissions and reponses
5Integrated Master ScheduleSee SOW
6FAA Form 7460-1 Notice of Proposed Construction or Alt.N/A
7FAA Response to Form 7460-1 SubmissionN/A
8Personnel Background Checks and Base Entry ApplicationsSubmit 14 days before the NTP, and/or before personnel require access to the base
9Entry Authorization ListContractor must keep up-to-date
10Contractor Vehicle ListMust be kept up-to-date
11Code Review MemoSubmit at least 5 day prior to design
12Daily ReportsSubmitted as addendum to Weekly Status Report Message
13Weekly Project Meeting AgendaAt least 1 day prior to meeting
14Weekly Project Meeting MinutesWithin 2 days of meeting, email message with agenda attached is acceptable
15Weekly Status Report MessageFollowing Tuesday
16Monthly Status Report10 day of the following month
17Project Kickoff Meeting MinutesSee SOW
18Site Investigation MemoSee SOW
19Hydrant Flow Testing RecordsNA
20Fire Pump Evaluation RecordsNA
21Backflow Prevention Device Evaluation DocumentationNA
22Hidden Pipe Location DocumenationSee SOW
23Geotechnical Investigation DocumentationSee SOW
24Quality Control PlanSee SOW
25Health and Safety PlanSee SOW
26Safety Training MemosContractor Must Keep Record
27HAZMAT Manangement PlanSee SOW
28Waste Management PlanSee SOW
29Environmental Protection PlanSee SOW
30Dewatering PlanNA
31Form 81 Contractor's Hazardous Material QuestionaireSee SOW
32Form 82 Short Term Contractor's Hazardous Material InventorySee SOW
33Form 83 Contractor Environmental Reporting Entry FormSee SOW
34Safety Data SheetsRequired for all chemicals
35HAZMAT or HAZWASTE Disposal ReqestSee SOW
36HAZMAT or HAZWASTE Disposal ReportSee SOW
37Construction Work PlanSee SOW
38All Permit ApplicationsSee SOW
39All PermitsSee SOW
40Work Clearance Request(s)See SOW
41Dig Permit(s)See SOW
42Hot Work and Welding Permit(s)See SOW
43Utility Outage Request(s)See SOW, with 95% design, or 10 days prior to construction.
44Lift Plan(s)10 days in advance
45Crane Usage Notification10 days in advance
46Scaffolding Usage NotificationSee SOW
47Building Information Modeling (BIM) ToolsNA
48Project Management ToolsNotifies Govt. of computing tools used to accomplish Project Management
49Conferencing ToolsNotifies Govt. of computing tools used to support audiovisuals and communication for meetings
50Designer of Record (DOR) MemoIdentifies DOR & shows his/her qualifications IAW FBPE rules
51Florida Engineering Certificate of AuthorizationIAW FBPE rules
52Design Team QualificationsSee SOW
53Documentation of Licensed and Certified PersonnelSubmitted for both the design team and for the construction team
54Welder QualificationsSee SOW
55Design Quality Control PlanSee SOW
56Confined Space Entry Permit(s)NA
57Meeting AgendasSee SOW
58Design Charrette AgendaSee SOW
59Photo Documentation of Project SiteSee SOW
60Meeting RecordingsPrior notice to all government employees is required, If recordings, include with minutes
61Site or Event RecordingsPrior notice to all government employees is required, If recordings, include with minutes
62Design Charrette OutbriefingSee SOW, with 35%, or 65% or 95% design
63Design Charrette MinuresSee SOW, with 35%, or 65% or 95% design
64Design Charrette ReportIncludes conceptual design documents
65File Transfer NotificationNotifies Govt. of computing tools used to accomplish large file transfer
66Project Stakeholder QuestionaireBefore initial design
67Fencing and Other BarriersSee SOW, with 95% design, or 10 days prior to construction.
