ATTACHMENT 1.rtf
RTF text file 16 MB Posted
- Attached to
- OIL WATER SAMPLING
- Solicitation number
- FA4809-12-T-0022
About this file
ATTACHMENT 1 - STATEMENT OF WORK
Text of this file
Statement of Work - Wastewater Sampling of Oil Water Separators
1. SCOPE: The work covered by the provisions of this contract consists of furnishing all labor, tools, equipment and supplies necessary to provide laboratory analysis of 14 influent grab samples taken from Oil Water Separators throughout Seymour Johnson Air Force Base. Purpose of this sampling is to ensure base meets environmental compliance requirements with hazardous waste regulations, used oil regulations, and meets sanitary sewer discharge limits required by the City of Goldsboro NC Sanitary Sewer Use Ordinance - Title V, Chapter 51.010 “Prohibited Discharges”. Grab samples will be analyzed by a NC certified lab for TCLP (Toxicity Characteristic Leaching Procedure) metals, ignitability, TCLP VOCs (Volatile Organic Compounds), TCLP Extraction, PCB (Polychlorinated biphenyls), and total petroleum hydrocarbons (TPH)(8015). The contractor is responsible for:
a. Providing an estimate (the Government reserves the right to not accept the estimate and stop at this point at no expense).
b. Upon notification to proceed, coordinate sampling (grab) time and sampling date with authorized Government personnel.
c. Collect influent grab samples (floatables/solids) at 14 oil water separators.
d. Complete chain of custody forms, labels, and shipping documents.
e. Prepare and ship grab samples to NC Certified Laboratory (provide name of Laboratory) with chain of custody and all other required documents in the required sample holding time period.
f. Complete the job in accordance with all local, state, and federal regulations.
g. Provide an email copy of certified sampling analysis results no later than 14 days after results are received by lab to Mr. Ronnie Wilson, 4 CES/CEAN, 1095 Peterson Ave, SJAFB, ronnie.wilson@seymourjohnson.af.mil. Also provide one hard copy of results. Units for the sampling results reported shall be in mg/L.
2. MATERIALS: Contractor will provide all necessary materials to complete grab sampling to include if needed - shipping containers/coolers, bottles, labor, bottle labels, preservatives, Fedx labels, chain of custody forms, and/or shipping labels.
3. LOCATION: This work is to be accomplished at the 14 Oil Water Separators at Seymour Johnson Air Force Base, Goldsboro, NC (refer to attached figure 1). Oil Water Separators (OWS) to be sampled are OWS 2115, 2115A, 2154, 3100, 3105, 3220C, 3402, 4527, 4531, 4552, 1015, 10164, 10277, and 10312.
4. SITE VISIT: A site visit will be held to allow the contractor to become familiar with the sampling sites after the award is issued and before the contract period begins.
5. WORKMANSHIP: All workmanship will comply with standard trade practices. The contractor shall provide all qualified personnel, equipment, and services required to collect and ship to a NC Lab 14 influent grab samples from oil water separators.
6. CLEANUP: The contractor is responsible to return all work sites to the condition in which they were found.
7. WARRANTY: The contractor will guarantee all workmanship for a period of one year from completion of work.
8. The Contractor shall complete all required tasks 30 days after date of contract.
Figure 1 - OWS MAP file_0.png file_1.wmf
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1.doc | DOC document | |
| Posting Solicitation.doc | DOC document | |
| ATTACHMENT 2.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .