Attachment 2 Blank Cost Spreadsheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| Attachment_1_SOW.pdf | ||
| FA4803-18-B-0007.pdf | ||
| Attachment_3_Blank_Bid_Schedule.pdf | ||
| Attachment_4_Map.jpg | JPG image | |
| 18-B-0007_Presolicitation_Notice-FBO.GOV.pdf | ||
| Attachment_6_Shaw_AFB_ID2_Handbook--October_2012.pdf | ||
| Attachment_7_Wage_Determination.pdf | ||
| Attach_5_Shaw_AFB_Design_Std.pdf | ||
| Attachment_8_Base_EAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor: Address:
Contract for: 18-0043 Construct Parking Veterns Park Proposed Contract Price: $0.00
Purchase Request Number Work Location: Shaw AFB, SC
Material Cost Labor Cost
Line No. Item Unit of
Measure Quantity Unit Price Total Manhours Avg.Rate Total Direct Cost Line Total 1 Surveying Crew for layout, 4 man crew DAY
2 Erosion Control LS
3 Excavation/Backfill CY
4 Asphalt Paving and Stone Base on graded sub-Grade SF
5 Costruct 5 Foot sidewalk SF
6 Install surface inlets, tie into base drainage system LS
7 Concrete curb, 8" wide, 6" high LF $0.00
8 Demo curb, concrete, over 4" in height LF
9 Painting parking stall lines, wth Handicap EA
10 Area Lighting LS
TOTALS: $0.00
TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL OTHER DIRECT COST $0.00
TOTAL DIRECT COST
OVERHEAD
SUBTOTAL
PROFIT
TOTAL CONTRACT PRICE
TITLE: PROJECT ENGINEER FIRM NAME: 20 CES/CEOER
BY: Bob Jones
FA4803-18-B-0007 Attachment 2 pg 1 of 1