Attachment_6_Slab_detail_-_Modified_with_Changes.pdf
PDF 2 MB Posted
- Attached to
- Construct 5 ISU Storage Pads Federal contract opportunity
- Solicitation number
- FA4803-17-Q-A013
About this file
Attachment 6 Slab Detail
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA480317QA013_Attachment_1_SOW_Rev_1.pdf | ||
| FA480317QA013_Amendment_1.pdf | ||
| FA480317QA013_Attachment_2_Location_Picture.pdf | ||
| Attachment_2_Bid_PKG.pdf | ||
| FA480317QA013_Construct_ISU_Storage_Pad.pdf | ||
| Attachment_7_Design_Standards.pdf | ||
| Attachment_1_SOW.pdf | ||
| Attachment_4_Wage_Determination.pdf | ||
| Attachment_8_Unified_Facilities_Criteria.pdf | ||
| Attachment_3_Cost_Estimate.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN COORDINATION AND REVIEW COMMENTS PROJECT NUMBER
Bob Jones VLSB 17-0100
COMMENTS BY PHONE EMAIL DATE
Summary 803-895-9624 robert.jones.17@us.af.mil 05/23/17
VLSB 17-0100 TYPE OF REVIEW
Have drafting remove column and rebar mats. They can draw in the fabric or leave some rebar to re-enforce the thickened edge.
12"
# 4 Re-bar 12" O.C. e.w.
Entire Slab for Top Mat.
Typical Footing for slabs
#4 rebar 12" O.C.
e.w. around permiter
Attachment 6
FA4803-17-Q-A013
21 Jun 17 Page 1 of 1
File details come from the government source that posted it. Updated .