Answers_for_Repair_WEG_B274.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Repair WEG Facility B274 Federal contract opportunity
Solicitation number
FA4819-19-R-A014
Issued by
Department of the Air Force Air Combat Command

About this file

Answer to Questions for Repair WEG B274

View the file

Other files for this federal contract opportunity

Other files attached to Repair WEG Facility B274, newest first.
File Type Posted
Solicitation_Amendment_-_FA481919RA0140005.pdf PDF
Solicitation_Amendment_FA481919RA0140005_SF_30.pdf PDF
Attachment_01_-_SOW_22_Aug_19.pdf PDF
Answers_for_Repair_WEG_B274_2.xlsx XLSX spreadsheet
Solicitation_Amendment_FA481919RA0140004_SF_30.pdf PDF
Attachment_01_-_SOW_12_Aug_19.pdf PDF
Attachment_02_-_SOW_Appendix_A_12_Aug_19.pdf PDF
Solicitation_Amendment_-_FA481919RA0140004.pdf PDF
Site_Visit_Attendee_List_19RA014.pdf PDF
Solicitation_Amendment_-_FA481919RA0140003.pdf PDF
Solicitation_FA481919RA0140002.pdf PDF
Attachment_03_-_SOW_Appendix_B_22_May_19.pdf PDF
Attachment_07_-_AF_3064.pdf PDF
Attachment_04_-_Wage_Determination_4_Jan_19.pdf PDF
Attachment_08_-_AF_3065.pdf PDF
Attachment_09_-_Proposal_Schedule.pdf PDF
Solicitation_FA481919RA014.pdf PDF
Attachment_02_-_SOW_Appendix_A_22_May_19.pdf PDF
Attachment_01_-_SOW_12_Jul_19.pdf PDF
Attachment_12_-_Required_Insurance.pdf PDF
Attachment_05_-_AF_Form_66.xls XLS spreadsheet
Attachment_10_-_General_Financial_Information.pdf PDF
Attachment_11_-_Sample_RFI.PDF PDF
Attachment_06_-_AF_Form_3000.pdf PDF
DRAFT_SOW_FA4819-19-R-A014.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPIF

Pre Proposal Inquiry FormSolicitation No: FA481919RA014
Contracting Officer Name: Mrs. Melissa SandersRepair WEG Facility B274, Tyndall AFB Florida
Contract Administrator Name: Kathryn KittoBid Due Date: 27 August 2019

