Attachment_2_-_Design_Drawings_-_16_Jul_17.pdf

PDF 17 MB Posted

Attached to
Maintain Runway 8 and 26 Clear Zone Drainage Federal contract opportunity
Solicitation number
FA4800-17-B-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 2 - Design Drawings

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

857B

882B

532A

989A

688A

815A

535A

537A

830A

840A

826B

835B

527A

960B

957A

512B

820B

816A

445B

583A

969B

974A

845A

690B

827A

995B

530A

991A

504A

881B

852B

874A

534B

988B

536A

513A

512A

502B

461B 551A

842A

539A

826A

504B

819A

809A

527B

645A

882A

431B

462B

819B

983A

452A

980A

827B

985B

849A

505B

531A

878A

951B

971B

426A

525B

507B

533B

873B

805A

456A

430B

825A

539B

502A

816B

957B

526A

849B

510A

456B

538A

986A

838B

435A

852A

458A

833A

969A

551B

988A

537B

956B

875B

825B

505A

449B

453A

691B

989B

991B

542A

460B

821B

850A

455A

854B

542B

976B

535B

453B

987A

829B

875A

462A

878B

423B

428A

960A

985A

508A

856B

10611061

428B

808B

821A

689A

689B

840B

843B

980B

436A

524B

829A

807B

648B

449A

820A

857A

983B

833B

525A

446A

807A

530B

982A

818B

876B

536B

648A

823B

458B

823A

987B

982B

848A

831A

838A

454B

436B

538B

950B

423A

809B

532B

526B

951A

845B

856A

976A

446B

956A

541A

691A

804B

430A

429A

974B

533A

874B

454A

830B

843A

975A

541B

435B

950A

450A

995A

450B

975B

835A

445A

461A

513B

997A

455B

986B

690A

429B

854A

805B

997B

873A

460A

534A

971A

431A

818A

806B

842B

806A

524A

815B

452B

531B

881A

508B

808A

507A

876A

426B

850B

688B

804A

510B

831B

848B

E

A

S

T

W

E

S

T

R

U

N

W

A

Y

WEOR

WEST END

of RWY

HOT

RADAR

PAD

TAXIWAY I

TAXIWAY J

S

O

U

H

A

M

P

WEST AIRCRAFT PARKING APRON

C

L

O

S

E

D

T

A

X

I

W

Y

TAXIWAY B

T

A

X

I

W

T

A

X

I

W

EEOR

EAST END

of RWY

T

A

X

I

W

D

N

O

R

H

M

P

T

A

X

I W

E

EAST AIRCRAFT PARKING APRON

T

A

X

I

W

G

A

X

I

W

F

X

O

V

E

R

R

U

N

X

O

V

E

R

R

U

N

D E

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

IC

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

IC

E

EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS: EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS CONT'D.:

(c) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN (10)

YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR

SYSTEM.

(1) IMPROVE THE CHANNELS TO A CONDITION WHERE TEN (10) YEAR STORM

WILL NOT OVERTOP THE BANKS AND A TWO (2) YEAR STORM WILL NOT

CAUSE EROSION TO THE CHANNEL BED OR BANKS; OR

(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN (10)

YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES;

(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT

PEAK RUNOFF RATE FROM A TWO (2) YEAR STORM TO INCREASE WHEN

RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE

PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN (10) YEAR STORM TO

INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR

DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE

PLAN-APPROVING AUTHORITY TO PREVENT DOWNSTREAM EROSION.

D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE

IMPROVEMENTS.

E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED

CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITIONS OF THE SUBJECT PROJECT.

F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE

SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE

DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE

REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING

THE MAINTENANCE.

G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING

CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL

DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM

THE FACILITY TO THE RECEIVING CHANNEL.

H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.

I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION

ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE

CHANNEL, PIPE OR PIPE SYSTEM OR TO A DETENTION FACILITY.

J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR

PARCELS IN A RESIDENTIAL , COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT

BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE

DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT

PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT

CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS.

K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED

IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND

BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE.

TABLE 6-1

GENERAL EROSION AND SEDIMENT CONTROL NOTES

ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT

CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM

STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 & 4VAC 50-30-40 EROSION AND SEDIMENT CONTROL REGULATIONS.

ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE (1) WEEK PRIOR TO THE

PRE-CONSTRUCTION CONFERENCE, ONE (1) WEEK PRIOR TO COMMENCEMENT OF THE LAND

DISTURBING ACTIVITY, AND ONE (1) WEEK PRIOR TO THE FINAL INSPECTION.

ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST

STEP IN CLEARING.

ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON

THE SITE AT ALL TIMES.

ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON

THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE

CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR

REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.

ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL

MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE

PLAN APPROVING AUTHORITY.

ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL

TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL

STABILIZATION IS ACHIEVED.

ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.

ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER

EACH RUNOFF-PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO

MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.

C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED

MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL:

(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER

MS-1 PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN THIRTY (30) DAYS. PERMANENT STABILIZATION SHALL BE

APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE (1) YEAR.

MS-2 DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS

WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.

MS-3 A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT

EROSION.

MS-4 SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.

MS-5 STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.

MS-6 SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE

TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.

A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE

OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE

ACRES.

B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPROMISED OF FLOW FROM DRAINAGE

AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT

BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER

ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE

STRUCTURAL INTEGRITY OF THE BASIN DURING A 25 YEAR STORM OF 24 HOUR DURATION.

RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH

CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.

MS-7 CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.

SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE (1) YEAR OF PERMANENT

STABILIZATION SHALL BE PROVIDED

WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.

MS-8 CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN

ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.

MS-9 WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION

SHALL BE PROVIDED.

MS-10 ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE

PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST

BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.

MS-11 BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE

OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT

CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.

MS-12 WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST

EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED IN THE

CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES

IF ARMORED BY NONERODIBLE COVER MATERIAL.

MS-13 WHEN A LIVE WATER COURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE

(2) IN ANY SIX (6) MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF

NONERODIBLE MATERIAL SHALL BE PROVIDED.

MS-14 ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR

CROSSING LIVE WATERCOURSES SHALL BE MET.

MS-15 THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN

THE WATERCOURSE IS COMPLETED.

MS-16 UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING

STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA.

A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.

B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.

C. EFFLUENT FROM DEWATERING DEVICES SHALL BE FILTERED OR PASSED THROUGH AN APPROVED

SEDIMENT TRAPPING DEVICE, OR BOTH AND DISCHARGED IN A MANNER THAT DOES NOT

ADVERSELY AFFECT FLOWING STREAMS OR OFFSITE PROPERTY.

D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO

MINIMIZE EROSION AND PROMOTE STABILIZATION.

E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS.

F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.

MS-17 WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS

PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT HAS BEEN REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER

LAND-DISTURBING ACTIVITIES.

MS-18 ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.

MS-19 PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITIONS, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF TWENTY-FOUR (24) HOUR DURATION IN ACCORDANCE

WITH THE FOLLOWING STANDARDS AND CRITERIA:

A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE

DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING

CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS

DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES

AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED.

B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING

MANNER:

1. THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT

OF ANALYSES WITHIN THE CHANNEL IS ONE HUNDRED (100) TIMES GREATER THAN THE

CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR

2. (a) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO (2) YEAR STORM TO

VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE

EROSION OF CHANNEL BED OR BANKS.

(b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE

USE OF A TEN (10) YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS

BANKS AND BY THE USE OF A TWO (2) YEAR STORM TO DEMONSTRATE THAT

STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E

A

IR

C O

M B

A T

C O

M M

A N

D

J B

L E

L

A N

G L E

Y V

A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F F

IC

E

6' MAX.

FLOW

SHEET FLOW INSTALLATION

(PERSPECTIVE VIEW)

A

POINTS A SHOULD BE HIGHER THAN POINT B.

(FRONT ELEVATION)

1. SET THE STAKES UPSLOPE ALONG THE LINE

OF STAKES.

3. STAPLE FILTER MATERIAL

TO STAKES AND EXTEND

IT INTO THE TRENCH.

4. BACKFILL AND COMPACT

THE EXCAVATED SOIL.

FLOW

FLOW

MAX.

