Attachment 1 - Bid Schedule 12-B-0003.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- Base Wide Paving IDIQ Federal contract opportunity
- Solicitation number
- FA4690-12-B-0003
About this file
Attachment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Bid Schedule 12-B-0003 Revised 11 Jul 12.xlsx | XLSX spreadsheet | |
| Amendment 2 Responses to Questions.pdf | ||
| Amendment 2 Attachment 6 - Responses to Questions.pdf | ||
| Amendment 1 Site Visit Minutes.doc.pdf | ||
| Attachment 1 - Bid Schedule 12-B-0003 Revised 3 Jul 12.xlsx | XLSX spreadsheet | |
| Amendment 1 Attachment 5 - Site Visit Minutes.pdf | ||
| Attachment 4 Determination of Responsibility.pdf | ||
| FA4690-12-B-0003 Solicitation.pdf | ||
| Attachment 3 - Wage Determination 12-B-0003.pdf | ||
| Attachment 2 - Specifications 12-B-0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule - Summary Contract Period Amount $
| Base Year Pricing | $ - 0 |
| Option YR 1 - Pricing | $ - 0 |
| Option YR 2 - Pricing | $ - 0 |
| Option YR 3 - Pricing | $ - 0 |
| Option YR 4 - Pricing | $ - 0 |
GRAND TOTAL: $ - 0
&"-,Bold"&14Bid Schedule Base Wide Paving &"-,Bold"&12Solicitation No. FA4690-12-B-0003 Attachment 1
Tab: &A File: &F Page : &P of &N
Bid Schedule - Base Yr
| Base Year Pricing | |||||
| CLIN | Description | Est. Qty | Unit | Unit Price | Clin Total |
| 1 | Excavate Confined Areas | CY | $ - 0 | ||
| 2 | Excavate General Areas | CY | $ - 0 | ||
| 3 | Fill and Compact | CY | $ - 0 | ||
| 4 | Finish Grade and Compact | SY | $ - 0 | ||
| 5 | Construct Aggregate Base Course | TN | $ - 0 | ||
| 6 | Place Topsoil | CY | $ - 0 | ||
| 7 | Seed | LB | $ - 0 | ||
| 8 | Fertilize | LB | $ - 0 | ||
| 9 | Mulch | LB | $ - 0 | ||
| 10 | Install Silt Fence | LF | $ - 0 | ||
| 11 | Construct 4" Asphalt Patch | SF | $ - 0 | ||
| 12 | Sawcut 4" Asphalt | LF | $ - 0 | ||
| 13 | Construct 6" Asphalt Patch | SF | $ - 0 | ||
| 14 | Sawcut 6" Asphalt | LF | $ - 0 | ||
| 15 | Repair PCC spalls 0 to 100 SF, 4" | SF | $ - 0 | ||
| 16 | Repair PCC spalls Over 100 SF, 4" | SF | $ - 0 | ||
| 17 | Repair PCC spalls 0 to 100 SF, 6" | SF | $ - 0 | ||
| 18 | Repair PCC spalls 100 SF, 6" | SF | $ - 0 | ||
| 19 | Salvage Asphalt Pavement | CY | $ - 0 | ||
| 20 | Mill Asphalt Pavement | SY | $ - 0 | ||
| 21 | Apply Asphalt Rejuvenator | GAL | $ - 0 | ||
| 22 | Apply Asphalt Seal Coat | GAL | $ - 0 | ||
| 23 | Apply Asphalt Tack Coat | SY | $ - 0 | ||
| 24 | Construct Asphalt Leveling Course | TON | $ - 0 | ||
| 25 | Construct G-1 Asphalt Pavement | TON | $ - 0 | ||
| 26 | Construct G-2 Asphalt Pavement | TON | $ - 0 | ||
| 27 | Adjust Manhole Grade | EA | $ - 0 | ||
| 28 | Adjust Valve Box Grade | EA | $ - 0 | ||
| 29 | Remove 4" PCC Sidewalk | SF | $ - 0 | ||
| 30 | Remove 6" PCC Pavement | SF | $ - 0 | ||
| 31 | Remove 8" PCC Pavement | SF | $ - 0 | ||
| 32 | Remove 12" PCC Pavement | SF | $ - 0 | ||
| 33 | Remove 20-22" PCC Pavement | SF | $ - 0 | ||
| 34 | Remove PCC Curb & Gutter | LF | $ - 0 | ||
| 35 | Remove PCC Fillet Section and Pan Gutter | SF | $ - 0 | ||
