2016-06-16_FLB_Amended_Fairlead_Beam_Hand_Hole_Cover_Engineering_Change_Order.pdf

PDF 15 KB Posted

Attached to
Fairlead Beams Tyndall AFB
Solicitation number
FA4819-16-Q-3016
Issued by

About this file

New Hand Hole Cover Specifications

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. ENGINEERING ORDER NO.

SYMBOL

SYMBOL

SYMBOL

SYMBOL

SYMBOL

SYMBOL

SYMBOL

PHONE

DATE: PAGE OF

(S)

PAGES

4. DWG NO.

14. CORROSION CONT. MON.

15. NDI

16.

17. DWG CHANGED BY

18. CHANGE CHECKED BY

19. EO/DWG RELEASED BY

DWG SIZE DWG SHEET LATEST DWG REV LTR

2. DWG TITLE

20. DESCRIPTION OF CHANGES/REMARKS

AF IMT 3925, 20030819, V1

12. EO PREPARED/REQUESTED BY

13. ENGINEERING APPROVAL

11. DOCUMENTS AFFECTED (TO/TCTO/SPEC/Other)

OTHER COMMENTS

5. NEXT ASSY

ENGINEERING ORDER

8. TYPE OF ENGINEERING ORDER 9. REASONS FOR CHANGE

ADVANCE CHANGE ERROR CORRECTION

DEVIATION AUTHORIZED DESIGN CHANGE

CHANGE NOTICE DRAWING CLARIFICATION

INFORMATION UPDATED DRAWING

6. USED ON

10. DISPOSITION OF SPARES

REWORK

MODIFY

SCRAP

REPLACE

3. DWG CAGE CODE

7. OPR CAGE CODE

DATE

SYMBOL

PHONE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

REPLACES AF FORM 2600, 19940701, WHICH IS OBSOLETE

20150827 1 1

ARRESTING GEAR FAIRLEAD BEAM 3-SHEAVES 21439 52-D-6907

52-W-2295 BAK-12 AND MAAS (ARRESTING SYSTEMS) 98752 D 3 B

REF USAF DRAWING Christopher Peisher AFLCMC 20160616

4782221371

N/A

Christopher Peisher

AFLCMC 20160616

4782221371

WNZEC

REFERENCE ECO 2010C0002

1 - PAGE 8 OF 21: WAS 33.05 IS 33.75. WAS 9.40 IS 8. WAS 5.37 IS 7.188. WAS 13.25 IS 9.625. WAS 87.05 IS 87.75.

2 - PAGE 16 OF 21: WAS 17.75 IS 12.5. WAS 14.25 IS 10.25. WAS 7.125 IS 5.125 WAS 3.13 (2 PLACES) IS .50 WAS .25 (THICKNESS) IS .31.

WAS "REAR HAND HOLE ..." IS "HAND HOLE COVER (TOP)"

3 - PAGE 17 OF 21: WAS 12.75 IS 8.88. WAS 8.75 IS 7.38. WAS .563 IS .50 (THICKNESS). REMOVE (2) HOLES.

WAS "REAR HAND HOLE COVER..." IS "HAND HOLE COVER (BOTTOM)"

4 - PAGE 18 OF 21: WAS 2.75 IS 1.438. WAS 2.5 IS 1.813 WAS "REAR HAND HOLE ASSEMBLY" IS "HAND HOLE ASSEMBLY" 5 - PAGE 2 OF 21: WAS QTY 1 OF -23 PART AND QT 1 OF -22 PART, IS RESCIND -23 AND -22 PARTS, IS QTY 2 OF -20 AND QTY 2 OF -21

6 - PAGES 19,20,21 ARE RESCINDED.

File details come from the government source that posted it. Updated .