DRAINAGEWAY INSTALLATION

2. EXCAVATE A 4"X4" TRENCH

B A

3'

4"

CONSTRUCTION OF A SILT FENCE

(WITHOUT WIRE SUPPORT)

SF

70' MIN. EXISTING

A

PAVEMENT

3'

5:1

CE

FILTER CLOTH 6" MIN. A

SIDE ELEVATION

EXISTING GROUND

70' MIN.

B WASHBACK

10" MIN.

(OPTIONAL)

12' MIN.*

10'

VDOT #1 POSITIVE DRAINAGE 10" MIN.

B

PLAN VIEW

12' MIN.

3' MIN.

FILTER CLOTH SECTI0N A-A

6'-7"

REINFORCED CONCRETE DRAIN SPACE

SECTION B-B

(OPTIONAL)

MOUNTABLE BERM

COURSE

AGGREGATE

TO SEDIMENT

TRAPPING DEVICE

EXISTING

PAVEMENT

MIN.

OPERATION

OF INGRESS AND EGRESS

* MUST EXTEND FULL WIDTH

STONE CONSTRUCTION ENTRANCE

1.5' MAX. FRAME

3' MIN. ( V

PERSPECTIVE VIEWS

STAKE

FABRIC

1' MIN.

ELEVATION OF STAKE AND

FABRIC ORIENTATION DETAIL A

SPECIFIC APPLICATION

2' X 4' WOOD FRAME

GATHER

EXCESS

AT

CORNERS

THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS

A RELATIVELY FLAT AREA (SLOPE NO GREATER THAN 5%) WHERE THE INLET

SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 C.F.S.) ARE TYPICAL. THE

METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH

AS IN STREET OR HIGHWAY MEDIANS.

DROP INLET

WITH GRATE

A

SILT FENCE DROP INLET

PROTECTION

IP

FLOW

1. SET POSTS AND EXCAVATE A 4"x4"

TRENCH UPSLOPE ALONG THE LINE

OF POSTS.

2. STAPLE WIRE FENCING TO

THE POSTS.

3. ATTACH THE FILTER FABRIC TO THE WIRE

FENCE AND EXTEND IT INTO THE TRENCH.

4. BACKFILL AND COMPACT

THE EXCAVATED SOIL.

EXTENSION OF FABRIC AND WIRE INTO THE TRENCH

FILTER FABRIC

WIRE

4"

FLOW

NOTE: SILT FENCE FABRIC SHALL BE 36" TALL,

STAKED WITH 2"X2"X5" HARDWOOD STAKES ON 6" CENTERS.

CONSTRUCTION OF A SILT FENCE

(WITH WIRE SUPPORT)

SF

18" MIN.

GRAVEL * (12"MIN. DEPTH)

SEDIMENT

WIRE MESH

FILTERED

WATER

SPECIFIC APPLICATION

RUNOFF WATER

WITH SEDIMENT

THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY CONCENTRATED

FLOWS ARE EXPECTED, BUT NOT WHERE PONDING AROUND THE STRUCTURE MIGHT

CAUSE EXCESSIVE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND

UNPROTECTED AREAS.

* GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE.

GRAVEL AND WIRE MESH DROP

INLET SEDIMENT FILTER IP

PS

TS

SEED1

LAND USE SPECIES APPLICATION RATES

MINIMUM CARE LAWN TALL FESCUE1 175-200 LBS

COMMERCIAL OR RESIDENTIAL or

BERMUDAGRASS1 75 LBS

HIGH-MAINTENANCE LAWN TALL FESCUE1 200-250 LBS

(CONTRACTOR SHALL CHOOSE GRASS or TYPE BASE ON PREDOMINATE TYPE ON BERMUDAGRASS1 (seed) 40 LBS (UNHULLED) EXISTING LAWN) or 30 LBS (HULLED)

BERMUDAGRASS1 (by other vegetative establishment method, see Std. & Spec. 3.34)