68SCIF TrailersNA
69Construction TrailerContractor use
70Administrative TrailersNA
72Temporary Toilette FacilitiesContractor use
73Hangar Bay TentNA
74Incident NotificationsFor any reportable incidents, submit to government within 5 of incident (after)
75Incident ReportsFor any reportable incidents, submit to government within 5 of incident (after)
7635% Design PackageSee SOW
7735% BIMSee SOW
7835% Design Analysis (DA)See SOW
7935% Cost Engineering AnalysisSee SOW
8035% Value Engineering RecommendationsSee SOW
8135% Construction Phasing PlanSee SOW
8235% Testing and Balancing (TAB) PlanSee SOW
8335% Draft Commissioning PlanSee SOW
8435% Design SpecificationsSee SOW
8535% Design DrawingsSee SOW
8635% Design Submittal RegisterSee SOW
8735% Comprehenisve Interior Design (CID)See SOW
8835% Structural Interior Design (SID)See SOW
8935% Furniture Fixtures and Equipment (FF&E)See SOW
9035% Construction ScheduleSee SOW
9135% Training PlanSee SOW
9235% Design Review Meeting (DRM) AgendaSee SOW
9335% DRM Draft MinutesSee SOW
9435% DRM MinutesSee SOW
9565% Design PackageNA
9665% BIMNA
9765% Design Analysis (DA)NA
9865% Cost Engineering AnalysisNA
9965% Value Engineering RecommendationsNA
10065% Construction Phasing PlanNA
10165% Testing and Balancing (TAB) PlanNA
10265% Draft Commissioning PlanNA
10365% Design SpecificationsNA
10465% Design DrawingsNA
10565% Design Submittal RegisterNA
10665% Comprehenisve Interior Design (CID)NA
10765% Structural Interior Design (SID)NA
10865% Furniture Fixtures and Equipment (FF&E)NA
10965% Construction ScheduleNA
11065% Training PlanNA
11165% Design Review Meeting (DRM) AgendaNA
11265% DRM Draft MinutesNA
11365% DRM MinutesNA
11495% Design PackageSee SOW
11595% BIMSee SOW
11695% Design Analysis (DA)See SOW
11795% Cost Engineering AnalysisSee SOW
11895% Value Engineering RecommendationsSee SOW
11995% Construction Phasing PlanSee SOW
12095% Testing and Balancing (TAB) PlanSee SOW
12195% Draft Commissioning PlanSee SOW
12295% Design SpecificationsSee SOW
12395% Design DrawingsSee SOW
12495% Design Submittal RegisterSee SOW
12595% Comprehenisve Interior Design (CID)See SOW
12695% Structural Interior Design (SID)See SOW
12795% Furniture Fixtures and Equipment (FF&E)See SOW
12895% Construction ScheduleSee SOW
12995% Training PlanSee SOW
13095% Design Review Meeting (DRM) AgendaSee SOW
13195% DRM Draft MinutesSee SOW
13295% DRM MinutesSee SOW
133100% Design PackageSee SOW
134100% BIMSee SOW
135100% DASee SOW
136100% Cost Engineering AnalysisSee SOW
137100% Value Engineering RecommendationsSee SOW
138100% Construction Phasing PlanSee SOW
139100% TAB PlanSee SOW
140100% Commissioning PlanSee SOW
141100% Design SpecificationsSee SOW
142100% Design DrawingsSee SOW
143100% Design Submittal RegisterSee SOW
144100% Comprehenisve Interior Design (CID)See SOW
145100% Structural Interior Design (SID)See SOW
146100% Furniture Fixtures and Equipment (FF&E)See SOW
147100% Construction ScheduleSee SOW
148100% Training PlanSee SOW
149100% Design Review Meeting (DRM) AgendaSee SOW
150100% DRM Draft MinutesSee SOW
151100% DRM MinutesSee SOW
152Corrected 100% Design PackageSee SOW
153Corrected 100% DRM AgendaSee SOW
154Corrected 100% DRM MinutesSee SOW
155BACnet Testing Laboratory Certification ReportsNA
156BACnet Protocaol Implementation Conformance StatementsNA
157Operator Training RecordsSee SOW
158Operator Training ReportsSee SOW
159Maintainer Training RecordsSee SOW
160Maintainer Training ReportsSee SOW
161Draft DD Form 1354See SOW, with NTP
162Final DD Form 1354See SOW
163Plumbing Testing RecordsSee SOW
164Electrical Component and Circuit Test RecordsSee SOW, with 100% design
165FoundationsSee SOW, with 95% design, or 10 days prior to construction.