| 36 | Remove Additional PCC Pavement | CY | $ - 0 | ||
| 37 | Sawcut 4" PCC Sidewalk | LF | $ - 0 | ||
| 38 | Sawcut 6" PCC Pavement | LF | $ - 0 | ||
| 39 | Sawcut 8" PCC Pavement | LF | $ - 0 | ||
| 40 | Sawcut 12" PCC Pavement | LF | $ - 0 | ||
| 41 | Sawcut 20-22" PCC Pavement | SF | $ - 0 | ||
| 42 | Construct 4" Nonreinforced PCC Sidewalk | SF | $ - 0 | ||
| 43 | Construct 6" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 44 | Construct 8" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 45 | Construct 12" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 46 | Construct 20-22" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 47 | Construct PCC Curb & Gutter 6"x32" | LF | $ - 0 | ||
| 48 | Construct PCC Fillet Section and Pan Gutter 6" | SF | $ - 0 | ||
| 49 | Construct Additional Nonreinforced PCC Pavement | CY | $ - 0 | ||
| 50 | Drill/Install Dowel Bars in PCC Pavement | LF | $ - 0 | ||
| 51 | Install Reinforcing Steel in PCC Pavement | LB | $ - 0 | ||
| 52 | Install Jet Fuel Resistant PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 53 | Install Silicon PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 54 | Install Asphalt Pavement Joint & Crack Sealant | LB | $ - 0 | ||
| 55 | Apply Pavement Marking 4" | LF | $ - 0 | ||
| 56 | Apply Pavement Marking 6" | LF | $ - 0 | ||
| 57 | Apply Pavement Marking other | SF | $ - 0 | ||
| 58 | Add Glass Beads for Pavement Marking | SF | $ - 0 | ||
| 59 | Remove Pavement Markings | SF | $ - 0 |
GRAND TOTAL: $ - 0
Base Wide Paving &"-,Bold"&12Solicitation No. FA4690-12-B-0003 Attachment 1&"-,Regular"&11
File: &F Page: &P of &N
Bid Schedule - Opt Yr 1
| Option YR 1 - Pricing | |||||
| CLIN | Description | Est. Qty | Unit | Unit Price | Clin Total |
| 1 | Excavate Confined Areas | CY | $ - 0 | ||
| 2 | Excavate General Areas | CY | $ - 0 | ||
| 3 | Fill and Compact | CY | $ - 0 | ||
| 4 | Finish Grade and Compact | SY | $ - 0 | ||
| 5 | Construct Aggregate Base Course | TN | $ - 0 | ||
| 6 | Place Topsoil | CY | $ - 0 | ||
| 7 | Seed | LB | $ - 0 | ||
| 8 | Fertilize | LB | $ - 0 | ||
| 9 | Mulch | LB | $ - 0 | ||
| 10 | Install Silt Fence | LF | $ - 0 | ||
| 11 | Construct 4" Asphalt Patch | SF | $ - 0 | ||
| 12 | Sawcut 4" Asphalt | LF | $ - 0 | ||
| 13 | Construct 6" Asphalt Patch | SF | $ - 0 | ||
| 14 | Sawcut 6" Asphalt | LF | $ - 0 | ||
| 15 | Repair PCC spalls 0 to 100 SF, 4" | SF | $ - 0 | ||
| 16 | Repair PCC spalls Over 100 SF, 4" | SF | $ - 0 | ||
| 17 | Repair PCC spalls 0 to 100 SF, 6" | SF | $ - 0 | ||
| 18 | Repair PCC spalls 100 SF, 6" | SF | $ - 0 | ||
| 19 | Salvage Asphalt Pavement | CY | $ - 0 | ||
| 20 | Mill Asphalt Pavement | SY | $ - 0 | ||
| 21 | Apply Asphalt Rejuvenator | GAL | $ - 0 | ||
| 22 | Apply Asphalt Seal Coat | GAL | $ - 0 | ||
| 23 | Apply Asphalt Tack Coat | SY | $ - 0 | ||
| 24 | Construct Asphalt Leveling Course | TON | $ - 0 | ||
| 25 | Construct G-1 Asphalt Pavement | TON | $ - 0 | ||
| 26 | Construct G-2 Asphalt Pavement | TON | $ - 0 | ||
| 27 | Adjust Manhole Grade | EA | $ - 0 | ||
