Performance Work Statement

69 KB Posted

Attached to
Washers and Dryers Lease Federal contract opportunity
Solicitation number
FA4690-08-R-0023
Issued by
Department of the Air Force Air Combat Command

About this file

Performance Work Statement

Text of this file

FA4690-08-R-0023

Attachment 2

PERFORMANCE WORK STATEMENT

(21 July 2008)

1. Scope of Work: The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to furnish, install, and maintain contractor owned washers and dryers as defined in this specification. The work to be performed consists of installing contractor-furnished washers and dryers and providing continuous machine performance at maximum efficiency.

2. Contractor Furnished Items:

a) Washing Machines, Electric, shall be white, commercial, heavy-duty type, with standard cold and hot water connections, and have a minimum capacity 3 cubic ft. Washer’s shall be 2004 model year or newer. Washers shall have three (3) wash cycles (normal, permanent press, and delicate fabrics) and three (3) water temperature selections (cold, warm, and hot). Washers shall be capable of operating on all of the aforementioned cycles while on a 120 volt AC, 20 AMP circuit without overloading the circuit.

b) Dryers, Electric, shall be white, commercial, heavy-duty type with a minimum capacity of 7 cubic ft. and have three (3) heat ranges (normal, delicate, and no heat air dry). Dryers shall be 2004 model year or newer and approximately 70 dryers need to be stackable units. Dryers must contain a drying time indicator that can be selected to indicate the drying period for the desired fabric. Dryers must be shock proof and contain a safety start button plus a safety latch to shut off the dryer when the door is open. All dryers must be capable of operating on a 220 volt, 30 AMP circuit without overloading the circuit.

c) Locations, Types, Initial Quantities: See Appendix 1

d) Additions, Deletions, and Relocations: Facility changes and fluctuations in base populace may necessitate increases, decreases, or relocation of initial equipment. Additions and deletions in the number of washers and dryers are based on the prices established in the price schedule. Relocations are a separate line item on the price schedule.

3. Continued Use of Facilities: During the installation and maintenance of equipment under this contract, buildings will continue to be occupied. Work shall be performed in an orderly manner with minimum disturbance and inconvenience to the occupants. Contractor personnel shall be limited to those areas required in performing the work.

4. Quality of Contractor Furnished Equipment:

a) The initial requirement quantities of machines are listed in Appendix 1. The contractor shall provide all necessary equipment required for performing the contract. Only equipment in good operating condition and without major surface defects shall be furnished. All equipment shall be inspected and accepted by the Contracting Officer or the Furnishings Management Officer (FMO) prior to installation.

b) All equipment shall meet specifications established by the U.S. Public Health Federation and National Sanitation Foundation and/or military authority having jurisdiction and is subject to inspection by installation medical authority and fire prevention authority.

5. Security Requirements:

a) Listing Of Employees. The contractor shall maintain a current listing of employees. The list shall include the employee’s name and security number. An updated listing shall be provided when an employee’s status or information changes.

b) Pass And Identification Items. The contractor shall ensure the pass and identification items required for contract performance are obtained for employees and non-government owned vehicles.

c) Retrieving Identification Media. The contractor shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires; e.g. terminated for cause, retirement, etc.

d) Traffic Laws. The contractor and its employees shall comply with base traffic regulations.

e) Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on Ellsworth Air Force Base.

6. Installation: The contractor shall be responsible for connecting the washers and dryers to the existing plumbing, electrical outlets, and vents. All equipment is to be installed in accordance with manufacturer’s installation instructions or specifications. Any deviations shall require the approval of the Contracting Officer or his designee.

7. Facility Maintenance, Fire Prevention, Security, Sanitation, and Safety: The Air Force shall provide. Repair, and maintain the premises where each contractor owned appliance is installed. Electrical outlets, plumbing, and dryer vents required for installation of appliances will be provided and maintained by the government. All dryers shall be properly vented. No alterations to government premises shall be made by the contractor.

8. Personnel:

a) Contractor personnel shall present a neat appearance and be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the company name and employee’s name. Contractor personnel shall be required to read, write, speak, and understand English.

b) The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest nor shall the contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval in accordance with DOD Regulation 5500.7R.

c) The contractor is cautioned that off duty active military personnel hired under the contract may be subject to permanent change of station, change in duty hours or deployment. Military reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor’s ability to perform. This shall not constitute an excuse for non-performance under this contract.

