Revised Appendix A

View the file

Other files for this federal contract opportunity

Other files attached to Repair Multiple 6000 Area Facilities, newest first.
File Type Posted
QA's_-_6000_Area.xlsx XLSX spreadsheet
APPENDIX_A_6000_Area_Facilities_Multi_XLWU198140_Rev5.docx DOCX document
QA's_-_6000_Area.xlsx XLSX spreadsheet
Solicitation_Amendment_FA481919RA0240002_SF_30.pdf PDF
QA's_-_6000_Area.xlsx XLSX spreadsheet
Site_Visit_Sign_In_Sheet.pdf PDF
Amendment_0001_-_SF_30.pdf PDF
Attachment_04_-_Wage_Determination_4_Jan_2019.pdf PDF
Attachment_11_-_Insurance_Requirements.pdf PDF
Attachment_01_-_Statement_of_Work_6_Aug_2019.pdf PDF
Attachment_03_-_Appendix_B_Photos_20_May_2019.pdf PDF
Attachment_02_-_Appendix_A_Scope_of_Work_6_Aug_2019.pdf PDF
Attachment_06_-_AF_Form_3000.pdf PDF
Attachment_09_General_Financial_Information.pdf PDF
Attachment_10_-_Sample_RFI.PDF PDF
Attachment_08_-_AF3065.pdf PDF
Solicitation_-_FA481919RA024.pdf PDF
Attachment_05_-_AF_Form_66.xlsx XLSX spreadsheet
Attachment_07_-_AF_3064.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4819-19-R-7005

Appendix – A

3 September 2019

APPENDIX – A

SCOPE OF WORK

Request For Proposal

Repair 6000 Area Facilities Multi 6011, 6017, 6021, 6025, 6027, 6031, 6070, 6072, 26055, 6051, 6053, 6054, 6055, 6056, 6085

TYNDALL AFB FLORIDA

FOR PROJECT XLWU 19-8140

3 September 2019

TABLE OF CONTENTS

1.0 SCOPE 3

1.1 PURPOSE 3

1.2 FIELD CHANGES: 3

2.0 SUMMARY OF WORK FOR AREA 6000 4

2.1 TASK 1.0 4

A. B6011 – HAZMAT Storage Facility 4 B. B6017 – Vehicle Wash Facility 8 C. B6021 – JJ Office Facility 10 D. B6025 – Storage Facility XLWU 19-8140E 13 E. B6027 – Sign Shop Facility 16 F. B6031 – Cardboard and Open Storage Facility XLWU 19-8140F 19 G. B6070 – JBECC Facility XLWU 19-8140K 22 H. B6072 – Storage Facility XLWU 19-8140L 27

2.2 TASK 2.0 30

A. 26055 – Boat Storage 30

B. B6051 – FUELS PIER 6000 AREA 33

C. B6053 – LRS and DLA Storage 35 D. B6054 – LRS Fuels and Admin Storage 38 E. B6055 – LRS Fuels and Admin Storage 40 F. B6056 – Fuels and Admin 43 G. B6085 – BOOM Equipment Storage Facility 46

3.0 POINTS OF CONTACT (POCS) 49

3.1 POCS WILL BE COORDINATED THROUGH THE CO. 49

3.2 CONTRACTING OFFICER AUTHORITY: 49

3.3 PROJECT MANAGER (PM): 49

3.4 USER CONTACT 49

3.5 BUILDING CONTACT 49

3 September 2019

1.0 SCOPE

1.1 PURPOSE

The purpose of the Tyndall Air Force Base (TAFB) project XLWU 19-8140, Repair 6000 Area Facilities Multi 6011, 6017, 6021, 6025, 6027, 6031, 6070, 26055, 6051, 6053, 6054, 6055, 6056, 6085 is to repair hurricane damage and to bring the building and its supporting facilities into full compliance with current building codes, including the DoD Building Code, and the portion of the Florida Building Code that contains the High Velocity Hurricane Zone (HVHZ) provisions. (TAFB will be treated as a Wind Zone 4 located site in accordance with UFC-3-301-01). This task order delivery method is Design-Build (D-B). Work on supporting facilities includes external building fixtures, building utilities within the Points of Demarcation (POD) for privatized utilities, and work within the Administration / Office Building. The Contractor shall be responsible for providing all labor, equipment, tools, materials, and services necessary to complete the project within the allotted timeframe.

A. This project has an estimated period of performance from Notification to Proceed

(NTP) through completion and turnover of the facility back to the Government for mission operations of 280 calendar days.

1.2 FIELD CHANGES:

A. Field Changes: The Contractor and the Government may agree to perform a no cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated items. All field changes must be approved by the CO prior to execution. Only the CO may authorize field changes or deviations from the SOW.

3 September 2019

2.0 SUMMARY OF WORK FOR AREA 6000

2.1 TASK 1.0

A. B6011 – HAZMAT Storage Facility

a. Building 6011 is a post HAZMAT Storage Facility. It is a slab on grade pre-engineered metal building with a gable roof design that sheds water from the East and West ends of the building. It is comprised of steel metal frame members with sheet metal covering the exterior walls. This building is a one story facility with two roll up doors, one at the front and one at the rear of the building.

b. This building is approximately 7,100 square feet.

c. The building has no HVAC system. It contains an electrical system for lighting purposes and a plumbing system for utilities purposes.

1. Specific Work and Utilities

1.1 Surveys for asbestos, mold and lead paint should be conducted prior demolition or rehabilitation.

1.2 Key will be required to enter mechanical Room

2. Architectural

2.1 Exterior Walls

2.1.1 Repair Exterior Walls West and North Sides

2.1.1.1 Demo Exterior Sheet Metal Panels ~ 2000 sf

2.1.1.2 Demo or Repair Wall Support Beams (4+) ~ 100 feet

2.1.1.3 Repair Wall Support Beams (1+) 20 feet, Welds or bolts torn loose

2.1.1.4 Install Wall Support Beams ~ 400 lf

2.1.1.5 Install Sheet Metal Panels ~2000 sf

2.1.1.6 Caulk Exterior Walls ~ 100 sf

2.1.2 Paint Exterior Surfaces

2.2 Roof (Refer to section 1.0.A.a.) Hurricane Level 4

2.2.1 Cover equipment below

2.2.2 Demo damaged ridge cap or vents 80 lf

2.2.3 Demo damaged Sheet Metal Roof ~ 1200 sf

3 September 2019

2.2.4 Replace damaged Insulation ~ 1200 sf

2.2.5 Demo damaged downspouts, gutters, and soffit ~ 250 lf

2.2.6 Install portions of Sheet metal Roof ~ 1200 sf

2.2.7 Install roof ridge cap or vents ~ 80 lf

2.2.8 Replace Fascia ~ 200 lf

2.2.9 Replace Gutter ~ 200 lf

2.2.10 Replace drip edge and downspouts ~ 150 lf

2.3 Exterior Doors

2.3.1 Exterior Doors – Entry 3070 (1)

2.3.1.1 Demo damaged exterior door single

2.3.1.2 Install Door Insulated

2.3.1.3 Install Panic Hardware.

2.3.2 Exterior Doors – Rollup 12 by 14 foot (1)

2.3.2.1 Demo exterior door trim

2.3.2.2 Install new door trim

2.4 Windows - No Work Required - Not Included in this Project

2.5 Interior

2.5.1 Walls

2.5.1.1 Gypsum Walls and Insulation ~ 2500 sf

2.1.1.1.1 Demo Drywall

2.1.1.1.2 Mold Remediate Office

2.1.1.1.3 Mold Remediate Bathroom

2.1.1.1.4 Install Wall Insulation

2.1.1.1.5 Install Gypsum Walls

2.1.1.1.6 Paint Interior Walls

2.5.2 Ceiling ~ 700 sf

2.5.2.1 Demo Ceiling Tiles, Track and Insulation

2.5.2.2 Install Ceiling Tiles, Track and Insulation

2.5.3 Fixtures - No Work Required - Not Included in this Project

3 September 2019

3. Electrical

3.1 Lighting

3.1.1 Exterior Lighting (4)

3.1.1.1 Demo wall-mounted exterior lights

3.1.1.2 Replace wall-mounted exterior lights with LED

lighting.

3.1.2 Interior Lighting (12)

3.1.2.1 Demo damaged Fluorescent Light components as

needed 2' x 4' T8

3.1.2.2 Demo damaged Fluorescent Light components with

battery backup as needed 2' x 4' T8

3.1.2.3 Replace damaged Fluorescent Light with LEDs 2' x 4'

3.1.2.4 Replace damaged Fluorescent Light with LEDs 2' x 4'

with battery backup

3.1.2.5 Install Exit signs

3.2 Outlets (2)

3.2.1 Repair or replace electrical distribution Panel

3.2.2 Demo light switches as needed.

3.2.3 Demo 110V Outlets as needed.

3.2.4 Install 110V Outlets as needed.

3.2.5 Install light switches as needed.

3.3 Conduits ~ 200 lf

3.3.1 Demo outlets, switches and Ceiling Conduits.

3.3.2 Install outlets, switches and Ceiling Conduits.

3.4 Generator - No Work Required - Not Included in this Project

3.5 UPS - No Work Required - Not Included in this Project

3.6 Security - No Work Required - Not Included in this Project

3.7 Lightning Protection System (LPS) ~ 7020 sf

3.7.1 Repair existing LPS if installed

3.7.2 Install LPS if not installed.

3.7.3 3rd Party Certification of LPS

3 September 2019

3.8 Communication (1)

3.8.1 Replace Monaco Fire Notifier antenna as required.

3.9 HVAC (1)

3.9.1 Replace wall mounted AC Unit for Office as needed

3.9.2 Install Bathroom exhaust fan

3.9.3 HVAC duct cleaning as needed

3.10 Fire Protection System - No Work Required - Not Included in this Project

4. Mechanical - No Work Required - Not Included in this Project

3 September 2019

B. B6017 – Vehicle Wash Facility

a. Building 6017 is a slab on grade, one story, wood framed structure. The roof is constructed from wood trusses, wood decking and shingles. The roof has a gable with no visible signs of gutters and downspouts.

b. The building is ~ 300 sf.

demolition or rehabilitation

2.1 Exterior Walls ~ 700 sf

2.1.1 Repair CMU walls ~ 200 sf

2.1.2 Caulk Exterior Wall ~ 20 sf

2.1.3 Paint Exterior Surfaces ~ 700 sf

2.2 Roof (Refer to section 1.0.A.a.) Hurricane Level 4 ~ 300 sf. Roof completely missing.

2.2.1 Install framework for roof ~ 300 sf

2.2.2 Install portions of Sheet metal Roof ~ 300 sf

2.2.3 Install roof ridge cap or vents ~ 15 lf

2.2.4 Replace Soffit ~ 30 lf

2.2.5 Replace Fascia ~ 30 lf

2.2.6 Replace Gutter ~ 30 lf

2.2.7 Replace drip edge and downspouts ~ 40 lf

2.2 Exterior Doors

2.2.1 Exterior Doors – Entry - No Work Required - Not Included in this

Project

2.3 Windows - No Work Required - Not Included in this Project

3 September 2019

2.4 Interior

2.4.1 Walls - No Work Required - Not Included in this Project

2.4.1.1 Clean Interior Wall ~ 700 sf

2.4.1.2 Paint Exterior Surfaces ~ 700 sf

2.4.2 Ceiling - No Work Required - Not Included in this Project

2.4.3 Fixtures - No Work Required - Not Included in this Project

3.1.1 Exterior Lighting - No Work Required - Not Included in this Project

3.1.2 Interior Lighting (2) One each bay

3.1.2.1 Install Fluorescent Light with LEDs 2' x 4'

3.2 Outlets - No Work Required - Not Included in this Project

3.3 Conduits - No Work Required - Not Included in this Project

3.7 Lightning Protection System (LPS) - No Work Required - Not Included in this Project.

3.8 Communication - No Work Required - Not Included in this Project

3.9 HVAC - No Work Required - Not Included in this Project

3 September 2019

C. B6021 – JJ Office Facility

a. Building 6021 is a slab on grade, one story, wood framed structure. The roof is constructed from wood trusses, wood decking and shingles. The roof has a gable with no visible signs of gutters and downspouts.

