Questions_Set_1.pdf
PDF 166 KB Posted
- Attached to
- Pad Mounts Federal contract opportunity
- Solicitation number
- FA4801-19-Q-1010A
About this file
Q & A Set 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Set_2.pdf | ||
| Specification_for_Transformer_Build_with_Pictures.pdf | ||
| COMBO_Pad_Mounts_A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Set 1
1) Are the new transformers to be furnished with cam/lock devices and necessary cabling from the output spades to these devices by the contractor?
Cabling will not need to be provided, just the required outputs to tie the cabling into the transformer.
2) Are the interconnecting 5 KV cables from the generator to the S & C switch existing? Including the 600 Amp, Non load breaker elbows?
All cables and connections are provided by government (these items are already on site), this was provided as information only for contractor to ensure that the connections are correct on the transformer.
3) Are the interconnecting 5 KV cables between the S & C switch and the transformer, government provided? Including the 600 Amp, Non load breaker elbows?
All cables and connections are provided by government (these items are already on site), this was provided as information only for contractor to ensure that the connections are correct on the transformer.
4) Is off loading of the transformers by Air Force staff to be provided, or will the contractor be responsible for this service?
Off-loading can be provided by the AF if specs are provided on needed equipment. Need to know weight and lifting points.