Email: 325CONS.Construction@us.af.mil

Question No.Question TypeReference (Sect/Task/pg.)QuestionGovernment Response
1Post Site Visit InquirySOW Appendix ACan you please provide updated drawings to reflect the reduction in electrical scope?The revised drawing "Bldg. 274 floor plan - w new power addition locations (v1)" in Appendix A has been edited to indicate the recently installed new load. This installed load is new since the as-builts and is identified using Strikethru font and noted as In Service. None of the equipment in this drawing is on the electrical as-built drawings. SOW paragraph 2.6.5.B has been edited to show same.
2Post Site Visit InquirySOW Appendix BCan you please provide drawings that are not photos of the PDFs, but actual PDFs? It’s very difficult to see the detail in the snapshots. An actual PDF would allow for the documents to be magnified without losing clarity.PDF version of all available as-builts are now provided as part of Attachment 02 Appendix A 12 Aug 19
3Post Site Visit InquirySolicitation FA481919RA014Are you requiring that the WOSB be registered in the SBA’s WOSB repository? …since this is really the only way to guarantee that the company is actually woman-owned. Otherwise, any company can simply check the WOSB box in their SAM profile.Yes. Please see the insertion of clause 52.219-30 – Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program. The clause was inadvertantly left out of the solicitation prior to posting as the requirement was originally synoposized as a Total Small Business Set Aside.
4Post Site Visit InquirySolicitation FA481919RA014Please advise if only Women Owned Small Businesses are eligible to bid on this project.This requirement is set aside for Women Owned Small Business Concerns
5Post Site Visit InquiryCONSWe would like to respectufully request at bid extension of two weeks.The proposal deadline is extended from 20 August 2019 at 0900 to 27 August 2019 at 1300.
6Post Site Visit InquiryCONSIs it acceptable to submit the electronic copy of the proposal via email by the proposal due date and follow up with hard copy no later than 2 business days?The electronic copy and hard copy are due by the proposal deadline - 27 August 2019 at 1300.
7Post Site Visit InquirySOW Appendix APlease provide drawing showing size and location of the fire water main.PDF version of all available as-builts are now provided. Please see Attachment 02 Appendix A 12 Aug 19
8Post Site Visit InquiryPlease provide existing and new equipment heat loads.Heat loads for the new equipment are not available. However the types of equipment include: band saw, metal bender, milling machine, lathe, plasma cutter, drill press, and welding machine.
9Post Site Visit InquiryPlease provide building occupancy requirements (# of people).Twelve
10Post Site Visit InquirySOW 2.6.3.D.1Please clarify if a chilled water system is required or just an HVAC system with outside condenser units.A chilled water system is not required. Reference revised SOW, Task 3, paragraph 2.6.3.D.1
11Post Site Visit InquirySOW 3.15Please confirm if consumption of temporary construction power and water will be paid by The Government, or if such consumption of temporary utilities should be included in the contractor's scope of services.Consumption of temporary power and water will be paid for by the Government.
12Post Site Visit InquirySOW Appendix APlease provide drawing of existing utilities.PDF version of all available as-builts are now provided. Please see Attachment 02 Appendix A 12 Aug 19
13Post Site Visit InquiryPlease clarify if superintendent can also act as the SSHO and QA/QC on site.Superintendent may not also act as QA/QC. Superintendent is allowed to act as SSHO. SSHO may also act as QA/QC, as long as this person is not also Superindendent.
14Post Site Visit InquirySOW 2.6.3.AHVAC: Subsection A includes the replacement of gravity louvers for ventilation fans. Are the existing ventilation fans intaking fresh air through the louver, or are they blowing out the louver? Is there any available data for these existing fans, such as airflow? Are the motors in the ventilation fans/louvers or is this an assumption that they need to be replaced?PDF version of all available as-builts are now provided, reference mechanical drawings. Fan is presumed to be blowing out. Reference revised SOW Task 3, paragraph 2.6.3.A
15Post Site Visit InquirySOW 2.6.3.BIs the intent of the new chillers to serve only the bay or the entire bldg.? Section 2.6.3.B states that the entire HVAC split system, including the condensing unit must be replaced. Will this be replaced in kind, or is the intent to have the new chiller system replace the DX system? Does the existing HVAC split system provide heat? If so, what is the source?The intent of the new chillers is to serve only the bay, not the entire building. Replace the existing HVAC split system in kind. PDF version of all available as-builts are now provided, reference mechanical drawing for existing specs.
16Post Site Visit InquirySOW 2.6.3.D.1UFC 3-410-01 4-2.11.3 D1102.6 states that a connection must be provided between the chiller panel(s) and the DDC system. Do the existing DDC control panels have the capability or capacity for controls connections from the chiller panel(s)?There is not an existing chiller, therefore no existing DDC control panel from the chiller.
17Post Site Visit InquirySOW 2.6.4Fire Protection: Has a flow test been performed? If so, are the results available? Is there any change to the hazard category of the bldg.?This data is unavalable at this time.
18Post Site Visit InquirySOW 2.6.7Plumbing – What is the existing incoming water supply size? Where is the location?PDF version of all available as-builts are now provided. One of the drawings does show the size and distance from the building, but not the specific location.
19Post Site Visit InquirySOW Appendix AAre full sized drawings of the existing as-builts available?Only in PDF format, paper copies are not available.
20Post Site Visit InquiryHow long is the copper feeder from the furthest drop to the closest?PDF version of all available as-builts are now provided. Please see Attachment 02 Appendix A 12 Aug 19
21Post Site Visit InquirySOW 2.6.5The Statement of Work Item 2.6.5 A) states to replace all existing electrical inside the Building. Much of the convenience receptacles, lighting circuitry, roll-up door circuitry, existing service equipment and dry-type transformers are in-tact and not damaged. Shall this in-tact circuitry be replaced or can it be re-used?Please design to replace all existing electrical inside the building per the original SOW.
END OF DOCUMENTEND OF DOCUMENTEND OF DOCUMENTEND OF DOCUMENT