b. The building is ~ 3350 sf.

c. The interior construction is all drywall on the walls and ceilings with a carpet / vinyl floor finish. The interior spaces are comprised of a general office area, storage rooms, toilet area and mechanical / electrical spaces.

2.1.1 Demo Wall Panels ~ 450 sf

2.1.2 Plum wall panel ~ 8 lf

2.1.3 Install vinyl or metal siding to match existing siding ~ 1600 sf

2.1.4 Caulk Exterior Wall ~ 200 sf

2.1.5 Paint Exterior Surfaces ~ 200 sf

2.2 Roof

2.2.1 Replace Soffit ~ 270 lf

2.2.2 Replace Fascia ~ 270 lf

2.2.3 Replace Gutter ~ 270 lf

2.2.4 Replace drip edge and downspouts ~ 150 lf

2.3.1 Exterior Doors – Entry - No Work Required - Not Included in this

2.4 Windows (10)

2.4.1 Demo damaged exterior windows ~ 36 by 36

2.4.2 Replace damaged windows

3 September 2019

2.5 Interior

2.5.1 Walls - No Work Required - Not Included in this Project

2.5.2 Ceiling ~ 2500 sf

2.5.2.1 Demo damaged Ceiling Tiles, Track and Insulation

2.5.2.2 Replace Insulation

2.5.2.3 Install Ceiling Tiles, Track and Insulation

3.1.3 Exterior Lighting - No Work Required - Not Included in this Project

3.1.4 Interior Lighting (5)

3.1.4.1 Demo damaged Fluorescent Light components as

needed 2' x 4' T8 (4)

3.1.4.2 Demo damaged Fluorescent Light components with

battery backup as needed 2' x 4' T8 (1)

3.1.4.3 Replace damaged Fluorescent Light with LEDs 2' x 4'

(4)

3.1.4.4 Replace damaged Fluorescent Light with LEDs 2' x 4'

with battery backup (1)

3.1.4.5 Install Exit signs (1)

3.2 Outlets (1)

3.2.1 Exterior Outlets

3.2.1.1 Demo 110V Outlets as needed.

3.2.1.2 Install 110V Outlets as needed.

3.3 Conduits (10 lf)

3.3.1 Demo outlets, switches and Ceiling Conduits.

3.3.2 Install outlets, switches and Ceiling Conduits.

3 September 2019 this Project.

3.9 HVAC (1) 2 Ton Slit Unit

3.9.1 Replace 2 Ton AC Unit as needed

3.9.2 HVAC duct cleaning as needed ~ 400 lf

3.9.3 Certification of HVAC and AHU, and Test/Balance

3 September 2019

D. B6025 – Storage Facility XLWU 19-8140E

a. Building 6025 is a post storage facility. It is a slab on grade pre-engineered metal building with a gable roof design that sheds water from the East and West ends of the building. It is comprised of steel metal frame members with sheet metal covering the exterior walls. This building is a one story facility with a roll up door at the front and two single doors to the rear and side of the

b. This building is approximately 2,700 square feet with no HVAC system. It contains some electrical system for lighting purposes and a single water fountain station to the west side of the building.

1.1 Inspect Electrical Feed to the building

2.1.1 Repair Exterior Walls

2.1.1.1 Demo Exterior Sheet Metal Panels ~ 300 sf

2.1.1.2 Install Sheet Metal Panels ~300 sf

2.1.1.3 Caulk Exterior Walls 30 sf

2.1.2 Paint Exterior Surfaces ~ 30 sf

2.2.2 Demo damaged metal roof ~ 120 sf

2.2.3 Install Sheet metal Roof ~ 120 sf

2.2.4 Install roof ridge cap or vents as needed ~ 43 lf

2.2.5 Replace damaged Fascia as needed ~ 120 lf

2.2.6 Install Gutter ~ 120 lf

2.2.7 Install drip edge and downspouts ~ 120 lf

3 September 2019

2.3 Exterior Doors

2.3.2 Exterior Doors – Rollup (1)

2.3.2.1 Demo damaged exterior rollup door ~ 10 by 12 foot

2.3.2.2 Install Door

2.3.2.3 Install Hardware.

2.5.2 Ceiling - No Work Required - Not Included in this Project

3.1.2 Interior Lighting (10)

needed 2' x 4' T8 (8)

3.1.2.2 Replace damaged Fluorescent Light with LEDs 2' x 4'

(2)

3 September 2019

3.7 Lightning Protection System (LPS) 2670 sf

3.7.1 Provide LPS in accordance with NFPA 780 due to flammable storage in building.

3.7.2 3rd Party Certification of LPS

3 September 2019

E. B6027 – Sign Shop Facility

a. Building 6027 is the sign shop. It is a slab on grade pre- engineered metal building with standard metal walls and roof panels. The roof is a gable design gently sloping water to the North and South ends of the building where the water is collected by gutters and downspouts to an above ground drainage system.

b. The building is ~6400 sf

c. There are two types of interior finishes in this building; the office areas are comprised of drywall hung on metal studs, carpet and an acoustical ceiling system. The bay area has exposed insulated metal roof and wall panels.

