Questions_and_Answers.docx

DOCX document 12 KB Posted

Attached to
Outdoor Scoreboard Installation Federal contract opportunity
Solicitation number
FA4819-18-Q-6040
Issued by
Department of the Air Force Air Combat Command

About this file

Please see attached responses to questions received from interested vendor(s).

View the file

Other files for this federal contract opportunity

Other files attached to Outdoor Scoreboard Installation, newest first.
File Type Posted
PWS_Scoreboard_Revised_17_Sep.pdf PDF
Attachment_4,_Site_Visit.pdf PDF
PWS_Scoreboard_Final.pdf PDF
Attachment_3_-_Quote_Sheet.pdf PDF
Wage_Determination.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers from Site Visit Date: 13 Sep 2018 Time: 1300 CST Location: Tyndall AFB Track and Field

1. Is the contractor supposed to remove and dispose of the old sign? Yes

2. Are the current I-Beams mounted in concrete? Yes

3. Can the new I-beams be installed in the same general area and simply cut the existing I-beams flush with the ground rather than excavating them? Yes

4. What is the size of the current sign? Approximately 12’ x 5’

5. Would square steel tubes be an acceptable alternative to I-Beams? Yes, as long as the support structure is engineered to support the proposed scoreboard in accordance with any applicable codes and regulations

6. From what location will the new scoreboard primarily be operated from (i.e location of person with scoreboard control?) Midfield

- Confirm ability of crane and concrete trucks to be located at site (i.e. all support equipment required for installation). Any equipment required for this effort can reach the site. Vendor is required to take care to not damage the the property and avoid traversing any equipment over the track and field.

- What is the height of current sign, and does the new sign need to be the same height or different? The sign is currently at 10’ from the ground, the new sign shall also be 10’ from the ground.