Revised_PWS.pdf

PDF 67 KB Posted

Attached to
Financial Systems Administrator Support Federal contract opportunity
Solicitation number
FA4661-16-Q-0073
Issued by
Department of the Air Force Air Combat Command

About this file

Revised Performance Work Statement (PWS)

View the file

Other files for this federal contract opportunity

Other files attached to Financial Systems Administrator Support, newest first.
File Type Posted
Revised_FA4661-16-Q-0073.pdf PDF
Questions_and_Answers.pdf PDF
MFRquestionsFBO.pdf PDF
DD254.pdf PDF
QASP_signed.pdf PDF
Attch_2_SCA_Wage_Determination.docx DOCX document
FA4661-16-Q-0073_COMBO.pdf PDF
Attach_1_-_PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 1

PERFORMANCE WORK STATEMENT

1.0. DESCRIPTION OF SERVICES

The contractor shall provide all personnel necessary to provide Dyess AFB 7th Comptroller Squadron (CPTS) with contractor support for computer operations, LAN component and PC installation, network configuration and troubleshooting to assure uninterrupted accomplishment of daily operations and long-term system viability. Coordination and communication with GSC/FMF, Defense Mega Centers (DMCs) and local Communications personnel are required to perform services.

1.1. BACKGROUND & OVERVIEW

The 7th Comptroller Squadron within Dyess AFB consists of CAT 5 hubs, switches and routers, a Global Command and Control System terminal, PC workstations and laptops, printers, and other specialized PC-based servers to include CD-ROMs, virtual private network access, E-mail gateways, etc. with the majority of systems being associated with the NIPRNET. A DD Form 254, Department of Defense Contract Security Classification Specification, is required for all positions.

1.2. TASK REQUIREMENTS

The contractor shall provide the necessary Full Time Employee(s) (FTEs) and functional support required to fulfill this contract, as described within this PWS.

1.2.1. Support provided by the FSAs. FSA duties are divided into two primary areas-basic computer systems administration and financial systems application administration. FSAs shall ensure financial systems integration and network connectivity to local Network Operation Support Centers (NOSC's) and Defense Mega Centers (DMCs) and supply the required level of oversight, maintenance, and administrative support to ensure uninterrupted accomplishment of daily financial operations.

1.2.2. Computer Systems Administration Support. Includes providing professional Information Technology (IT) support to the Comptroller staff. Support includes, but is not limited to, the administration and maintenance of Comptroller IT equipment to include workstations, monitors, printers, scanners, and various other standard peripherals.

1.2.2.1. The contractor shall install, configure, and maintain all Comptroller workstations in accordance with AFNETOPS and local Communications Unit guidance. Configurations will generally include the installation of the Standard Desktop Configuration (SDC) or the Federal Desktop Computer Configuration (FDCC) on all government workstations.

1.2.2.2. All government workstations shall be maintained in such a way as to comply with prescribed Air Force communications guidance/governance, to include the application of patch updates, and configuration changes. The contractor shall serve as the Comptroller Unit's Client Support Administrator (CSA). The CSA will be notified via e-mail or telecom of all workstation patch requirements, and the suspense date for compliance. Compliance reporting is the responsibility of the contractor CSA.

1.2.2.3. The contractor shall serve as the Comptroller Unit's Information Technology Equipment Custodian (ITEC) Manager. As such, the contractor shall maintain inventory control over all accountable ITEC items, reporting and maintaining inventory in accordance with respective Wing ITEC management guidance and AFI 33-112, Information Technology Hardware Asset

Management.

1.2.2.4. The contractor shall be the focal point within the Comptroller Unit for identifying and reporting all network issues or outages to the respective network helpdesk for resolution. The contractor shall monitor trouble tickets submitted to the respective helpdesk, and shall keep the affected individual(s) appraised of the ticket status.

1.2.2.5. The contractor shall provide one-on-one Microsoft Office and Microsoft Windows operating system training to Comptroller clients as questions arise. Providing formal classroom type training is not a requirement of this performance work statement. One-on-one assistance shall be provided as necessary in the basic use of MS Office and or Windows, and shall be provided as time allows.

Clients requesting extensive training shall be directed to the local Communications Unit Training Facility.

1.2.2.6. The contractor shall provide specific hardware and software acquisition recommendations to management based on analysis of Comptroller IT needs, requirements, and existing resources. The contractor shall keep Comptroller management apprised of the current state of Unit IT equipment and associated tech refresh requirements.

1.2.2.7. The contractor shall maintain an inventory of printer consumables (cartridges, fusers, etc.), and shall retain all Unit print devices in working order to include toner replacement as necessary.

