Attachment_03,_Pricing_Schedule.pdf
PDF 588 KB Posted
- Attached to
- Repair Dorm Exterior Wall Federal contract opportunity
- Solicitation number
- FA4819-18-B-7001
About this file
Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4819-18-B-7001-0002.pdf | ||
| Questions_and_Answers_20_June.pdf | ||
| FA4819-18-B-7001-01.pdf | ||
| Attachment_04,_SOW_Appendix_C_5_Apr_18.pdf | ||
| Attachment_02,_SOW_Appendix_A_5_Apr_18.pdf | ||
| FA4819-18-B-7001.pdf | ||
| Attachment_05,_PW_Best_Management_Pract.PDF | ||
| Attachment_01,_SOW_5_Apr_18.pdf | ||
| Attachment_06,_Building_Wage_Determination.pdf | ||
| Repair_Dorm_Walls_Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
325TH FIGHTER WING (ACC)
TYNDALL AIR FORCE BASE FLORIDA
XLWU 16-1085
REPAIR FAILED DORM EXTERIOR WALLS, B1046
SOW APPENDIX B:
PRICING SCHEDULE
PRICING SCHEDULE IGE
TASK 1 EAST AND WEST WALLS
XLWU 16-1085 - Repair Failed Dorm Exterior Walls, B1046
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
SUB TOT POP Design (Base) 90 Days
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Assessment Services JOB -$
002 Professional Design Services JOB -$
003 -$
SUB TOT POP Construction (Base) 60 Days
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Mobilization/Demobilization JOB -$
002 Equipment Rental MONTH -$
003 Super Intendence DAY -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Joint Sealant Material LF -$
002 Brick Veneer SF -$
003 Concrete Fascia Support EA -$
004 Demolition & Waste Disposal CY -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Concrete Fascia Support EA -$
002 Pressure Washing SF -$
003 Brick Veneer SF -$
004 Joint Sealant Material LF -$
005 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Overhead -$
002 Profit -$
003 Bond -$
2.3.1 (b.) AND 2.3.1 (c.) GENERAL CONDITIONS
DESCRIPTION
A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
2.3.1 TASK 1 - EAST & WEST WALLS
2.3.1 (a.) DESIGN & PROFESSIONAL SERVICES
DESCRIPTION
Line item shall account for all costs associated with permitting & professional services necessary to assess the existing conditions as necessary to permit the design team develop complete construction documents detailing the repair effort.
Line item shall account for all costs associated with the permitting & professional services necessary to develop complete construction documents detailing the repair effort.
PROJECT SUBTOTAL =
2.3.1 OVERHEAD, PROFIT, BOND
DESCRIPTION
Overhead Costs
Profit
Actual Bond
PROJECT TOTAL ESTIMATE =
All costs associated with providing and installing the new brick veneer system in strict accordance with the Construction Documents.
All cost associated with providing and installing joint sealant materials and/or other water proofing elements in strict accordance with the Construction documents.
All costs associated with removal of the precast concrete facia support components as defined in the Construction Documents. The unit EA is for each fascia panel.
All costs associated with legal disposal of demolition/construction material off site.
2.3.1 (c.) CONSTRUCTION
DESCRIPTION
All costs associated with providing and installing the precast concrete fascia support system in strict accordance with the Construction Documents. The unit EA is for each fascia panel.
All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.
All costs associated with pressure washing the concrete fascia exterior and joint surfaces (full width of building) in strict accordance with the Construction Documents.
All costs associated with providing oversite during the performance of on site activities; demolition, construction.
2.3.1 (b.) DEMOLITION
DESCRIPTION
All costs associated with removal of the horizontal and vertical joint sealant materials of the brick veneer and precast conrete fascia as defined in the Construction Documents.
All costs associated with removal of the brick veneer and associated veneer components as defined in the Construction Documents.
