Attachment_1_-_Statement_of_Work_-_31_Jul_17.pdf

PDF 14 KB Posted

Attached to
Maintain Runway 8 and 26 Clear Zone Drainage Federal contract opportunity
Solicitation number
FA4800-17-B-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 1 - Statement of Work

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

MUHJ 09-4149

PROJECT MUHJ 09-4149

Maintain Runway 08 and 26 Clear Zone Drainage-Design

AT

JBLE-LANGLEY

1. DESCRIPTION OF WORK:

1.1 General Scope: Furnish all plant, labor, equipment, materials, tools, and perform all opera-tions necessary to eliminate flooding in two clear zone areas, End of Runway 08 and 26. All work shall be in accordance with design contract documents.

The Clear Zones grading and drainage project will eliminate all existing open ditches within the clear zones. The entire area will be regraded to create definitive ridgelines directing sur-face runoff overland to a series of shallow earth swales with a minimum 1% slope. These swales will then direct the storm water into numerous new drainage inlet structures, to cut down on the overland travel distance and minimize the potential for standing water. The inlets will be connected to a new underground storm sewer-piping network, which will con-vey the storm water outside the boundaries of the Clear Zones to connect with downstream drainage facilities.

2. PROGRAM MANAGEMENT: The contractor shall sequence his work to ensure progress efficient for airfield operations. Wetlands and Environmental Restoration Program (ERP) landfill are impacted by this project. The Government will provide the wetland permit. The Contractor shall be responsible for paying the wetland mitigation fee.

2.1 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK:

No variance.

2.2 SUBCONTRACTORS:

No variance.

2.3 QUALITY CONTROL PLAN:

No variance.

3. RESPONSE REQUIREMENT:

No variance.

4. DESIGN DOCUMENTS, GENERAL:

No variance.

4.1 DRAWINGS:

No variance.

4.2 RENDERED PERSPECTIVE:

No variance.

MUHJ 09-4149

4.3 SPECIFICATIONS:

No variance.

4.4 CONSTRUCTION COST ESTIMATE BREAKDOWN:

No variance.

4.5 PREPARATION OF AF FORM 66, Schedule of Material Submittals:

No variance.

4.6 BID SCHEDULE:

No variance.

4.7 DESIGN ANALYSIS:

No variance.

4.8 COMMUNICATIONS:

NA

4.9 ENERGY MONITORING AND CONTROL SYSTEM (EMCS):

NA

4.10 LOCKSETS:

NA

4.11 GEODETIC CONTROL SURVEYS:

No variance.

5. CONTRACT OPERATIONS:

No variance.

5.1 WORK HOURS:

According to approved schedule request.

5.2 ORDER OF WORK:

No variance.

5.3 APPLICABLE CODES AND REGULATIONS:

No variance.

6. GOVERNMENT POINT OF CONTACTS:

633 CES Inspector – Kevin Armstrong, 764-0172.