9. Service Calls and Service:

a) The Furnishings Management Office (FMO), Billeting Officer, Dorm Managers, or the Contracting Officer, via telephone, will give routine service calls to the contractor. Routine service calls shall be completed within forty-eight (48) hours of notice.

b) The Furnishings Management Office, Billeting Officer, Dorm Managers, or the Contracting Officer, via telephone, will give emergency service calls to the contractor. When emergency service is required, the contractor shall perform needed maintenance and repairs within twenty-four (24) hours of notice of machine malfunction.

c) Routine maintenance and repairs shall be accomplished, on-site, during normal duty hours, 0700-1600 hours Monday-Friday.

d) The contractor shall perform preventive maintenance at least monthly and maintain a preventative maintenance log.

e) The contractor shall provide additional or substitute equipment, if necessary, in the event of a breakdown or equipment malfunction at no additional cost to the government. If equipment “Operating Instructions” is not printed on the washers and dryers, a mechanically or professionally printed sign or signs shall be prominently displayed in view of the customers. The Contracting Officer or his representative must approve all signs used in the performance of this contract.

f) Recognized holidays: The contractor is not required to provide service in the following Federal Holidays:

New Years Day Martin Luther King Day George Washington’s Birthday

Memorial Day Independence Day

Labor Day

Columbus Day Veterans Day

Thanksgiving Day

Christmas Day

g) The contractor shall repair, at his/her expense, any damage to government property resulting from the movement of washers and dryers into and out of any building. These repairs shall be made by a craftsman of the particular trade required to return the damage to original condition.

10. Control: A control number shall be assigned to each machine by the building custodian. The control number will be affixed to the equipment. The control number will be given to the contractor.

11. Availability of Utilities: All reasonable quantities of hot and cold water, electricity, and use of drains for waste water discharge will be made available to the contractor without charge.

12. Emergency Disconnections: The Air Force retains the right to disconnect utilities from any machine to protect the machine or government property. The Civil Engineering crew will accomplish any such action. The government will make every reasonable attempt to notify the contractor at the earliest opportunity.

13. Phase-In/Phase-Out Procedures:

a) The contractor shall advise the Contracting Officer, in writing, of its proposed installation schedule within fifteen (15) calendar days after the receipt of contract award. The contractor shall make every effort to comply with the schedule and shall coordinate phase-in/phase-out procedures with the incumbent contractor as directed by the Contracting Officer.

b) As space becomes available in the various buildings, the contractor may deliver washers and dryers, but shall not place them into operation until coordinated with the Contracting Officer or the FMO. Warehouse space for storage and repair of appliances or repair parts is not available from the Air Force.

c) Payment during the phase-in period shall be computed on the basis of 1/30th of the monthly rental for each day each machine is installed and operational.

d) The initial quantities of appliances required under this contract shall be installed and operational within five (5) workdays from the contract start date. In the event of delay of installation due to unavailability of the locations, any extension of time required for installation must be coordinated with and authorized by the Contracting Officer.

14. Government Quality Assurance: The Contracting Officer or designated representative will monitor the contractor’s compliance with the Statement of Work. Monitoring will be accomplished by direct surveillance and by the use of Customer Complaint Record, AF 714.

15. Preventative Maintenance: The contractor shall submit a copy of his/her preventative maintenance program to the Contracting Officer for approval prior to the commencement of work.

Appendix 1

Locations, Types, and Initial Quantities

LOCATION
WASHER
DRYER
Bldg 1103, Pine Tree Inn
6 EA
6 EA
Bldg 3706, Washington Dorm
14 EA
7 EA*
Bldg 3603, Lincoln Dorm
14 EA
7 EA*
Bldg 2305, Rushmore Dorm
14 EA
7 EA*
Bldg 2204, Borglum Dorm
14 EA
7 EA*
Bldg 4207, Jefferson Dorm
14 EA
7 EA*
Bldg 7430, Airman Leadership School
2 EA
2 EA
Bldg 8008, Aspen Inn, Temporary Lodging
5 EA
5 EA
Bldg 5907, Cedar Inn, VOQ
4 EA
4 EA
TOTAL
87
87

*Stacking Dryers (7 Stacks equals 14 dryers)

PAGE

Other files for this federal contract opportunity

Other files attached to Washers and Dryers Lease, newest first.
File Type Posted
Solicitation Ammendment —
Washer-Dryer Price Schedule —
Solicitation Ammendment —
Performance Work Statement —
Washer-Dryer Price Schedule —
Performance Questionnaire —
Washer-Dryer Price Schedule —
Solicitation —

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .