Attach2._Specifications.pdf
PDF 39 KB Posted
- Attached to
- Remove/Replace Batting Cages/Pitching Machines
- Solicitation number
- FA4661-17-Q-0099
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach3._Site_Visit_Submission_Form.doc | DOC document | |
| 1._17-Q-0099_Remove_and_Replace_Batting_Cages_Combo.pdf | ||
| Attach1._Question_Submission_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Disassembling, Removing and Installing New Batting Cage 6 September 2017
Description of Services. The contractor will be responsible for offloading and overseeing the delivery of the batting cage quoted. The Contractor will dispose of all debris and packaging material. The Contractor will remove the existing batting machines, elevator, netting and coin receptacles and place on a trailer furnished by outdoor Recreation. The Contractor will arrange logistics of shipping & installation.
Using the existing concert pad and poles will install Master Pitching Machine:
Two (2) each MA-4 Pitching machines PN: 761-091, or equal.
o One (1) Baseball with $.25 token boxes o One (1) Slow Pitch Softball with $.25 token boxes
Two (2) each Timers PN: 762-121, or equal.
One (1) each Model EW elevator PN: 762-195, or equal.
One (1) each two stall standard netting & accessories package PN: 761-899, or equal.
Two (2) each catcher mats PN: 762-207, or equal.
12 dozen yellow softuf baseballs PN: 762-107, or equal.
12 dozen yellow dimpled medium softballs PN: 762-191, or equal.
140 foot coin box connecting cable PN: 761-501, or equal.
One (1) each spare parts package (MA-4) PN: 760-320, or equal.
One (1) each bat package to include:
o 2 each youth baseball bats o 2 each adult baseball bats o 3 each softball bats
One (1) each helmet package to include:
o 3 each youth helmets o 3 each adult helmets.
Installation will be performed as not to void the factory warranty. Contractor will use the existing 110 volt power supply. In addition, the contractor will clean the batting cage area at completion to be ready for use. A function test will be completed prior to Government acceptance. The Contractor will be responsible to replace any items damaged during shipment and install. The United States Government will not provide any personnel, equipment, tools or materials towards the accomplishment of this task
File details come from the government source that posted it. Updated .