| 28 | Adjust Valve Box Grade | EA | $ - 0 | ||
| 29 | Remove 4" PCC Sidewalk | SF | $ - 0 | ||
| 30 | Remove 6" PCC Pavement | SF | $ - 0 | ||
| 31 | Remove 8" PCC Pavement | SF | $ - 0 | ||
| 32 | Remove 12" PCC Pavement | SF | $ - 0 | ||
| 33 | Remove 20-22" PCC Pavement | SF | $ - 0 | ||
| 34 | Remove PCC Curb & Gutter | LF | $ - 0 | ||
| 35 | Remove PCC Fillet Section and Pan Gutter | SF | $ - 0 | ||
| 36 | Remove Additional PCC Pavement | CY | $ - 0 | ||
| 37 | Sawcut 4" PCC Sidewalk | LF | $ - 0 | ||
| 38 | Sawcut 6" PCC Pavement | LF | $ - 0 | ||
| 39 | Sawcut 8" PCC Pavement | LF | $ - 0 | ||
| 40 | Sawcut 12" PCC Pavement | LF | $ - 0 | ||
| 41 | Sawcut 20-22" PCC Pavement | SF | $ - 0 | ||
| 42 | Construct 4" Nonreinforced PCC Sidewalk | SF | $ - 0 | ||
| 43 | Construct 6" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 44 | Construct 8" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 45 | Construct 12" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 46 | Construct 20-22" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 47 | Construct PCC Curb & Gutter 6"x32" | LF | $ - 0 | ||
| 48 | Construct PCC Fillet Section and Pan Gutter 6" | SF | $ - 0 | ||
| 49 | Construct Additional Nonreinforced PCC Pavement | CY | $ - 0 | ||
| 50 | Drill/Install Dowel Bars in PCC Pavement | LF | $ - 0 | ||
| 51 | Install Reinforcing Steel in PCC Pavement | LB | $ - 0 | ||
| 52 | Install Jet Fuel Resistant PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 53 | Install Silicon PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 54 | Install Asphalt Pavement Joint & Crack Sealant | LB | $ - 0 | ||
| 55 | Apply Pavement Marking 4" | LF | $ - 0 | ||
| 56 | Apply Pavement Marking 6" | LF | $ - 0 | ||
| 57 | Apply Pavement Marking other | SF | $ - 0 | ||
| 58 | Add Glass Beads for Pavement Marking | SF | $ - 0 | ||
| 59 | Remove Pavement Markings | SF | $ - 0 |
GRAND TOTAL: $ - 0
Base Wide Paving &"-,Bold"&12Solicitation No. FA4690-12-B-0003
File: &F Page: &P of &N
Bid Schedule - Opt Yr 2
| Option YR 2 - Pricing | |||||
| CLIN | Description | Est. Qty | Unit | Unit Price | Clin Total |
| 1 | Excavate Confined Areas | CY | $ - 0 | ||
| 2 | Excavate General Areas | CY | $ - 0 | ||
| 3 | Fill and Compact | CY | $ - 0 | ||
| 4 | Finish Grade and Compact | SY | $ - 0 | ||
| 5 | Construct Aggregate Base Course | TN | $ - 0 | ||
| 6 | Place Topsoil | CY | $ - 0 | ||
| 7 | Seed | LB | $ - 0 | ||
| 8 | Fertilize | LB | $ - 0 | ||
| 9 | Mulch | LB | $ - 0 | ||
| 10 | Install Silt Fence | LF | $ - 0 | ||
| 11 | Construct 4" Asphalt Patch | SF | $ - 0 | ||
| 12 | Sawcut 4" Asphalt | LF | $ - 0 | ||
| 13 | Construct 6" Asphalt Patch | SF | $ - 0 | ||
| 14 | Sawcut 6" Asphalt | LF | $ - 0 | ||
| 15 | Repair PCC spalls 0 to 100 SF, 4" | SF | $ - 0 | ||
| 16 | Repair PCC spalls Over 100 SF, 4" | SF | $ - 0 | ||
| 17 | Repair PCC spalls 0 to 100 SF, 6" | SF | $ - 0 | ||
| 18 | Repair PCC spalls 100 SF, 6" | SF | $ - 0 | ||
| 19 | Salvage Asphalt Pavement | CY | $ - 0 | ||
| 20 | Mill Asphalt Pavement | SY | $ - 0 | ||