1. Specific Work and Utilities‐ No Work Required ‐ Not Included in this Project

2.1.1.1 Pour a retaining wall in front of existing retaining wall to repair

CMU wall in front of building 40’ by 8’

2.1.1.2 Fill vertical void at HM Door 1 ~ 8 lf

2.1.1.3 Demo damaged and rusted Exterior Sheet Metal Panels ~ 300 sf

2.1.1.4 Demo Insulation as needed

2.1.1.5 Install Sheet Metal Panels ~300 sf

2.1.1.6 Install Insulation

2.1.1.7 Caulk Exterior Walls ~ 300 sf,

2.1.1.8 Replace wall where AC is mounted in old door frame ~ 8 lf

2.1.2 Paint Exterior Surfaces ~ 1000 sf

2.2.2 Demo Sheet metal Roof ~ 6400 sf

2.2.3 Demo damaged metal roof and ridge vents ~ 120 lf

2.2.4 Demo damaged downspouts, gutters, and soffit ~ 120 lf

2.2.5 Install Sheet metal Roof ~ 6400 sf

2.2.6 Install roof ridge cap or vents ~ 120 lf

2.2.7 Replace damaged Fascia as needed ~ 120 lf

2.2.8 Replace missing Gutter as needed ~ 120 lf

3 September 2019

2.2.9 Replace missing drip edge and downspouts as needed ~160 lf

2.2.10 Replace all awnings ~ 80 sf

2.3.1 Exterior Doors (5)

2.3.1.1 Demo damaged exterior 3070 doors and frames

2.3.1.2 Demo damaged exterior double door and frames

2.3.1.3 Install HM insulated Doors

2.3.1.4 Install Hardware.

2.3.2 Exterior Doors – Sliding or double (7)

2.3.2.1 Demo damaged exterior sliding or double door and frames (5)

2.3.2.2 Install Rollup Doors

2.3.2.3 Install Hardware.

2.3.2.4 Demo doors and frame that have been enclosed with other items and replace damaged framing. ~ 16 lf (2)

2.4 Windows (5)

2.4.1 Demo Windows

2.4.2 Install Windows

2.4.3 Install Hardware.

2.5.2 Ceiling Office area only ~ 3000 sf

2.5.2.2 Replace Insulation

3.1.2 Interior Lighting Storage Area

3.1.2.1 Demo damaged Fluorescent Light components as needed 2' x

4' T8 (8)

3.1.2.2 Replace damaged Fluorescent Light with LEDs 2' x 4' (2)

3.7 Lightning Protection System (LPS) ~ 6400 sf

3.7.1 Repair LPS.

3 September 2019

F. B6031 – Cardboard and Open Storage Facility XLWU 19-8140F

a. Building 6031 is the cardboard storage Area. It is a slab on grade pre-engineered metal building with standard metal walls and roof panels. The roof is a slope design gently sloping water to the South to North ends of the building where the water is collected by gutters and downspouts to an above ground drainage system.

b. There is a split entry door and a roll up door in the NE corner. The building is

~ 4000 sf.

comprised of drywall hung on metal studs and insulated drywall ceiling system. The bay area has exposed un-insulated metal roof and wall panels.

1.1 Inspect Electrical Feed to the building as applicable

1.2 Surveys for asbestos, mold and lead paint should be conducted prior

2.1.1.1 Demo structural I beam that has corroded at the base (2) at front at both corners.

2.1.1.2 Demo damaged Exterior Sheet Metal Panels ~300 sf feet

2.1.1.3 Replace Skylights ~ 64 sf

2.1.1.4 Install structural I beam (2)

2.1.1.5 Install Sheet Metal Panels ~300 sf

2.1.1.6 Caulk Exterior Walls ~ 30 sf

2.2.1 Replace and damaged roof panels ~ 200 sf

2.2.2 Install Gutter back wall ~ 60 lf

2.2.3 Install drip edge ~ 60 lf

2.2.4 Downspouts ~ 40 lf

3 September 2019

2.3.1 Exterior Doors – Entry (1)

2.3.1.1 Demo damaged split opening exterior 3070

2.3.1.2 Install Door

2.3.1.3 Install Hardware.

2.3.2 Exterior Doors – Rollup – Manual (1)

2.3.2.1 Demo damaged exterior rollup door ~ 8 by 10 foot

2.3.2.2 Install Door

2.4 Windows

2.4.1 Replace Broken Window and frame ~ 32” by 60” (1)

2.5.1.1 Gypsum Walls and Insulation ~ 400 sf

2.5.1.1.1 Demo Drywall as needed

2.5.1.1.2 Mold Remediate Storage / Office Space

2.5.1.1.3 Insulate Walls as needed

2.5.1.1.4 Install Drywall as needed

2.5.1.1.5 Paint Interior Walls

2.5.2 Ceiling - Storage Area ~ 100 sf

2.5.2.1 Replace damaged ceiling insulation ~

3 September 2019

3.1.2 Interior Lighting - No Work Required - Not Included in this Project this Project

3 September 2019

G. B6070 – JBECC Facility XLWU 19-8140K

a. Building 6070 is the Joint Base Expeditionary Connectivity Center (JBECCS).

It is a slab on grade pre- engineered metal building with standard metal walls and roof panels. The roof is a gable design gently sloping water to the South and North ends of the building where the water is collected by gutters and downspouts to an above ground drainage system.

b. This facility, constructed in 2005, a 7500 sf facility constructed with metal panel exterior, aluminum windows, solid steel doors, overhead and roll-up doors, metal panel steep slope roof systems, gutters and downspouts. The facility interior has fixed partitions, drywall with stub framing, metal doors, wood and metal frame, plastic shower compartment, toilet partitions, urinal screen, and water closets.

comprised of drywall hung on metal studs, carpet and an acoustical ceiling system. The bay area has exposed insulated metal roof and wall panels.

d. Cooled direct expansion system for heating and cooling, interior and exterior transformer, lightning protection, and grounding systems. Electrical service to the facility consists of a 225-AMP main distribution panel. The facility is fed with 400 Amps at 277/480Y Volts.

