Updates_changes_in_Statement_of_Work_for_FA4800.pdf

PDF 64 KB Posted

Attached to
CCTV Installation
Solicitation number
FA4800-17-Q-0012
Issued by

About this file

Listing of changes made in Statement of Work.

View the file

Other files

File Type Posted
Updated_Vendor_Questions_and_Answers.docx DOCX document
Vendor_Questions_and_Answers_for_FA4800.docx DOCX document
Security_Equipment_Install_SOW.pdf PDF
HQ_ACC_A2O_Building_617_Security_Upgrade.pptx PPTX presentation
FA4800-17-Q-0012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Updates changes in Statement of Work for FA4800-17-Q-0012 (CCTV Installation)

(Updated 6/27/17)

• 4.1 The amount of power receptacles to be installed has been updated to specify a total of seven (7).

• 4.2 Plenum cable has now been specified as a required material for the installation of the strobe lights.

• 4.3 Switches at the entrance and exit to control the strobe lights has been specified (two).

• 4.4 The front LCD monitor has been specified as being required to have split screen capability (Rear LCD split screen capability optional).

• 4.5 Camera capabilities are required to be of digital quality or equal.