Attachment_1_SOW.pdf
PDF 187 KB Posted
- Attached to
- Construct Veteran's Park Parking Federal contract opportunity
- Solicitation number
- FA480318B0007
About this file
Attachment 1 Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| FA4803-18-B-0007.pdf | ||
| Attachment_2_Blank_Estimate.pdf | ||
| Attachment_3_Blank_Bid_Schedule.pdf | ||
| Attachment_4_Map.jpg | JPG image | |
| 18-B-0007_Presolicitation_Notice-FBO.GOV.pdf | ||
| Attachment_6_Shaw_AFB_ID2_Handbook--October_2012.pdf | ||
| Attachment_7_Wage_Determination.pdf | ||
| Attach_5_Shaw_AFB_Design_Std.pdf | ||
| Attachment_8_Base_EAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF
WORK FOR
VLSB 18-0043 Construct Veteran’s Park Parking
VLSB 18-0043 April 9, 2018
DESCRIPTION OF SERVICES
The contractor shall provide all management, tools, supplies, equipment, labor, and applicable licenses and permits necessary to ensure that the design and construction of parking lot at North East corner of Shaw AFB, South Carolina adjacent to US 76/378.
Upon notification by the Contracting Officer, and through the issuance of a Notice to Proceed (NTP), the contractor shall perform the services outlined in the statement of work. The new parking lot shall meet the Unified Facilities Criteria (UFC), South Carolina Department of Transportation (SCDOT), and Shaw Air Force design standards.
The contractor shall provide two design submissions for approval for construction. 65% and 95% shall be submitted and approved prior to start of construction. Both submissions will require a basis of design outling the desired work to be accomplished with a construction sequence and methods. Drawings shall contain associated details necessary that applys to construction of pavement sections, curb sections, drainage structures and plan layout with cross sections. The contractor may provide any specfications as it pertains to the construction on a sheet in the project drawings.
PERMITS
The contractor shall pay for and obtain the required permits as outlined in the Performance Plan. Any additional permits that are required shall be acquired, and paid for, by the contractor. The contractor shall act in accordance with SCDHEC, Federal, and Shaw AFB guidelines (Shaw AFB Design Standards).
EROSION CONTROL
The contractor shall submit an erosion control plan prior to construction. The plan should address the protection of existing streams, ditches, and storm drain lines from water-borne soil by means of silt fences, or hay bale dams. Repair and re-establish damaged or eroded slopes, elevations or grades and restore surface damaged during construction prior to acceptance.
WORKING CONDITIONS
The Contractor shall take all precautions to insure that his operations are conducted in a
FA4803-18-B-0007 Attachment 1 pg 1 of 3 manner so as not to interfere with the normal operations of the surrounding facilities and the safety and convenience of the base personnel. Where work occurs within the Shaw Air Force Base roads, the contractor shall take all precautions to insure that operations are conducted in a manner so as not to interfere with normal public traffic operations. Traffic control shall be provided in accordance with all SCDOT standards as required during construction.
Scope The contractor shall prepare the area prior to construction, to include excavation, backfilling, and grading as required. Provide material or satisfactory materials free from rocks 2 inches or larger in any dimension. The subbase shall be broken up to a minimum depth of 6 inches, pulverized and compacted to 95%. Testing shall be provided by an independent certified laboratory. Contractor shall lay 2” of approved binder course, meeting all SCDOT standards, over the subbase. The contractor shall overlay 2” of asphalt over the binder course. The asphalt shall be of Type C SCDOT approved mix.
The contractor shall ensure the parking lot is designed such that it facilitates proper drainage. This includes installing surface inlets, and tying them into the base drainage system. The contractor shall include in design and install area lighting with latest Shaw AFB standard aluminum pole mounted lighting on concrete bases.
The contractor shall provide 5 foot wide side walks from the parking to connect to Veterns Park. The contractor shall provide for 12 parking spaces total with three Handicap spaces. The contractor shall provide for Shaw AFB Standard curb around all pavement and leading to and around the parking area. The constactor shall also provide for safty curb/handrail along sidewalk along embankment to prevent wheel chairs from running off embankment.
PAINTING
The contractor shall paint all associated parking stalls as designed. Normal stalls shall be painted white and handicapped stalls shall be painted blue. All paint used shall meet SCDOT standards.
SITE RESTORATION
Upon completion of the parking lot, the contractor shall restore the site to be aesthetically pleasing; to include laying 3” of topsoil and hydroseeding in any areas that were disturbed. The contractor shall submit the type of seed mixture to be used to the government, prior to hydroseeding.
DISPOSAL HAUL ROUTE
The contractor shall use an approved hauling route to prevent interference with base operations. To prevent problems with traffic, noise, wear and tear on roads, or other problems having the potential to adversely affect health, safety, or the environment, the government reserves the right to regulate routes, intervals, delivery points, and times for
Pg 2 of 3 hauling.
HAULING
Debris hauled by the contractor shall be enclosed to prevent leaking, spilling, or blowing.
In the unlikely event that debris is spilled, blown, or leaked from hauling equipment and vehicles, the contractor shall ensure debris or dirt is promptly removed from any transportation route. The contractor shall remove dirt and mud caused by tracks of hauling equipment within one hour or notification by the government.
DISPOSAL
The contractor shall dispose of a minimum amount of debris at a SCDHEC approved off-base landfill in accordance with local, state, and federal regulations and procedures. No disposal or burning is allowed on base. The contractor shall provide the Contracting Officer evaluator with a copy of each dump receipt within twelve (12) hours of every disposal.
RECORD DRAWINGS
Upon completion of the work, the Contractor shall submit one set of as-built drawings not later than five days after final inspection and prior to application of final payment.
Record Documents shall reflect any changes or deviations in Contract Documents and be tied to South Carolina State Plane coorcdiate System NAD 88 Rev 2000.
FA4803-18-B-0007 Attachment 1 pg 1 of 3
End of Statement of Work
| STATEMENT OF WORK FOR |
| PERMITS |
| EROSION CONTROL |
| WORKING CONDITIONS |
| Scope |
| PAINTING |
| SITE RESTORATION |
| DISPOSAL HAUL ROUTE |
| HAULING |
| DISPOSAL |
| RECORD DRAWINGS |
| End of Statement of Work |