1.1 Connect and Inspect electrical connection from Building 6070 to Structure

6072.

1.2 Turn on water to the building

1.3 Establish communication to the Building.

1.4 Surveys for asbestos, mold and lead paint should be conducted prior

3 September 2019

2.1.1.1 Demo damaged Exterior Sheet Metal Panels ~ 1200 feet

2.1.1.2 Install Sheet Metal Panels ~1200 feet

2.1.1.3 Close in 3 bay doors 16’ by 20’

2.1.1.4 Insulate walls where doors were installed

2.1.1.5 Caulk Exterior Walls ~ 30 sf

2.1.1 Paint Exterior Surfaces

2.2.2 Demo Ridge Cap or Vent ~ 150 lf

2.2.3 Demo damaged metal roof ~ 4000 lf

2.2.4 Demo Insulation ~ 4000 lf

2.2.5 Demo damaged downspouts, gutters, and soffit ~ 300 lf

2.2.6 Install Sheet metal Roof ~ 4000 sf

2.2.7 Install roof ridge cap or vents ~ 150 lf

2.2.8 Replace Fascia ~ 300 lf

2.2.9 Replace Gutter ~ 300 lf

2.2.10 Replace drip edge ~ 300 lf

2.2.11 Replace Downspouts ~ 160 lf

2.2.12 Repair door canopy as needed ~ 20 sf

2.3.2 Exterior Doors – Rollup – (2) 16x20

2.3.2.1 Demo damaged exterior rollup door (2)

2.3.2.2 Install Insulated Door

2.3.2.4 Install Door Controls

3 September 2019

2.4 Windows (1)

2.4.1.1 Demo damaged exterior windows ~ 18 by 32

2.4.1.2 Incorporate windows with hurricane resistant level 4

installation

2.5.1.1 Gypsum Walls and Insulation 2000 sf

2.5.1.1.1 Demo Drywall as needed

2.5.1.1.2 Demo Insulation as needed

2.5.1.1.3 Mold Remediate Offices

2.5.1.1.4 Mold Remediate Bathrooms

2.5.1.1.5 Mold Remediate Mechanical Room

2.5.1.1.6 Install Wall Insulation

2.5.1.1.7 Install Drywall as needed

2.5.1.1.8 Paint Walls

2.5.2 Ceiling ~ 2500 sf

2.5.2.1 Demo Ceiling Tiles, Track and Insulation

2.5.2.2 Mold Remediate metal above

2.5.3 Fixtures Men’s and Woman’s (1 ea.)

2.5.3.1 Demo bathroom components and fixtures

2.5.3.2 Repair or replace bathroom components and fixtures.

4.1.2.3 Flush sanitary Lines

4.1.2.4 Test sanitary Sewer functionality

2.5.4 Flooring ~ 3000 sf

2.5.4.1 Demo Carpet

2.5.4.2 Install Carpet

3 September 2019

3.1.1 Exterior Lighting (4)

3.1.2 Interior Lighting

3.1.2.1 Demo damaged Metal Halide components as needed

(10)

3.1.2.2 Demo damaged Fluorescent Light components as

needed 2' x 4' T8 (~30 to 40)

3.1.2.3 Demo damaged Fluorescent Light components with

battery backup as needed 2' x 4' T8 (~10)

3.1.2.4 Replace damaged Fluorescent Light with LEDs 2' x 4'

(~ 30 to 40)

3.1.2.5 Replace damaged Fluorescent Light with LEDs 2' x 4'

with battery backup (~ 10)

3.1.2.6 Replace damaged Exit Lights (2)

3.2 Outlets

3.2.1 Repair or replace electrical distribution Panel

3.2.2 Demo light switches as needed. (~ 10)

3.2.3 Demo 110V Outlets as needed. (~ 40)

3.2.4 Install 110V Outlets as needed. (~ 45)

3.2.5 Install light switches as needed. (~ 10)

3.3 Conduits ( ~ 500 lf)

3.3.1 Demo Existing door circuits where doors were removed

3.3.2 Demo outlets, switches and Ceiling Conduits as needed.

3.3.3 Install outlets, switches and Ceiling Conduits.

3.3.4 Install outlets and communication ports where doors were installed

3 September 2019

3.6 Security

3.6.1 No visual damage to the intrusion detection system

3.6.2 Test Intrusion detection

3.7 Lightning Protection System (LPS) 7500 sf

3.7.1 Repair lightning protection system (LPS), and replace any damaged electrical grounding components.

3.8 Communication

3.8.1 Ethernet and a radio system. No visible damage was apparent

3.8.2 TV Dish antenna damaged (1)

3.8.3 Replace Monaco Fire Notifier antenna as required

3.9 HVAC

3.9.1 Inspect and replace as needed A/C 12.5 Ton Unit (1)

3.9.2 Inspect and replace as needed A/C 7.5 Ton Unit (1)

3.9.3 Inspect and replace AHUs as needed

3.9.4 Replace ductwork as needed

3.9.5 HVAC duct cleaning as needed

3.9.6 Install supply and return registers as needed

3.9.7 Install duct work at 10 foot level in bay center for zonal comfort (100 lf)

3.9.8 Install Bathroom Fans (2)

3.9.9 Certification of HVAC and AHU, and Test/Balance

3.10 Fire Protection System 7500 sf building

3.10.1 Inspect and replace as needed sprinklers

3.10.2 Inspect and replace as needed detectors

3.10.3 Inspect and replace Alarm Horns

3.10.4 Certification of Fire Protection System

3 September 2019

H. B6072 – Storage Facility XLWU 19-8140L

a. Building 6072 is the JEBECC Compound 6000 Area. It is an open air slab on grade pre-engineered metal building with standard metal wall and roof panels.

The roof is a gable design gently sloping water to the South and North ends of the building where the water is collected by gutters and downspouts to an above ground drainage system.

b. The interior finish is exposed metal roof and wall panels. The building is ~

3200 sf.

c. Electrical is fed from Building 6070

1.1 Inspect electrical connection from Building 6070 to Structure 6072, breaker operation did not restore power.

2.1.1.1 Demo damaged Exterior Sheet Metal Panels ~ 100 sf

2.1.1.2 Install Sheet Metal Panels ~ 100 sf

2.1.1.3 Caulk Exterior Walls ~ 10 sf

2.1.2 Paint Exterior Surfaces ~ 10 sf

2.2 Roof ~ 100 sf

2.2.1 Demo damaged downspouts, gutters, and soffit ~ 100 lf

2.2.2 Replace damaged Gutter ~ 200 lf

2.2.3 Replace damaged drip edge ~ 200 lf

2.2.4 Replace downspouts ~ 200 lf

2.3.2 Exterior Doors – Rollup - No Work Required - Not Included in this

3 September 2019

3.1.2 Interior Lighting

needed 2' x 4' T8 ~ (10)

~ (10)

3.2.1 Inspect electrical connection from Building 6070 to Structure 6072, breaker operation did not restore power.

3.3 Conduits

3.3.1 Demo Ceiling Conduits as needed. ~ 20 lf

3.3.2 Install Ceiling Conduits. ~ 20 lf

3.7 Lightning Protection System (LPS)

3.7.1 Repair lightning protection system (LPS) and replace any damaged electrical grounding components.

3 September 2019

4. Mechanical

4.1 Vehicle Exhaust System

4.1.1 Tape duct seams. ~ (4)

3 September 2019

2.2 TASK 2.0

A. 26055 – Boat Storage

a. Structure 26055 is a boat storage facility. It is a slab on grade with a sloped ramp to the water with track. It is covered with pre-engineered metal structure with a hip roof design. It is similar to a large shed with one open end toward the water.

It is comprised of steel metal frame members with sheet metal covering the exterior walls and roof.

b. This building is approximately 200 square feet

c. This building has no HVAC system. It contains an electrical system for lighting purposes.

2.1.1.1 Demo Exterior Sheet Metal Panels ~ 300 sf

2.1.1.2 Install Sheet metal Panels ~300 sf

2.1.1.3 Caulk Exterior Walls ~ 30 sf

2.2.1 Demo Skylights or vents ~ 30 lf

2.2.2 Demo damaged Sheet Metal Roof ~ 200 sf

2.2.3 Install portions of Sheet metal Roof ~ 200 sf

2.2.4 Install Skylights or vents ~ 30 lf

2.3 Exterior Doors - No Work Required - Not Included in this

Project.

2.4 Windows - No Work Required - Not Included in this Project.

2.5 Interior - No Work Required - Not Included in this Project

3 September 2019

2.5.4 Flooring - No Work Required - Not Included in this Project

3.1.1 Exterior Lighting (2)

3.1.1.1 Install a front and rear wall-mounted exterior LED

lights

3.1.2 Interior Lighting (2)

3.1.2.1 Demo damaged Light components

3.1.2.2 Replace damaged sealed LED Light ~ 1 by 4

3.3 Conduits ~ 10 lf

3.2.1 Demo damaged conduits as needed for lighting

3.2.2 Install Conduits

3.7 Lightning Protection System (LPS) 450 sf building

3.7.1 Ensure Building is bonded and grounded.

3.7.2 3rd Party Certification of grounding

3 September 2019

B. B6051 – FUELS PIER 6000 AREA

a. Building 6051 is the PESB with a concrete slab.

b. This building is approximately a 122 sf with a window AC unit. It has three windows and one door. It has phone. It contains a functional electrical system.

The facility is fed with 120/208Y Volts.

2.1 Exterior Walls - No Work Required - Not Included in this Project

2.3.1 Demo damaged fascia ~ 8 lf

2.3.2 Install fascia ~ 8 lf

2.3.1 Exterior Doors – Entry 3070 - No Work Required - Not Included in

3 September 2019

3.1.1 Exterior Lighting (1)

3.1.1.1 Install a wall-mounted exterior LED light above door.

3.1.2 Interior Lighting - No Work Required - Not Included in this Project

3.7 Grounding System (Fuels Off load Area) 80 sf Building

3.7.1 Ensure building is grounded and bonded.

3.7.2 Provide or verify surge suppression on electrical back feeding to panel

3.7.3 3rd party certification of grounding system

4. Mechanical ‐ No Work Required ‐ Not Included in this Project

C. B6053 – LRS and DLA Storage

a. Building 6053 is the Post LRS Defense Logistics Agency (DLA) Storage facility.

It is a slab on grade structure consisting of concrete masonry unit (CMU) exterior walls with a painted finish. This building has a concrete flat roof design covered with a built up roof system.

b. This building is a one story facility with one double door at the front and one single louver window to the east and west of the building.

c. This building is approximately 330 square feet. The building has no environmental control system. It contains a functional electrical system along with minimal plumbing system. The facility is fed with 60 Amps at 120/208Y Volts.

