Attach2._Specifications.pdf

PDF 39 KB Posted

Attached to
Remove/Replace Batting Cages/Pitching Machines
Solicitation number
FA4661-17-Q-0099
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Attach3._Site_Visit_Submission_Form.doc DOC document
1._17-Q-0099_Remove_and_Replace_Batting_Cages_Combo.pdf PDF
Attach1._Question_Submission_Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Disassembling, Removing and Installing New Batting Cage 6 September 2017

Description of Services. The contractor will be responsible for offloading and overseeing the delivery of the batting cage quoted. The Contractor will dispose of all debris and packaging material. The Contractor will remove the existing batting machines, elevator, netting and coin receptacles and place on a trailer furnished by outdoor Recreation. The Contractor will arrange logistics of shipping & installation.

Using the existing concert pad and poles will install Master Pitching Machine:

Two (2) each MA-4 Pitching machines PN: 761-091, or equal.

o One (1) Baseball with $.25 token boxes o One (1) Slow Pitch Softball with $.25 token boxes

Two (2) each Timers PN: 762-121, or equal.

One (1) each Model EW elevator PN: 762-195, or equal.

One (1) each two stall standard netting & accessories package PN: 761-899, or equal.

Two (2) each catcher mats PN: 762-207, or equal.

12 dozen yellow softuf baseballs PN: 762-107, or equal.

12 dozen yellow dimpled medium softballs PN: 762-191, or equal.

140 foot coin box connecting cable PN: 761-501, or equal.

One (1) each spare parts package (MA-4) PN: 760-320, or equal.

One (1) each bat package to include:

o 2 each youth baseball bats o 2 each adult baseball bats o 3 each softball bats

One (1) each helmet package to include:

o 3 each youth helmets o 3 each adult helmets.

Installation will be performed as not to void the factory warranty. Contractor will use the existing 110 volt power supply. In addition, the contractor will clean the batting cage area at completion to be ready for use. A function test will be completed prior to Government acceptance. The Contractor will be responsible to replace any items damaged during shipment and install. The United States Government will not provide any personnel, equipment, tools or materials towards the accomplishment of this task

File details come from the government source that posted it. Updated .