PRICING SCHEDULE TASK 1 EAST AND WEST WALLS
XLWU 16-1085 - Repair Failed Dorm Exterior Walls, B1046
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
2.3.1 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
OTHER PROJECT NOTES FOR BID $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
SUB TOT
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
2.3.1 TASK 1 - EAST & WEST WALLS
SUB TOT
RENTAL DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
PRICING SCHEDULE TASK 2 STAIR WELL SCREEN WALLS
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
SUB TOT POP Design Base +7 Days
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Assessment Services JOB -$
002 Professional Design Services JOB -$
003 -$
SUB TOT POP Construction Base + 21 Days
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Mobilization/Demobilization JOB -$
002 Equipment Rental MONTH -$
003 Super Intendence DAY -$
004 -$
005 -$
006 -$
007 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Screen Wall SF -$
002 Temporary Railing LF -$
003 Demolition & Waste Disposal CY -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Patch Concrete SF -$
002 Brick Finishing SF -$
003 Railing LF -$
004 -$
005 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Overhead -$
002 Profit -$
003 Bond -$
2.3.2 (b.) AND 2.3.2 (c.) GENERAL CONDITIONS
DESCRIPTION
A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.
All costs associated with providing oversite during the performance of on site activities; demolition, construction.
2.3.2 TASK 2 - STAIR WELL SCREEN WALLS
2.3.2 (a.) DESIGN & PROFESSIONAL SERVICES
DESCRIPTION
Line item shall account for all costs associated with permitting & professional services necessary to assess the existing conditions as necessary to permit the design team develop complete construction documents detailing the repair effort.
Line item shall account for all costs associated with the permitting & professional services necessary to develop complete construction documents detailing the repair effort.
2.3.2 (b.) DEMOLITION
All costs associated with legal disposal of demolition/construction material off site.
All costs associated with removal of the brick screen wall and related components as defined in the Construction Documents.
All costs associated with removal of the temporary railing in strict accordance with the Construction Documents.
DESCRIPTION
2.3.2 (c.) CONSTRUCTION
DESCRIPTION
All costs associated with patching concrete damage and screen wall support holes in strict accordance with the Construction Documents.
All costs associated with providing and installing the new brick finishing elements in strict accordance with the Construction Documents. This item would include any ledge details or flashing specified by the designer.
PROJECT SUBTOTAL =
All cost associated with providing and installing new railing in strict accordance with the Construction documents.
2.3.2 OVERHEAD, PROFIT, BOND
DESCRIPTION
Overhead Costs
Profit
Actual Bond
PROJECT TOTAL ESTIMATE =
PRICING SCHEDULE TASK 2 STAIR WELL SCREEN WALLS
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
2.3.2 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
OTHER PROJECT NOTES FOR BID $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
SUB TOT
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
2.3.2 TASK 2 - STAIR WELL SCREEN WALLS
SUB TOT
PRICING SCHEDULE TASK 3 FASCIA JOINTS
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
SUB TOT POP Design Base + 7 Days
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Assessment Services JOB -$
002 Professional Design Services JOB -$
003 -$
SUB TOT POP Construction Base + 21 Days
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Mobilization/Demobilization JOB -$
002 Equipment Rental MONTH -$
003 Super Intendence DAY -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Joint Sealant Material LF -$
002 Demolition & Waste Disposal CY -$
003 -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Pressure Washing SF -$
002 Joint Sealant Material LF -$
003 -$
004 -$
005 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Overhead -$
002 Profit -$
003 Bond -$
2.3.3 TASK 3 - FASCIA JOINTS (ANNEX INCLUDED)
2.3.3 (a.) DESIGN & PROFESSIONAL SERVICES
DESCRIPTION
Line item shall account for all costs associated with permitting & professional services necessary to assess the existing conditions as necessary to permit the design team develop complete construction documents detailing the repair effort.
Line item shall account for all costs associated with the permitting & professional services necessary to develop complete construction documents detailing the repair effort.
DESCRIPTION
2.3.3 (b.) AND 2.3.3 (c.) GENERAL CONDITIONS
DESCRIPTION
A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.