GENERAL SLOPE (3:1 OR LESS) TALL FESCUE1 128 LBS

RED TOP GRASS OR CREEPING RED FESCUE 2 LBS

SEASONAL NURSE CROP2 20 LBS

TOTAL 150 LBS

LOW-MAINTENANCE SLOPE TALL FESCUE1 93-108 LBS

(STEEPER THAN 3:1) BERMUDAGRASS1 0-15 LBS

RED TOP GRASS OR CREEPING RED FESCUE 2 LBS

SEASONAL NURSE CROP2 20 LBS

SERICEA LESPEDEZA3 20 LBS

TOTAL 150 LBS

1 - WHEN SELECTING VARIETIES OF TURFGRASS, USE THE VIRGINIA CROP IMPROVEMENT ASSOCIATION (VCIA) RECOMMENDED TURFGRASS VARIETY LIST. QUALITY SEED WILL BEAR A LABEL INDICATING THAT THEY ARE APPROVED BY VCIA. A CURRENT TURFGRASS VARIETY LIST IS AVAILABLE AT THE LOCAL COUNTY EXTENSION OFFICE OR THROUGH VCIA AT 804-746-4884 OR AT

HTTP://SUDAN.CSES.VT.EDU/HTML/TURF/TURF/PUBLICATIONS/PUBLICATIONS2.HTML

2 - USE SEASONAL NURSE CROPS IN ACCORDANCE WITH SEEDING DATES STATED BELOW:

FEBRUARY, MARCH-APRIL................................. ANNUAL RYE

MAY 1ST-AUGUST................................................ FOXTAIL MILLET

SEPTEMBER, OCTOBER-NOVEMBER 15TH...... ANNUAL RYE

NOVEMBER 16TH- JANUARY.............................. WINTER RYE

3 - MAY THROUGH OCTOBER, USE HULLED SEED. ALL OTHER SEEDING PERIODS, USE UNHULLED SEED. IF WEEPING LOVEGRASS IS USED, INCLUDE IN ANY SLOPE OR LOW MAINTENANCE MIXTURE DURING WARMER SEEDING PERIODS, INCREASE TO 30-40 LBS/ACRE.

FERTILIZER & LIME

APPLY 10-20-10 FERTILIZER AT A RATE OF 500 LBS/ACRE (OR 12 LBS/1,000 SQ. FT.)

APPLY PULVERIZED AGRICULTURAL LIMESTONE AT A RATE OF 2 TONS/ACRE (OR 90 LBS/1,000 SQ. FT.)

NOTE:

1. A SOIL TEST IS NECESSARY TO DETERMINE THE ACTUAL AMOUNT OF LIME REQUIRED TO ADJUST THE SOIL PH OF SITE.

2. INCORPORATE THE LIME AND FERTILIZER INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR BY OTHER MEANS.

3. WHEN APPLYING SLOWLY AVAILABLE NITROGEN, USE RATES AVAILABLE IN EROSION & SEDIMENT CONTROL TECHNICAL

BULLETIN #4, 2003 NUTRIENT MANAGEMENT FOR DEVELOPMENT SITES AT

HTTP://WWW.DCR.STATE.VA.US/SW/E&S.HTM#PUBS

TABLE 3.32-E

(REVISED JUNE 2003)

PERMANENT SEEDING SPECIFICATION FOR COASTAL PLAIN AREA

FERTILIZER AND LIME

APPLY 10-10-10 FERTILIZER AT A RATE OF 450 LBS./ACRE (OR 10 LBS./1,000 SQ. FT.)

APPLY PULVERIZED AGRICULTURAL LIMESTONE AT A RATE OF 2 TONS/ACRE (OR 90 LBS./1,000 SQ. FT.)

NOTE:

1. A SOIL TEST IS NECESSARY TO DETERMINE THE ACTUAL AMOUNT OF LIME REQUIRED TO ADJUST THE SOIL PH OF SITE.

2. INCORPORATE THE LIME AND FERTILIZER INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR BY OTHER MEANS.

3. WHEN APPLYING SLOWLY AVAILABLE NITROGEN, USE RATES AVAILABLE IN EROSION & SEDIMENT CONTROL TECHNICAL

BULLETIN #4, 2003 NUTRIENT MANAGEMENT FOR DEVELOPMENT SITES AT

HTTP://WWW.DCR.STATE.VA.US/SW/E&S.HTM#PUBS

TO

File details come from the government source that posted it. Updated .