2016-06-16_FLB_Amended_Fairlead_Beam_Hand_Hole_Cover_Engineering_Change_Order.pdf
PDF 15 KB Posted
- Attached to
- Provide Fairlead Beams - 325 CONS
- Solicitation number
- FA4819-16-Q-3016
About this file
New specifications for the hand hole covers
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. ENGINEERING ORDER NO.
SYMBOL
SYMBOL
SYMBOL
SYMBOL
SYMBOL
SYMBOL
SYMBOL
PHONE
DATE: PAGE OF
(S)
PAGES
4. DWG NO.
14. CORROSION CONT. MON.
15. NDI
16.
17. DWG CHANGED BY
18. CHANGE CHECKED BY
19. EO/DWG RELEASED BY
DWG SIZE DWG SHEET LATEST DWG REV LTR
2. DWG TITLE
20. DESCRIPTION OF CHANGES/REMARKS
AF IMT 3925, 20030819, V1
12. EO PREPARED/REQUESTED BY
13. ENGINEERING APPROVAL
11. DOCUMENTS AFFECTED (TO/TCTO/SPEC/Other)
OTHER COMMENTS
5. NEXT ASSY
ENGINEERING ORDER
8. TYPE OF ENGINEERING ORDER 9. REASONS FOR CHANGE
ADVANCE CHANGE ERROR CORRECTION
DEVIATION AUTHORIZED DESIGN CHANGE
CHANGE NOTICE DRAWING CLARIFICATION
INFORMATION UPDATED DRAWING
6. USED ON
10. DISPOSITION OF SPARES
REWORK
MODIFY
SCRAP
REPLACE
3. DWG CAGE CODE
7. OPR CAGE CODE
DATE
SYMBOL
PHONE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
REPLACES AF FORM 2600, 19940701, WHICH IS OBSOLETE
20150827 1 1
ARRESTING GEAR FAIRLEAD BEAM 3-SHEAVES 21439 52-D-6907
52-W-2295 BAK-12 AND MAAS (ARRESTING SYSTEMS) 98752 D 3 B
REF USAF DRAWING Christopher Peisher AFLCMC 20160616
4782221371
N/A
Christopher Peisher
AFLCMC 20160616
4782221371
WNZEC
REFERENCE ECO 2010C0002
1 - PAGE 8 OF 21: WAS 33.05 IS 33.75. WAS 9.40 IS 8. WAS 5.37 IS 7.188. WAS 13.25 IS 9.625. WAS 87.05 IS 87.75.
2 - PAGE 16 OF 21: WAS 17.75 IS 12.5. WAS 14.25 IS 10.25. WAS 7.125 IS 5.125 WAS 3.13 (2 PLACES) IS .50 WAS .25 (THICKNESS) IS .31.
WAS "REAR HAND HOLE ..." IS "HAND HOLE COVER (TOP)"
3 - PAGE 17 OF 21: WAS 12.75 IS 8.88. WAS 8.75 IS 7.38. WAS .563 IS .50 (THICKNESS). REMOVE (2) HOLES.
WAS "REAR HAND HOLE COVER..." IS "HAND HOLE COVER (BOTTOM)"
4 - PAGE 18 OF 21: WAS 2.75 IS 1.438. WAS 2.5 IS 1.813 WAS "REAR HAND HOLE ASSEMBLY" IS "HAND HOLE ASSEMBLY" 5 - PAGE 2 OF 21: WAS QTY 1 OF -23 PART AND QT 1 OF -22 PART, IS RESCIND -23 AND -22 PARTS, IS QTY 2 OF -20 AND QTY 2 OF -21
6 - PAGES 19,20,21 ARE RESCINDED.
File details come from the government source that posted it. Updated .