| 21 | Apply Asphalt Rejuvenator | GAL | $ - 0 | ||
| 22 | Apply Asphalt Seal Coat | GAL | $ - 0 | ||
| 23 | Apply Asphalt Tack Coat | SY | $ - 0 | ||
| 24 | Construct Asphalt Leveling Course | TON | $ - 0 | ||
| 25 | Construct G-1 Asphalt Pavement | TON | $ - 0 | ||
| 26 | Construct G-2 Asphalt Pavement | TON | $ - 0 | ||
| 27 | Adjust Manhole Grade | EA | $ - 0 | ||
| 28 | Adjust Valve Box Grade | EA | $ - 0 | ||
| 29 | Remove 4" PCC Sidewalk | SF | $ - 0 | ||
| 30 | Remove 6" PCC Pavement | SF | $ - 0 | ||
| 31 | Remove 8" PCC Pavement | SF | $ - 0 | ||
| 32 | Remove 12" PCC Pavement | SF | $ - 0 | ||
| 33 | Remove 20-22" PCC Pavement | SF | $ - 0 | ||
| 34 | Remove PCC Curb & Gutter | LF | $ - 0 | ||
| 35 | Remove PCC Fillet Section and Pan Gutter | SF | $ - 0 | ||
| 36 | Remove Additional PCC Pavement | CY | $ - 0 | ||
| 37 | Sawcut 4" PCC Sidewalk | LF | $ - 0 | ||
| 38 | Sawcut 6" PCC Pavement | LF | $ - 0 | ||
| 39 | Sawcut 8" PCC Pavement | LF | $ - 0 | ||
| 40 | Sawcut 12" PCC Pavement | LF | $ - 0 | ||
| 41 | Sawcut 20-22" PCC Pavement | SF | $ - 0 | ||
| 42 | Construct 4" Nonreinforced PCC Sidewalk | SF | $ - 0 | ||
| 43 | Construct 6" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 44 | Construct 8" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 45 | Construct 12" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 46 | Construct 20-22" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 47 | Construct PCC Curb & Gutter 6"x32" | LF | $ - 0 | ||
| 48 | Construct PCC Fillet Section and Pan Gutter 6" | SF | $ - 0 | ||
| 49 | Construct Additional Nonreinforced PCC Pavement | CY | $ - 0 | ||
| 50 | Drill/Install Dowel Bars in PCC Pavement | LF | $ - 0 | ||
| 51 | Install Reinforcing Steel in PCC Pavement | LB | $ - 0 | ||
| 52 | Install Jet Fuel Resistant PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 53 | Install Silicon PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 54 | Install Asphalt Pavement Joint & Crack Sealant | LB | $ - 0 | ||
| 55 | Apply Pavement Marking 4" | LF | $ - 0 | ||
| 56 | Apply Pavement Marking 6" | LF | $ - 0 | ||
| 57 | Apply Pavement Marking other | SF | $ - 0 | ||
| 58 | Add Glass Beads for Pavement Marking | SF | $ - 0 | ||
| 59 | Remove Pavement Markings | SF | $ - 0 |
GRAND TOTAL: $ - 0
Base Wide Paving &"-,Bold"&12Solicitation No. FA4690-12-B-0003
File: &F Page: &P of &N
Bid Schedule - Opt Yr 3
| Option YR 3 - Pricing | |||||
| CLIN | Description | Est. Qty | Unit | Unit Price | Clin Total |
| 1 | Excavate Confined Areas | CY | $ - 0 | ||
| 2 | Excavate General Areas | CY | $ - 0 | ||
| 3 | Fill and Compact | CY | $ - 0 | ||
| 4 | Finish Grade and Compact | SY | $ - 0 | ||
| 5 | Construct Aggregate Base Course | TN | $ - 0 | ||
| 6 | Place Topsoil | CY | $ - 0 | ||
| 7 | Seed | LB | $ - 0 | ||
| 8 | Fertilize | LB | $ - 0 | ||
| 9 | Mulch | LB | $ - 0 | ||
| 10 | Install Silt Fence | LF | $ - 0 | ||
| 11 | Construct 4" Asphalt Patch | SF | $ - 0 | ||
| 12 | Sawcut 4" Asphalt | LF | $ - 0 | ||
