Questions_Set_2.pdf
PDF 329 KB Posted
- Attached to
- Pad Mounts Federal contract opportunity
- Solicitation number
- FA4801-19-Q-1010A
About this file
Questions Set 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Set_1.pdf | ||
| Specification_for_Transformer_Build_with_Pictures.pdf | ||
| COMBO_Pad_Mounts_A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Set 2
1. Are the required cam/lock devices to have the noted quantity installed within the transformer low voltage section, or externally in a NEMA 3R rated enclosure? Mounted to the transformer cabinet?
Regarding the first question, it doesn’t matter to me if there is an external enclosure or if they will be directly tied to the low voltage side, once the cables are hooked up they will stay. The vendor can build this out how ever.
2. Also, the answer states that "Cabling will not need to be provided". Does that mean that the Government will provide the cabling from the transformer secondary spades to these Cam/Lock devices, including the termination lugs on these spades?
For the second question, can the termination lugs for on the spades be added to the contract? The government will build the cables from the lugs to the camlock.