Atch_4_-_Schedule_Material_Submittals.xls

XLS spreadsheet 60 KB Posted

Attached to
Install Lights ar March ARB Running Track Federal contract opportunity
Solicitation number
FA466418B0003
Issued by
Department of the Air Force Reserve Command

About this file

Attachment 4 - Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Install Lights ar March ARB Running Track, newest first.
File Type Posted
Atch_8_-_Questions_and_Answers_dated_11Sep18.doc DOC document
Amendment_0002.doc DOC document
Atch_1_-_Wage_Dec_9-7-18.doc DOC document
Site_Walk_Notes.pdf PDF
Amendment_0001.docx DOCX document
FA466418B0003_-_SF1442.docx DOCX document
Atch_3_-_Drawings-Spec's.pdf PDF
Atch_5_-_FEP.pdf PDF
Atch_7_-_Site_Visit-Bid_Opening-Bid_Delivery_Pass_Sheet.doc DOC document
Atch_2_-_SOW_dated_21_Aug_18.doc DOC document
Atch_1_-_Wage_Dec_8-17-18.doc DOC document
Atch_6_-_Contractor_Security_Pamphlet_-_11_October_2017.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number: PDPG 18-0104Project Title:
Install Lights at Running TrackSolicitation / Contract Number:

FA466418B0003

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
Pole Specification
1Poles Drawing #222
LED Lights Specification
2LED Lights Drawing #322
01010-General Conditions
3As Built, Contract 3.12
033000-Cast-in-Place Concrete
4SD-05/SD-06-Concrete Mix Design22
260000.0020-Basic Elctrical Materials and Methods
5SD-02 Shop Drawings2
SD-03 Product Data22
Attachment 4 to

FA466418B0003

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

File details come from the government source that posted it.