Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_9_-_Questions_and_Answers_22_August_2017.pdf | ||
| Atch_1_-_General_Decision_Number_8-4-17.pdf | ||
| SF30_-_Amendment_0001.pdf | ||
| Site_walk_notes.pdf | ||
| Atch_6_-_FEP_March_ARB_June_2016_Signed.pdf | ||
| Atch_8_-_Bid_Opening-Bid_Delivery_Pass_Sheet.docx | DOCX document | |
| Atch_7_-_Security_Pamphlet.pdf | ||
| SF1442_Solicitation_FA4664-17-B-0002.pdf | ||
| Atch_3_-_Drawings-Pictures-As-built.pdf | ||
| Atch_1_-_General_Decision_Number.pdf | ||
| Atch_2_-_SOW_13_Jul_17.pdf | ||
| Atch_5_-_Specifications.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
Approved Disapproved
09510-Acoustical Ceilings
1 Para. 1.2 SD-03 Acoustical Units 2 NLT 5 days after NTP
2 Para. 1.2 SD-04 Acoustical Units 1 NLT 5 days after NTP
3 Para. 1.2 SD-06 Fire Resistive Ceilings 2 NLT 5 days after NTP
4 Para. 1.2 SD-07 Acoustical Units 2 NLT 5 days after NTP
09680-Carpeting
5 Carpet Tile Specification 2 1 2 2 NLT 5 days after NTP
09900-Paint and Coatings
6 Para. 1.2 SD-02 Coatings 2 NLT 5 days after NTP
7 Para. 1.2 SD-03 Color 1 NLT 5 days after NTP
8 Para. 1.2 SD-04 Applicator's License 2 NLT 5 days after NTP
Para. 1.2 SD-05 Manufacturer's Material
Safety Sheets
NLT 5 days after NTP
10 Para. 1.2 SD-06 Coatings 2 NLT 5 days after NTP
10260-Wall and Corner Guards
Para. 1.2 SD-03 Wall Guards (Bumper
Guards)
NLT 5 days after NTP
Para. 1.2 SD-04 Wall Guards (Bumper
Guards)
NLT 5 days after NTP
13 Para. 1.2 SD-04 Finish 2 NLT 5 days after NTP
Para. 1.2 SD-06 Wall Guards (Bumper
Guards)
NLT 5 days after NTP
Para. 1.2 SD-07 Wall Guards (Bumper
Guards)
NLT 5 days after NTP
16402-Interior Distribution System
C o lo r S e le c ti o n
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s F ie ld
T e s ts
P ro d u c t
D a ta
Solicitation / Contract Number:
FA4664-17-B-0002
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
R e q u ir e d S u b m is s io n D a te
Item or Description of Item, Contract
Reference, Type of Submittal
C e rt if ic a te s
D ra w in g s /D is k s
R e tu rn S u s p e n s e D a te
M S
D S
/T e c h n ic a l D a ta
Number of Copies Required
D a te
R e c e iv e d i n C o n tr a c ti n g
O
M M a n u a ls
O p e ra ti n g I n s tr u c ti o n s
S c h e d u le s
L is ti n g s
R e p o rt s
P la n s
Project Number:
PDPG 17-0116
Project Title:
Renovate East Side of Bldg. 2641
T e s t
R e p o rt s
D a te t o C iv il
E n g in e e ri n g
S a m p le s Date Contractor
Notified
(To be completed by Contract Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
SCHEDULE OF MATERIAL SUBMITTALS
Approved Disapproved C o lo r S e le c ti o n
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s F ie ld
T e s ts
P ro d u c t
D a ta
Solicitation / Contract Number:
FA4664-17-B-0002
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
R e q u ir e d S u b m is s io n D a te
Item or Description of Item, Contract
Reference, Type of Submittal
C e rt if ic a te s
D ra w in g s /D is k s
R e tu rn S u s p e n s e D a te
M S
D S
/T e c h n ic a l D a ta
Number of Copies Required
D a te
R e c e iv e d i n C o n tr a c ti n g
O
M M a n u a ls
O p e ra ti n g I n s tr u c ti o n s
S c h e d u le s
L is ti n g s
R e p o rt s
P la n s
Project Number:
PDPG 17-0116
Project Title:
Renovate East Side of Bldg. 2641
T e s t
R e p o rt s
D a te t o C iv il
E n g in e e ri n g
S a m p le s Date Contractor
Notified
(To be completed by Contract Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
16 Para. SD-03 Receptacles 2 NLT 5 days after NTP
17 Para. SD-03 Switches 2 NLT 5 days after NTP
Para. SD-03 Cover Plates
2 NLT 5 days after NTP