d. Due to age of this facility, lead based paint may be present

2.1 Exterior Walls ~ 740 sf

2.1.1 Repair Block Walls ~ 200 sf

2.1.2 Clean Exterior Walls ~ 740 sf

2.1.3 Paint and Seal Exterior Surfaces ~740 sf

2.2 Roof ~ 330 sf

2.2.1 Demo existing membrane roof

2.2.2 Demo damaged fascia

2.2.3 Support and Seal Opening in the roof ~ 3’ by 3”

2.2.4 Install MBUR roof system

2.2.5 Install fascia

2.3 Exterior Doors (1)

2.3.1.1 Exterior Doors – Entry 3070

2.3.1.4 Demo damaged exterior door double

2.3.1.5 Install Door Insulated

2.3.1.6 Install Panic Hardware.

2.4.1 Louvers are installed with no windows

2.5.1 Walls ~ 740 sf

2.5.1.1 Clean Interior Walls

2.5.1.2 Lead Abate for LBP

2.5.1.3 Paint Interior Surfaces

2.5.2 Ceiling ~ 330 sf

2.5.2.1 Lead Abate for LBP

2.5.2.2 Repair Ceiling Hole ~ 3’ by 3’

2.5.2.3 Paint Interior Surfaces

3.1.1 Exterior Lighting (1)

3.1.1.1 Install a front wall-mounted exterior LED light above door

3.1.2 Interior Lighting (2)

3.1.2.1 Demo Ceiling lights

3.1.2.2 Replace ceiling lights with LED (1)

3.1.2.3 Replace ceiling lights with LED with Battery backup

(1)

3.3 Conduits ~ 10 lf

3.3.1 Demo Conduits for ceiling lights

3.3.2 Install Conduits as needed.

4. Mechanical ‐ No Work Required ‐ Not Included in this Project

4.1 A decommissioned pump system exists. No work required

D. B6054 – LRS Fuels and Admin Storage

a. Building 6054 is precast concrete building serving as a self-contained emergency generator motor control facility and switch gear room.

b. The facility is fed with 600 Amps at 277/480Y Volts.

c. A 450 kW back-up generator and associated diesel fuel tank exist. Equipment appears to be intact and functional

d. The building is ~ 150 sf

2.1 Exterior Walls - No Work Required - Not Included in this Project

2.1.1 Repair Exterior Walls - No Work Required - Not Included in this

2.1.2 Paint Exterior Surfaces - No Work Required - Not Included in this

2.2 Roof - No Work Required - Not Included in this Project

2.3 Exterior Doors - No Work Required - Not Included in this Project

2.3.1 Exterior Doors – Entry 3070 - No Work Required - Not Included in this

3 September 2019

3.1.1.2 Replace wall-mounted exterior lights with LED.

3.1.2 Interior Lighting - No Work Required - Not Included in this Project.

3.2 Outlets (1)

3.2.1 Demo Outlet Cover

3.2.2 Replace Outlet

3.2.3 Install Outlet Cover

3.3 Conduits ~ 5 lf

3.3.1 Demo conduits as needed to install LED lights

3.3.2 Install Conduits

E. B6055 – LRS Fuels and Admin Storage

a. Building 6055 is a slab on grade, one story, and concrete masonry structure with a flat roof on the main building and a gable attached to the west side of the building. The roof of the main structure is made of concrete with a felt, tar and gravel finish with a mild slope draining from the east to the west end of the

b. The exterior storage room has a wood framed gable roof design with a shingle roof that drains to the north and south side of the building. There is no evidence that gutters and down spouts were on the building before the storm. The interior construction is exposed concrete masonry units (CMU) for all the walls and drywall for the ceiling finishes. The interior spaces are comprised of a general work area, storage / toilet rooms.

c. The facility is fed with 60 Amps at 120/208Y Volts.

d. The building is ~ 300 sf

e. Due to age of this facility, lead based paint may be present. Asbestos tiles cover the floor of the restroom.

2.1.1 Clean Exterior Walls ~ 700 sf

2.1.2 Repair damaged CMU block ~ 20 sf

2.1.3 Seal Open Block on shed ~ 1 sf

2.1.4 Caulk Exterior ~ 20 sf

2.1.5 Paint Exterior Surfaces ~ 700 sf

2.2.1 Existing Concrete roof no work required

2.2.2 Demo existing shingle roof on shed 36 sf

2.2.3 Demo damaged fascia ~ 52 lf

2.2.4 Install Metal Roof system ~ 36 sf

2.2.5 Install fascia both roof sections ~ 64 lf

2.2.6 Replace Metal Awning 3’ by 3’

2.2.7 Install Drip edge ~ 20 lf

3 September 2019

2.3.1 Exterior Doors – Entry 3070 (1)

2.3.1.1 Demo shed door and frame

2.3.1.2 Install Door and frame

2.3.1.3 Install Hardware

2.4 Windows (4)

2.4.1 Repair Window Sills

2.4.2 Replace window and frame

2.5.1 Walls 360 sf

2.5.1.1 Mold Remediate ~ 360 sf

2.5.1.2 Lead Abate for LBP ~ 10 lf

2.5.1.3 Clean Walls

2.5.1.4 Paint Interior Walls

2.5.2 Ceiling ~ 360 sf

2.5.2.1 Clean Interior Ceiling

2.5.2.2 Paint Interior Surfaces

2.5.3 Fixtures (3)

2.5.3.1 Demo bathroom components and fixtures

2.5.3.2 Repair or replace bathroom components and fixtures.

2.5.3.3 Flush sanitary Lines

2.5.3.4 Test sanitary Sewer functionality

2.5.4 Flooring ~ 36 sf

2.5.4.1 Asbestos Abatement

2.5.4.2 Demo Asbestos Tiles

2.5.4.3 Tile Bathroom

3 September 2019

3.1.2 Interior Lighting (5)

3.1.2.1 Demo interior Light components

3.1.2.2 Replace ceiling lights with LED (4)

3.3 Conduits ~ 20 lf

F. B6056 – Fuels and Admin

a. Building 6056 is a post fuel administration facility. It is a slab on grade structure consisting of CMU exterior walls with stucco finish, and drywall interior walls with insulation. This building has a hip roof design covered with asphalt shingles on wood trusses with plywood decking.

b. This building is a one story facility with one commercial store front door at the front and one single window to the rear of the building.

c. This building is approximately 500 square feet

d. The building has a functional HVAC system. It contains a functional electrical system along with a plumbing system.

e. The facility is fed with 100 Amps at 120/208Y Volts.