| 13 | Construct 6" Asphalt Patch | SF | $ - 0 | ||
| 14 | Sawcut 6" Asphalt | LF | $ - 0 | ||
| 15 | Repair PCC spalls 0 to 100 SF, 4" | SF | $ - 0 | ||
| 16 | Repair PCC spalls Over 100 SF, 4" | SF | $ - 0 | ||
| 17 | Repair PCC spalls 0 to 100 SF, 6" | SF | $ - 0 | ||
| 18 | Repair PCC spalls 100 SF, 6" | SF | $ - 0 | ||
| 19 | Salvage Asphalt Pavement | CY | $ - 0 | ||
| 20 | Mill Asphalt Pavement | SY | $ - 0 | ||
| 21 | Apply Asphalt Rejuvenator | GAL | $ - 0 | ||
| 22 | Apply Asphalt Seal Coat | GAL | $ - 0 | ||
| 23 | Apply Asphalt Tack Coat | SY | $ - 0 | ||
| 24 | Construct Asphalt Leveling Course | TON | $ - 0 | ||
| 25 | Construct G-1 Asphalt Pavement | TON | $ - 0 | ||
| 26 | Construct G-2 Asphalt Pavement | TON | $ - 0 | ||
| 27 | Adjust Manhole Grade | EA | $ - 0 | ||
| 28 | Adjust Valve Box Grade | EA | $ - 0 | ||
| 29 | Remove 4" PCC Sidewalk | SF | $ - 0 | ||
| 30 | Remove 6" PCC Pavement | SF | $ - 0 | ||
| 31 | Remove 8" PCC Pavement | SF | $ - 0 | ||
| 32 | Remove 12" PCC Pavement | SF | $ - 0 | ||
| 33 | Remove 20-22" PCC Pavement | SF | $ - 0 | ||
| 34 | Remove PCC Curb & Gutter | LF | $ - 0 | ||
| 35 | Remove PCC Fillet Section and Pan Gutter | SF | $ - 0 | ||
| 36 | Remove Additional PCC Pavement | CY | $ - 0 | ||
| 37 | Sawcut 4" PCC Sidewalk | LF | $ - 0 | ||
| 38 | Sawcut 6" PCC Pavement | LF | $ - 0 | ||
| 39 | Sawcut 8" PCC Pavement | LF | $ - 0 | ||
| 40 | Sawcut 12" PCC Pavement | LF | $ - 0 | ||
| 41 | Sawcut 20-22" PCC Pavement | SF | $ - 0 | ||
| 42 | Construct 4" Nonreinforced PCC Sidewalk | SF | $ - 0 | ||
| 43 | Construct 6" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 44 | Construct 8" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 45 | Construct 12" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 46 | Construct 20-22" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 47 | Construct PCC Curb & Gutter 6"x32" | LF | $ - 0 | ||
| 48 | Construct PCC Fillet Section and Pan Gutter 6" | SF | $ - 0 | ||
| 49 | Construct Additional Nonreinforced PCC Pavement | CY | $ - 0 | ||
| 50 | Drill/Install Dowel Bars in PCC Pavement | LF | $ - 0 | ||
| 51 | Install Reinforcing Steel in PCC Pavement | LB | $ - 0 | ||
| 52 | Install Jet Fuel Resistant PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 53 | Install Silicon PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 54 | Install Asphalt Pavement Joint & Crack Sealant | LB | $ - 0 | ||
| 55 | Apply Pavement Marking 4" | LF | $ - 0 | ||
| 56 | Apply Pavement Marking 6" | LF | $ - 0 | ||
| 57 | Apply Pavement Marking other | SF | $ - 0 | ||
| 58 | Add Glass Beads for Pavement Marking | SF | $ - 0 | ||
| 59 | Remove Pavement Markings | SF | $ - 0 |
GRAND TOTAL: $ - 0
Base Wide Paving &"-,Bold"&12Solicitation No. FA4690-12-B-0003
File: &F Page: &P of &N
Bid Schedule - Opt Yr 4
| Option YR 4 - Pricing | |||||
| CLIN | Description | Est. Qty | Unit | Unit Price | Clin Total |
| 1 | Excavate Confined Areas | CY | $ - 0 | ||
| 2 | Excavate General Areas | CY | $ - 0 | ||
| 3 | Fill and Compact | CY | $ - 0 | ||
| 4 | Finish Grade and Compact | SY | $ - 0 | ||
| 5 | Construct Aggregate Base Course | TN | $ - 0 | ||
| 6 | Place Topsoil | CY | $ - 0 | ||
| 7 | Seed | LB | $ - 0 | ||
| 8 | Fertilize | LB | $ - 0 | ||
| 9 | Mulch | LB | $ - 0 | ||
| 10 | Install Silt Fence | LF | $ - 0 | ||
| 11 | Construct 4" Asphalt Patch | SF | $ - 0 | ||
| 12 | Sawcut 4" Asphalt | LF | $ - 0 | ||
| 13 | Construct 6" Asphalt Patch | SF | $ - 0 | ||
| 14 | Sawcut 6" Asphalt | LF | $ - 0 | ||
| 15 | Repair PCC spalls 0 to 100 SF, 4" | SF | $ - 0 | ||
| 16 | Repair PCC spalls Over 100 SF, 4" | SF | $ - 0 | ||
| 17 | Repair PCC spalls 0 to 100 SF, 6" | SF | $ - 0 | ||
| 18 | Repair PCC spalls 100 SF, 6" | SF | $ - 0 | ||
| 19 | Salvage Asphalt Pavement | CY | $ - 0 | ||
| 20 | Mill Asphalt Pavement | SY | $ - 0 | ||
| 21 | Apply Asphalt Rejuvenator | GAL | $ - 0 | ||
| 22 | Apply Asphalt Seal Coat | GAL | $ - 0 | ||
| 23 | Apply Asphalt Tack Coat | SY | $ - 0 | ||
| 24 | Construct Asphalt Leveling Course | TON | $ - 0 | ||
| 25 | Construct G-1 Asphalt Pavement | TON | $ - 0 | ||
| 26 | Construct G-2 Asphalt Pavement | TON | $ - 0 | ||
| 27 | Adjust Manhole Grade | EA | $ - 0 | ||
| 28 | Adjust Valve Box Grade | EA | $ - 0 | ||
| 29 | Remove 4" PCC Sidewalk | SF | $ - 0 | ||
| 30 | Remove 6" PCC Pavement | SF | $ - 0 | ||
| 31 | Remove 8" PCC Pavement | SF | $ - 0 | ||
| 32 | Remove 12" PCC Pavement | SF | $ - 0 | ||
| 33 | Remove 20-22" PCC Pavement | SF | $ - 0 | ||
| 34 | Remove PCC Curb & Gutter | LF | $ - 0 | ||
| 35 | Remove PCC Fillet Section and Pan Gutter | SF | $ - 0 | ||
| 36 | Remove Additional PCC Pavement | CY | $ - 0 | ||
| 37 | Sawcut 4" PCC Sidewalk | LF | $ - 0 | ||
| 38 | Sawcut 6" PCC Pavement | LF | $ - 0 | ||
| 39 | Sawcut 8" PCC Pavement | LF | $ - 0 | ||
| 40 | Sawcut 12" PCC Pavement | LF | $ - 0 | ||
| 41 | Sawcut 20-22" PCC Pavement | SF | $ - 0 | ||
| 42 | Construct 4" Nonreinforced PCC Sidewalk | SF | $ - 0 | ||
| 43 | Construct 6" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 44 | Construct 8" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 45 | Construct 12" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 46 | Construct 20-22" Nonreinforced PCC Pavement | SF | $ - 0 | ||
| 47 | Construct PCC Curb & Gutter 6"x32" | LF | $ - 0 | ||
| 48 | Construct PCC Fillet Section and Pan Gutter 6" | SF | $ - 0 | ||
| 49 | Construct Additional Nonreinforced PCC Pavement | CY | $ - 0 | ||
| 50 | Drill/Install Dowel Bars in PCC Pavement | LF | $ - 0 | ||
| 51 | Install Reinforcing Steel in PCC Pavement | LB | $ - 0 | ||
| 52 | Install Jet Fuel Resistant PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 53 | Install Silicon PCC Joint & Crack Sealant | LF | $ - 0 | ||
| 54 | Install Asphalt Pavement Joint & Crack Sealant | LB | $ - 0 | ||
| 55 | Apply Pavement Marking 4" | LF | $ - 0 | ||
| 56 | Apply Pavement Marking 6" | LF | $ - 0 | ||
| 57 | Apply Pavement Marking other | SF | $ - 0 | ||
| 58 | Add Glass Beads for Pavement Marking | SF | $ - 0 | ||
| 59 | Remove Pavement Markings | SF | $ - 0 |
GRAND TOTAL: $ - 0