Specification_for_Transformer_Build_with_Pictures.pdf

PDF 10 MB Posted

Attached to
Pad Mounts Federal contract opportunity
Solicitation number
FA4801-19-Q-1010A
Issued by
Department of the Air Force Air Combat Command

About this file

Specifications and Pictures

View the file

Other files for this federal contract opportunity

Other files attached to Pad Mounts, newest first.
File Type Posted
Questions_Set_2.pdf PDF
Questions_Set_1.pdf PDF
COMBO_Pad_Mounts_A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications for Transformer Build Three Phase Pad Mount 3750 kVA transformer – 2 each

HV: 4160/2400

LV: 480/277

Primary Bushings: Dead Front (600 amp 1 piece dead breaking bushings) – Radial Feed (Picture of connection elbow below)

Secondary Bushings: Need to feed out to Load Bank (10 input connections per phase on load bank and 4 ground connections on load bank)

Degree Rise: 65 C

Frequency: 60 hz

Impedance: Standard

Elevation: 4200 feet

Configuration: (Generator is WYE and Loadbank is Delta)

Cable: 1/0, 5 Kilovolt aluminum cable with concentric neutral (used to connect generator to PSC and PSC to transformer)

Windings: Copper

Additional Specs: Pressure Relief Valve, Pressure Gauge, Temperature Gauge, Liquid Level Guage, Drain and Sampler Valve

** To Include Delivery**

Load Bank Specs

Model/Part#: Avtron 5000 series (K975A/D39939)

480 Volts, 60 Hz, 2500 kW

10 cables per phase/400 amps max per terminal

4 cables for ground

Connections: Cam-type quick-connect male cable receptacles are securely mounted to the cool air intake side of the load bank.

One-Line Diagram

--Pictures of Connections & Equipment Attached—

BEAR Power Unit

MEP-12

IBEAR

High Voltage 1/0 5kV Cable

Primary Switching

Center

High Voltage 1/0 5kV Cable

Transformer Cables Loadbank

Pictures Table of Contents

Picture 1 – Loadbank Data Plate

Picture 2 – Loadbank Phase Terminal Connection

Picture 3 – BEAR Power Unit Output Terminals

Picture 4 – IBEAR Output Terminals

Picture 5 – MEP 12 Output Terminals

Picture 6 – 600 Amp Elbow connection on 1/0, 5 Kilovolt aluminum high voltage cable

Picture 7 – Primary Switching Center (PSC) Data Plate

Picture 8 – PSC Output Terminals (Input Terminals are the same)

Picture 9 – PSC Breaker Data Plate

Picture 10 – PSC Breaker

Page 13 – 17 – Loadbank Schematics

ASCO

Specifications for Transformer Build
Transformer Build Specs with pics
Loadbank Data Plate
Loadbank Terminals
BEAR Power Unit Terminals
IBEAR Terminals
MEP12 Terminals
HV Cable Terminal
Data Plate PSC
PSC Input Output2
PSC Breaker Data Plate
PSC Breaker
Loadbank Schematics