1. Specific Work and Utilities ‐ No Work Required ‐ Not Included in this

2.1.1 Clean Exterior Walls ~ 860 sf

2.1.2 Caulk Exterior ~ 20 sf

2.1.3 Paint Exterior Surfaces ~ 860 sf

2.2 Roof ~ 780 sf

2.2.1 Validate roof is level 4

2.2.2 If not not level 4, demo roof

2.2.3 Demo damaged fascia and soffit

2.2.4 If not level 4 install metal roof

2.2.5 Install Ridge vent ~ 8 lf

2.2.6 Install fascia ~ 108 lf

2.2.7 Install Soffit ~ 108 lf

2.2.8 Install Drip Edge ~ 108 lf

2.3 Exterior Doors - No Work Required - Not Included in this

3 September 2019

2.5.1 Walls ~ 1080 sf

2.5.1.1 Demo Drywall as needed

2.5.1.2 Mold Remediate Office

2.5.1.3 Mold Remediate Bathroom

2.5.1.4 Lead Abate for LBP

2.5.1.5 Install Wall Insulation

2.5.1.6 Install Gypsum Walls

2.5.1.7 Paint Interior Walls

2.5.2 Ceiling ~ 780 sf

2.5.2.2 Mold Remediate metal above

2.5.3 Fixtures (1)

2.5.3.1 Demo bathroom faucet and replace

2.5.4.1 Tile flooring in good shape

3.1.2 Interior Lighting (5)

3.1.2.1 Demo interior Light components

3.1.2.2 Replace ceiling lights with LED (4)

3 September 2019

3.3 Conduits

3.7 Lightning Protection System (LPS) ) - No Work Required - Not Included in this Project

3.8 Communication

3.8.1 Repair small communications Antenna as required

3 September 2019

G. B6085 – BOOM Equipment Storage Facility

a. Building 6085 is a small unconditioned storage facility used for petroleum oils and lubricant (POL) containment boom equipment. The building is constructed as a slab on grade with reinforced concrete masonry unit (CMU) walls. The building has a wood truss gable roof with plywood decking, asphalt shingles and aluminum soffits and trim.

b. The facility is fed by way of diesel generator with 100 Amps at 120/208Y Volts.

Storm damaged the following electrical areas: major damage to power distribution and damage to lighting systems. Existing equipment includes a 10 kW diesel generator with a 125 gallon fuel tank, two hydraulic power units (HPUs), and one hydraulically powered boom reel.

c. There is one rollup door for boom access and one flat panel door for equipment access.

2.1.1 Clean Exterior Walls ~ 900 sf

2.1.2 Caulk Exterior Wall ~ 20 sf

2.1.3 Paint Exterior Surfaces ~ 400 sf

2.2 Roof – The shingle roof and supports are missing

2.2.1 Demo remains of damaged shingle roof ~ 100 sf

2.2.2 Install Sheet metal hip Roof ~ 370 sf

2.2.3 Install roof ridge cap or vents ~ 20 lf

2.2.4 Install Soffit ~ 55 lf

2.2.5 Install Fascia ~ 55 lf

2.2.6 Install drip edge ~ 60

3 September 2019

2.3.1 Exterior Doors – Entry (1)

2.3.1.1 Demo exterior door

2.3.1.2 Install door with hurricane resistant level 4 installation

2.3.1.3 Install door hardware

2.3.2 Exterior Doors – Rollup (1)

2.3.2.1 Demo exterior door frame Rollup ~ 8 X 8”

2.3.2.2 Incorporate Rollup doors with hurricane resistant

level 4 installation ~ 8 X 8

2.3.2.3 Install door hardware

2.5.1 Walls ~ 900 sf

2.5.1.1 Clean Exterior Walls

2.5.1.2 Caulk Exterior Wall

2.5.1.3 Paint Exterior Surfaces

3.1.1 Exterior Lighting (3)

3.1.1.1 Demo damaged wall-mounted exterior lights

3 September 2019

3.1.2 Interior Lighting (2)

3.1.2.1 Demo damaged Fluorescent Light components as

needed 2' x 4' T8

3.2.1 Repair Distribution Panel as needed.

3.2.2 Demo interior and exterior damaged outlets (3)

3.2.3 Install Outlets (2)

3.2.4 Install GFCI Outlets (2)

3.3 Conduits ~ 30 lf

3.3.1 Demo damaged conduits

3.4 Generator

3.4.1 Test Generator Operation

3.8 Communication - No Work Required - Not Included in this Project.

3.8.1 Communication drop for the facility was in good condition, but no communications drops were apparent within the facility.

4. Mechanical

a. No sanitary sewer or gas services exist

4.1 Hose Bibbs

4.1.1 Repair or replace interior and exterior hose bibbs. (2)

4.2 Pressure Washer Equipment-(1)

4.2.1 Demo pressure washer

4.2.2 Install Pressure Washer

4.3 Hydraulic Pump Equipment-(1)

4.3.1 Inspect, Repair or replace Diesel Hydraulic Pump

4.3.2 Inspect, Repair or replace Electric Hydraulic Pump

4.3.3 Inspect, Repair or Verify Winder Operation

3.0 POINTS OF CONTACT (POCS)

3.1 POCS WILL BE COORDINATED THROUGH THE CO.

3.2 CONTRACTING OFFICER AUTHORITY:

A. CO, the term used herein, does not include any representative not acting within the scope of his/her authority. Notwithstanding any of the provisions of this contract, the CO shall be the only individual authorized to in any way amend or modify the terms of this contract.

3.3 PROJECT MANAGER (PM):

A. The PM (TBD).

3.4 USER CONTACT

A. (TBD).

3.5 BUILDING CONTACT

A. (TBD).

END OF DOCUMENT