Atch_4_-_Schedule_Material_Submittals.xls
XLS spreadsheet 60 KB Posted
- Attached to
- Install Lights ar March ARB Running Track Federal contract opportunity
- Solicitation number
- FA466418B0003
About this file
Attachment 4 - Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_8_-_Questions_and_Answers_dated_11Sep18.doc | DOC document | |
| Amendment_0002.doc | DOC document | |
| Atch_1_-_Wage_Dec_9-7-18.doc | DOC document | |
| Site_Walk_Notes.pdf | ||
| Amendment_0001.docx | DOCX document | |
| FA466418B0003_-_SF1442.docx | DOCX document | |
| Atch_3_-_Drawings-Spec's.pdf | ||
| Atch_5_-_FEP.pdf | ||
| Atch_7_-_Site_Visit-Bid_Opening-Bid_Delivery_Pass_Sheet.doc | DOC document | |
| Atch_2_-_SOW_dated_21_Aug_18.doc | DOC document | |
| Atch_1_-_Wage_Dec_8-17-18.doc | DOC document | |
| Atch_6_-_Contractor_Security_Pamphlet_-_11_October_2017.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: PDPG 18-0104 | Project Title: | |
| Install Lights at Running Track | Solicitation / Contract Number: |
FA466418B0003
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||
| Number of Copies Required | Remarks | ||||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | |||||
| Notified | Contractor Resubmittal | Final Approval | |||||||||||||||||||||
| Approved | Disapproved | ||||||||||||||||||||||
| Pole Specification | |||||||||||||||||||||||
| 1 | Poles Drawing #2 | 2 | 2 | ||||||||||||||||||||
| LED Lights Specification | |||||||||||||||||||||||
| 2 | LED Lights Drawing #3 | 2 | 2 | ||||||||||||||||||||
| 01010-General Conditions | |||||||||||||||||||||||
| 3 | As Built, Contract 3.1 | 2 | |||||||||||||||||||||
| 033000-Cast-in-Place Concrete | |||||||||||||||||||||||
| 4 | SD-05/SD-06-Concrete Mix Design | 2 | 2 | ||||||||||||||||||||
| 260000.0020-Basic Elctrical Materials and Methods | |||||||||||||||||||||||
| 5 | SD-02 Shop Drawings | 2 | |||||||||||||||||||||
| SD-03 Product Data | 2 | 2 | |||||||||||||||||||||
| Attachment 4 to |
FA466418B0003
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it.