All costs associated with providing oversite during the performance of on site activities; demolition, construction.
2.3.3 (b.) DEMOLITION
All costs associated with removal of the vertical joint sealant materials of the precast conrete fascia as defined in the Construction Documents.
All costs associated with legal disposal of demolition/construction material off site.
2.3.3 (c.) CONSTRUCTION
DESCRIPTION
All costs associated with pressure washing the concrete fascia exterior and joint surfaces (full width of building) in strict accordance with the Construction Documents.
2.3.3 OVERHEAD, PROFIT, BOND
All cost associated with providing and installing joint sealant materials and/or other water proofing elements in strict accordance with the Construction documents.
Profit
Actual Bond
PROJECT TOTAL ESTIMATE =
PROJECT SUBTOTAL =
DESCRIPTION
Overhead Costs
PRICING SCHEDULE TASK 3 FASCIA JOINTS
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
2.3.3 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
OTHER PROJECT NOTES FOR BID $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
SUB TOT
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
2.3.3 TASK 3 - FASCIA JOINTS (ANNEX INCLUDED)
SUB TOT
PRICING SCHEDULE TASK 4 BRICK VENEER
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Assessment Services JOB -$
002 Professional Design Services JOB -$
003 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Mobilization/Demobilization JOB -$
002 Equipment Rental WEEK -$
003 Super Intendence DAY -$
004 -$
005 -$
006 -$
007 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Brick Veneer SF -$
002 Demolition & Waste Disposal WEEK -$
003 -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Brick Veneer SF -$
002 -$
003 -$
004 -$
005 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Overhead -$
002 Profit -$
003 Bond -$
Notes
Notes
POP Construction Base + 7 Days
Notes
2.3.4 (a.) DESIGN & PROFESSIONAL SERVICES
DESCRIPTION
Line item shall account for all costs associated with permitting & professional services necessary to assess the existing conditions as necessary to permit the design team develop complete construction documents detailing the repair effort.
Line item shall account for all costs associated with the permitting & professional services necessary to develop complete construction documents detailing the repair effort.
2.3.4 TASK 4 - BRICK VENEER
POP Design Base +7 Days
Notes
DESCRIPTION
2.3.4 (b.) AND 2.3.4 (c.) GENERAL CONDITIONS
DESCRIPTION
A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.
All costs associated with providing oversite during the performance of on site activities; demolition, construction.
2.3.4 (b.) DEMOLITION
All costs associated with removal of the brick veneer and associated veneer components as defined in the construction documents.
All costs associated with legal disposal of demolition/construction material off site.
PROJECT TOTAL ESTIMATE =
PROJECT SUBTOTAL =
2.3.4 (c.) CONSTRUCTION
DESCRIPTION
All costs associated with providing and installing the new brick veneer system at the areas removed in accordance with the construction documents.
Notes
2.3.4 OVERHEAD, PROFIT, BOND
DESCRIPTION
Overhead Costs
Profit
Actual Bond
PRICING SCHEDULE TASK 4 BRICK VENEER
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
2.3.4 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
OTHER PROJECT NOTES FOR BID $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
SUB TOT
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
2.3.4 TASK 4 - BRICK VENEER
SUB TOT
PRICING SCHEDULE TASK 5 CONCRETE REPAIR
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Assessment Services JOB -$
002 Professional Design Services JOB -$
003 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Mobilization/Demobilization JOB -$
002 Equipment Rental MONTH -$
003 Super Intendence DAY -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Concrete Spall/delamination SF -$
002 Concrete Crack LF -$
003 Demolition & Waste Disposal WEEK -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Concrete Spall/delamination SF -$
002 Concrete Crack LF -$
003 -$
004 -$
005 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Overhead -$
002 Profit -$
003 Bond -$
Profit
Actual Bond
PROJECT TOTAL ESTIMATE =
2.3.5 OVERHEAD, PROFIT, BOND
DESCRIPTION Notes
Overhead Costs
PROJECT SUBTOTAL =
All costs associated with concrete spall/delamination repair beyond demolition in accordance with the Construction Documents and International Concrete Repair Institute Guidelines
All costs associated with concrete crack repair beyond demolition in accordance with the Construction Documents and International Concrete Repair Institute Guidelines
DESCRIPTION Notes
All costs associated with legal disposal of demolition/construction material off site.
2.3.5 (c.) CONSTRUCTION
DESCRIPTION Notes
All costs associated with removal concrete material, laitance and reinforcing steel corrosion in accordance with the Construction Documents and International Concrete Repair Institute Guidelines
All costs associated with removal concrete material, laitance and reinforcing steel corrosion in accordance with the Construction Documents and International Concrete Repair Institute Guidelines
2.3.5 (b.) DEMOLITION
All costs associated with providing oversite during the performance of on site activities; demolition, construction.
DESCRIPTION Notes A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.
2.3.5 (b.) AND 2.3.5 (c.) GENERAL CONDITIONS POP Construction Base + 7 Days
2.3.5 TASK 5 - CONCRETE REPAIR
2.3.5 (a.) DESIGN & PROFESSIONAL SERVICES POP Design Base +7 Days
DESCRIPTION Notes
Line item shall account for all costs associated with permitting & professional services necessary to assess the existing conditions as necessary to permit the design team develop typical concrete repair details in the construction documents.
Line item shall account for all costs associated with the permitting & professional services necessary to provide typical concrete repair details in construction documents and consulting consluting services for repairs.
PRICING SCHEDULE TASK 5 CONCRETE REPAIR
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
2.3.5 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
OTHER PROJECT NOTES FOR BID $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
SUB TOT
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
2.3.5 TASK 5 - CONCRETE REPAIR
SUB TOT
PRICING SCHEDULE TASK 6 Pressure Wash Exterior Surfaces
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Assessment Services JOB -$
002 Professional Design Services JOB -$
003 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Mobilization/Demobilization JOB -$
002 Equipment Rental WEEK -$
003 Super Intendence DAY -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 -$
002 -$
003 -$
004 -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Pressure Wash SF -$
002 -$
003 -$
004 -$
005 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Overhead -$
002 Profit -$
003 Bond -$ Actual Bond
PROJECT TOTAL ESTIMATE =
DESCRIPTION Notes
Overhead Costs
Profit
2.3.5 OVERHEAD, PROFIT, BOND
PROJECT SUBTOTAL =
All costs associated with pressure washing buiding exterior surfaces not accordance with the SOW (Roof & New Work Excluded).
2.3.5 (c.) CONSTRUCTION
DESCRIPTION Notes
DESCRIPTION Notes
All costs associated with providing oversite during the performance of on site activities; demolition, construction.
2.3.5 (b.) DEMOLITION
DESCRIPTION Notes
A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.
2.3.6 (a.) AND 2.3.6 (b.) GENERAL CONDITIONS POP Construction Base + 7 Days
2.3.6 TASK 6 - PRESSURE WASH EXTERIOR SURFACES
2.3.6 (a.) DESIGN & PROFESSIONAL SERVICES POP Design Base +7 Days
DESCRIPTION Notes
Line item shall account for all costs associated with permitting & professional services necessary to assess the existing conditions as necessary to permit the design team develop typical concrete repair details in the construction documents.
Line item shall account for all costs associated with the permitting & professional services necessary to provide typical concrete repair details in construction documents and consulting consluting services for repairs.
PRICING SCHEDULE TTASK 6 Pressure Wash Exterior Surfaces
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
2.3.6 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
OTHER PROJECT NOTES FOR BID $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
2.3.6 TASK 6 - PRESSURE WASH EXTERIOR SURFACES
SUB TOT
RENTAL DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
SUB TOT
PRICING SCHEDULE TASK 7 REPLACE ALL EXTERIOR DOORS
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Assessment Services JOB -$
002 Professional Design Services JOB -$
003 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Mobilization/Demobilization JOB -$
002 Equipment Rental MONTH -$
003 Super Intendence DAY -$
004 Other General Conditions JOB -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Remove Doors EA -$
002 Remove Frames EA -$
003 Remove Locksets EA -$
004 Demolition & Waste Disposal Week -$
005 -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 New Frames EA -$
002 New Doors EA -$
003 New Closers EA -$
004 New Locksets EA -$
005 Prime / Paint / Finishing EA -$
006 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL
001 Overhead -$
002 Profit -$
003 Bond -$
2.3.7 (a.) AND 2.3.7 (b.) GENERAL CONDITIONS POP Construction Base + 7 Days
2.3.7 TASK 7 - REPLACE ALL EXTERIOR DOORS
2.3.7 (a.) DESIGN & PROFESSIONAL SERVICES POP Design Base +7 Days
DESCRIPTION Notes
Line item shall account for all costs associated with permitting & professional services necessary to assess the existing conditions as necessary to permit the design team develop typical concrete repair details in the construction documents.
Line item shall account for all costs associated with the permitting & professional services necessary to provide typical concrete repair details in construction documents and consulting consluting services for repairs.
DESCRIPTION Notes A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.
DESCRIPTION Notes
All costs associated with providing oversite during the performance of on site activities; demolition, construction.
All other general condition costs associated with project performance
2.3.7 (b.) DEMOLITION
All costs associated with removal doors and related hardware in accordance with the Construction Documents.
All costs associated with removal doors frames and related hardware in accordance with the Construction Documents.
All costs associated with removal of door locksets in accordance with the Construction Documents. All locksets to be returned to the Government.
All costs associated with providing and installing new frames and thrsholds in accordance with the Construction Documents.
All costs associated with legal disposal of demolition/construction material off site. Locks to be returned to the government.
2.3.7 (c.) CONSTRUCTION
DESCRIPTION Notes
All costs associated with providing and installing new doors and hardware in accordance with the Construction Documents. This line item will include door accessories & hardware not listed in other lines to include kick plates, chain locks, hinges, peepholes, etc.
All costs associated with providing and installing new doors closers in accordance with the Construction Documents.
All costs associated with providing and installing new doors locksets in accordance with the Construction Documents.
PROJECT SUBTOTAL =
2.3.7 OVERHEAD, PROFIT, BOND
Actual Bond
PROJECT TOTAL ESTIMATE =
DESCRIPTION Notes
Overhead Costs
Profit
All costs associated with providing and installing prime, paint, and other finishing efforts to complete the installation in accordance with the Construction Documents.
PRICING SCHEDULE TASK 7 REPLACE ALL EXTERIOR DOORS
1/22/2018
Note: Provide additional pages as needed Pricing Schedule
2.3.7 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
OTHER PROJECT NOTES FOR BID $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
2.3.7 TASK 7 - REPLACE ALL EXTERIOR DOORS
SUB TOT
RENTAL DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
SUB TOT
| BID SCHED TASK 1 E&W Walls |
| BID SCHED TASK 2 Stair |
| BID SCHED TASK 3 F&R Fascia |
| BID SCHED TASK 4 F&R Veneer |
| BID.pdf |
| BID SCHED TASK 1 E&W Walls |
| T1 |
| BID SCHED TASK 2 Stair |
| T2 |
| BID SCHED TASK 3 F&R Fascia |
| T3 |
| BID SCHED TASK 4 F&R Veneer |
| T4 |
| Bid1.pdf |
| BID T1 |
| T1 |
| Pricing.pdf |
| BID T1 |
| T1 |
| BID T2 |
| T2 |
| BID T3 |
| T3 |
| BID T4 |
| T4 |
| BID T5 |
| T5 |
| BID T6 |
| T6 |
| BID T7 |
| T7 |
File details come from the government source that posted it.