Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Building 2641 at March ARB, newest first.
File Type Posted
Atch_9_-_Questions_and_Answers_22_August_2017.pdf PDF
Atch_1_-_General_Decision_Number_8-4-17.pdf PDF
SF30_-_Amendment_0001.pdf PDF
Site_walk_notes.pdf PDF
Atch_6_-_FEP_March_ARB_June_2016_Signed.pdf PDF
Atch_8_-_Bid_Opening-Bid_Delivery_Pass_Sheet.docx DOCX document
Atch_7_-_Security_Pamphlet.pdf PDF
SF1442_Solicitation_FA4664-17-B-0002.pdf PDF
Atch_3_-_Drawings-Pictures-As-built.pdf PDF
Atch_1_-_General_Decision_Number.pdf PDF
Atch_2_-_SOW_13_Jul_17.pdf PDF
Atch_5_-_Specifications.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

Approved Disapproved

09510-Acoustical Ceilings

1 Para. 1.2 SD-03 Acoustical Units 2 NLT 5 days after NTP

2 Para. 1.2 SD-04 Acoustical Units 1 NLT 5 days after NTP

3 Para. 1.2 SD-06 Fire Resistive Ceilings 2 NLT 5 days after NTP

4 Para. 1.2 SD-07 Acoustical Units 2 NLT 5 days after NTP

09680-Carpeting

5 Carpet Tile Specification 2 1 2 2 NLT 5 days after NTP

09900-Paint and Coatings

6 Para. 1.2 SD-02 Coatings 2 NLT 5 days after NTP

7 Para. 1.2 SD-03 Color 1 NLT 5 days after NTP

8 Para. 1.2 SD-04 Applicator's License 2 NLT 5 days after NTP

Para. 1.2 SD-05 Manufacturer's Material

Safety Sheets

NLT 5 days after NTP

10 Para. 1.2 SD-06 Coatings 2 NLT 5 days after NTP

10260-Wall and Corner Guards

Para. 1.2 SD-03 Wall Guards (Bumper

Guards)

NLT 5 days after NTP

Para. 1.2 SD-04 Wall Guards (Bumper

Guards)

NLT 5 days after NTP

13 Para. 1.2 SD-04 Finish 2 NLT 5 days after NTP

Para. 1.2 SD-06 Wall Guards (Bumper

Guards)

NLT 5 days after NTP

Para. 1.2 SD-07 Wall Guards (Bumper

Guards)

NLT 5 days after NTP

16402-Interior Distribution System

C o lo r S e le c ti o n

M a n u fa c tu re r' s R e c o m m e n d a ti o n

M a n u fa c tu re r' s F ie ld

T e s ts

P ro d u c t

D a ta

Solicitation / Contract Number:

FA4664-17-B-0002

Remarks

(To be completed by Project Engineer)

L in e N u m b e r

R e q u ir e d S u b m is s io n D a te

Item or Description of Item, Contract

Reference, Type of Submittal

C e rt if ic a te s

D ra w in g s /D is k s

R e tu rn S u s p e n s e D a te

M S

D S

/T e c h n ic a l D a ta

Number of Copies Required

D a te

R e c e iv e d i n C o n tr a c ti n g

O

M M a n u a ls

O p e ra ti n g I n s tr u c ti o n s

S c h e d u le s

L is ti n g s

R e p o rt s

P la n s

Project Number:

PDPG 17-0116

Project Title:

Renovate East Side of Bldg. 2641

T e s t

R e p o rt s

D a te t o C iv il

E n g in e e ri n g

S a m p le s Date Contractor

Notified

(To be completed by Contract Administrator)

S u b m it ta l N u m b e rs

C o n tr a c to r R e s u b m it ta l

F in a l A p p ro v a l

SCHEDULE OF MATERIAL SUBMITTALS

Approved Disapproved C o lo r S e le c ti o n

M a n u fa c tu re r' s R e c o m m e n d a ti o n

M a n u fa c tu re r' s F ie ld

T e s ts

P ro d u c t

D a ta

Solicitation / Contract Number:

FA4664-17-B-0002

Remarks

(To be completed by Project Engineer)

L in e N u m b e r

R e q u ir e d S u b m is s io n D a te

Item or Description of Item, Contract

Reference, Type of Submittal

C e rt if ic a te s

D ra w in g s /D is k s

R e tu rn S u s p e n s e D a te

M S

D S

/T e c h n ic a l D a ta

Number of Copies Required

D a te

R e c e iv e d i n C o n tr a c ti n g

O

M M a n u a ls

O p e ra ti n g I n s tr u c ti o n s

S c h e d u le s

L is ti n g s

R e p o rt s

P la n s

Project Number:

PDPG 17-0116

Project Title:

Renovate East Side of Bldg. 2641

T e s t

R e p o rt s

D a te t o C iv il

E n g in e e ri n g

S a m p le s Date Contractor

Notified

(To be completed by Contract Administrator)

S u b m it ta l N u m b e rs

C o n tr a c to r R e s u b m it ta l

F in a l A p p ro v a l

16 Para. SD-03 Receptacles 2 NLT 5 days after NTP

17 Para. SD-03 Switches 2 NLT 5 days after NTP

Para. SD-03 Cover Plates

2 NLT 5 days after NTP