166Fire PanelSee SOW, with 95% design, or 10 days prior to construction.
167Fire Detection System ComponentsSee SOW, with 95% design, or 10 days prior to construction.
168Proportioning EquipmentNA
169Fire Suppression System Testing RecordsSee SOW, with 100% design
170Fire Foam ConcentratesNA
171Mass Notification System Testing RecordsNA
172Concrete Testing ReportsSee SOW, with 100% design
173Inspection PunchlistsSee SOW, with 95% design, or 10 days prior to construction.
174Inspection ReportsSee SOW, with 100% design
175Grounding System Test ReportsSee SOW, with 100% design
176Lightning Protection System Certification ReportsSee SOW, with 100% design
177Sustainment Management System (SMS) DatabaseSee SOW, with 95% design, or 10 days prior to construction.
178Red Line DrawingsMaintain in construction trailer, provide to Govt. upon request
179TAB Report(s)NA
180Commissioning ReportSee SOW, with 95% design, or 10 days prior to construction.
181Field Change DocumentationMaintain in construction trailer, provide to Govt. upon request
182DOR Certification MemoPrior to final design
183As-Built Drawings and DocumentationDigital and hard copy - signed and sealed
184End of Project BIMSee SOW, with 100% design
185Warranty MemosFinal Inspection
186Warranty DocumentationFinal Inspection
187Operations and Maintenance (O&M) Documentation and ManualsDigital and hard copy with discs containing the digital version
188Shop DrawingsFinal Inspection
189HVAC Plant Submittal PackageSee SOW, with 95% design, or 10 days prior to construction., with 95% design
190HVAC ChemicalSee SOW, with 95% design, or 10 days prior to construction.
191HVAC Duct MetalsSee SOW, with 95% design, or 10 days prior to construction.
192HVAC Dampers and LouversSee SOW, with 95% design, or 10 days prior to construction.
193HVAC Duct Insulation and SealantsSee SOW, with 95% design, or 10 days prior to construction.
194Air Handling EquipmentSee SOW, with 95% design, or 10 days prior to construction.
195Variable Air Volume (VAV) EquipmentNA
196Hydronic PipingSee SOW, with 95% design, or 10 days prior to construction.
197Hydronic Valves and ComponentsSee SOW, with 95% design, or 10 days prior to construction.
198PipingSee SOW, with 95% design, or 10 days prior to construction.
199Pipe MarkingSee SOW, with 95% design, or 10 days prior to construction.
200Expansion ComponentsSee SOW, with 95% design, or 10 days prior to construction.
201Pipe ValvesSee SOW, with 95% design, or 10 days prior to construction.
202Valve TaggingSee SOW, with 95% design, or 10 days prior to construction.
203Supervisory SwitchesSee SOW, with 95% design, or 10 days prior to construction.
204Backflow Prevention ComponentsNA
205Water, Electrical, and Gas Metering Equipment and DevicesNA
206Pumps and Pumping EquipmentSee SOW, with 95% design, or 10 days prior to construction.
207Pipe Insulation and CladdingSee SOW, with 95% design, or 10 days prior to construction.
208Access PanelsSee SOW, with 95% design, or 10 days prior to construction.
209Variable Frequency Drive (VFD) EquipmentNA
210Pipe HangarsSee SOW, with 95% design, or 10 days prior to construction.
211Pipe SleevesSee SOW, with 95% design, or 10 days prior to construction.
212Seismic SupportNA
213Vibration Isolation and Control ComponentsNA
214SensorsSee SOW, with 95% design, or 10 days prior to construction.
215Control System ComponentsSee SOW, with 95% design, or 10 days prior to construction.
216Control System PointsNA
217Corrosion Monitoring and ControlNA
218FormworkSee SOW, with 95% design, or 10 days prior to construction.
219Concrete FormulationSee SOW, with 95% design, or 10 days prior to construction.
220Concrete ReinforcementSee SOW, with 95% design, or 10 days prior to construction.
221Concrete Adhesives and SealantsSee SOW, with 95% design, or 10 days prior to construction.
222Thermal InsulationSee SOW, with 95% design, or 10 days prior to construction.
223Insulating FoamsSee SOW, with 95% design, or 10 days prior to construction.
224Fire RetardantsNA
225MetalsSee SOW, with 95% design, or 10 days prior to construction.
226Rubber and Resilient MaterialsSee SOW, with 95% design, or 10 days prior to construction.
227FastenersSee SOW, with 95% design, or 10 days prior to construction.
228BracingSee SOW, with 95% design, or 10 days prior to construction.
229Structural MaterialsSee SOW, with 95% design, or 10 days prior to construction.
230Wall PanelsSee SOW, with 95% design, or 10 days prior to construction.
231Vapor BarriersSee SOW, with 95% design, or 10 days prior to construction.
232Wall Board MaterialsSee SOW, with 95% design, or 10 days prior to construction.
233Wall and Corner GuardsSee SOW, with 95% design, or 10 days prior to construction.
234BollardsNA
235Primers, Paints, and Protective CoatingsSee SOW, with 95% design, or 10 days prior to construction.
236Colors and FinishesSee SOW, with 95% design, or 10 days prior to construction.
237GalvanizingSee SOW, with 95% design, or 10 days prior to construction.
238Roofing MaterialsSee SOW, with 95% design, or 10 days prior to construction.
239FlashingSee SOW, with 95% design, or 10 days prior to construction.
240Gutters and DownspoutsSee SOW, with 95% design, or 10 days prior to construction.
241Doors & Door FramesSee SOW, with 95% design, or 10 days prior to construction.
242Service DoorsNA
243Hangar DoorsNA
244Hangar Door StructureNA
245Windows & GlazingSee SOW, with 95% design, or 10 days prior to construction.
246FlooringSee SOW, with 95% design, or 10 days prior to construction.
247GratingNA
248Locker Room ComponentsNA
249Bathroom PartitionsSee SOW, with 95% design, or 10 days prior to construction.
250Sink FixturesSee SOW, with 95% design, or 10 days prior to construction.
251FaucetsSee SOW, with 95% design, or 10 days prior to construction.
252Urinal FixturesSee SOW, with 95% design, or 10 days prior to construction.
253Toilette FixturesSee SOW, with 95% design, or 10 days prior to construction.
254Flushometer ComponentsSee SOW, with 95% design, or 10 days prior to construction.
255Bathroom EquipmentSee SOW, with 95% design, or 10 days prior to construction.
256Water CoolersSee SOW, with 95% design, or 10 days prior to construction.
257Safety and Eye Wash StationsNA
258Oil Water SeparatorNA
259Containment Tank EquipmentNA
260Specialty EquipmentNA
261Trench DrainsNA
262Power Protection DevicesNA
263TransformersNA
264SwitchgearNA
265Electrical PanelsNA
266Electrical EnclosuresNA
267Electrical DevicesSee SOW, with 95% design, or 10 days prior to construction.
268ConduitSee SOW, with 95% design, or 10 days prior to construction.
269Duct BanksNA
270WiringSee SOW, with 95% design, or 10 days prior to construction.
271Wire ComponentsSee SOW, with 95% design, or 10 days prior to construction.
272Uninterruptible Power Supply (UPS) ComponentsNA
273Transfer SwitchesNA
274GeneratorsSee SOW, with 95% design, or 10 days prior to construction.
275Signage and LabelingSee SOW, with 95% design, or 10 days prior to construction.
276Lighting FixturesSee SOW, with 95% design, or 10 days prior to construction.
277Lighting ControlsSee SOW, with 95% design, or 10 days prior to construction.
278PavementsSee SOW, with 95% design, or 10 days prior to construction.
279Pavement MarkingSee SOW, with 95% design, or 10 days prior to construction.
280Communications Equipment, Components, and DevicesSee SOW, with 95% design, or 10 days prior to construction.
281Spare Parts and Bench StockNA
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275

AF Form 66 (Computer Generated) Page &P of &N

File details come from the government source that posted it.