Upon confirmation of a current and active warranty, the contractor shall initiate technical support service calls with the equipment vendor should the contractor not be capable of fixing a hardware issue locally. The contractor shall identify printer hardware and printer consumable items required for purchase to the Unit resource advisor for Government purchase.

1.2.2.8. As the Unit IT professional, the contractor shall advise management as requested on the latest computer and communication equipment/technology available to the Air Force.

1.2.2.9. The contractor shall serve as the Comptroller Unit's Air Force Portal content administrator.

Administration of Portal content does not require Internet programming capability. The contractor shall post images and update text based content as necessary in order to main the Unit's Air Force Portal presence.

1.2.3. Financial Systems Administrator Support. The contractor shall be the IT focal point for multiple Comptroller/Financial systems. The contractor shall be the technical point of contact for application installation/maintenance, not the functional point of contact for the application.

1.2.3.1. Financial Systems application administration shall include the installation, maintenance, and troubleshooting of various financial applications (as listed in Attachment 1). The contractor shall install various Comptroller-specific applications on workstations within the Comptroller Unit.

1.2.3.2. The contractor shall assist Computer Systems Administrators at various locations throughout the Wing with the installation, maintenance, and troubleshooting of financial applications.

1.2.3.3. The contractor shall facilitate the upgrade and maintenance of FM applications (Attachment

1) in the event of a release or upgrade.

1.2.3.4. The contractor shall troubleshoot application issues, engaging the application helpdesk or local Communications Unit as necessary to resolve the issue.

1.2.3.5. Application server installation, maintenance, and administration are beyond the scope of this effort. The contractor shall not maintain/administer physical server hardware.

1.2.3.6. The contractor shall develop extensive continuity procedures covering all financial applications in use within the Comptroller Unit. Continuity procedures shall be created within the MS Office Suite of tools, and retained within an FSA continuity binder. The continuity binder may be developed centrally and dispensed to each of the Wing FSA, or each FSA may build a continuity folder unique to their respective site. The binder shall be reviewed and refreshed as necessary on a quarterly basis. All information shall be available in both hard copy and soft copy format.

1.2.3.7. The contractor shall ensure efficient collaboration occurs between all 7th CPTS FSAs.

Collaboration shall include the creation and maintenance of a library of tools to facilitate the sharing/distribution of financial application administration materials among the 7th CPTS FSAs.

1.2.3.8. The contractor shall establish a "support network" for use in the event of an extended FSA vacancy (beyond 1week) where the Comptroller staff may rely on other FSAs via telephone or e-mail, thus ensuring that emergency support is available to the Comptroller staff.

1.2.4. Telecommunications Support

1.2.4.1. Contractor personnel shall also manage the operability of Comptroller Squadron telecommunications to include blackberries, conference room projection equipment and VTC systems, and any Government issued cellular telephones and PDA devices.

1.2.5. Miscellaneous Support

1.2.5.1. Historically an average of 50-100 PCs or peripheral equipment can be expected to be added, moved, upgraded or patched weekly.

1.2.5.2. Contractor employees must be able to lift and carry at least 40 pounds.

1.2.5.3. Set up and/or relocate hardware (e.g., workstations, printers) as required. This will require lifting up to 35 pounds from floor to desktop height.

1.2.5.4 Unpack, inspect, and test incoming computer hardware to ensure that all parts have been received and arc in satisfactory condition. This may involve moving incoming computer hardware from the loading dock to a temporary storage area.

1.3. SPECIAL SKILLS REQUIRED

1.3.1. Specific Experience and Expertise. All on-site contractors staffing shall be IA Technician (IAT) Level I certified as defined in the DOD 8570.01-M, pages 24 and 25. The contractor proposal shall clearly address the IAT Level I certification requirements.

1.3.2. Functional Skills. Contractor personnel assigned to this task should be familiar with the FM applications listed in Attachment 1. The contractor must understand the interrelationships and capabilities of other standard off-the-shelf microcomputer software packages (e.g., MS Windows, and MS Office). Knowledge of Air Force and Department of Defense (DoD) financial systems and their application environment is desired. Knowledge of Air Force Information Technology (IT) equipment accountability program (ITEC), wireless devices, and all applicable peripherals is desired.

Additionally, the contractor will assist users in fully utilizing the capabilities of Microsoft Office software products in the preparation of briefings, documents, and spreadsheets. This assistance will be provided on a not to interfere basis with other requirements of this PWS and primary functions.

1.4. TRAVEL

1.4.1. Local travel to attend meetings within the local city or base of assignment commuting vicinity shall be considered a cost of doing business and shall not be separately reimbursed.

1.5. PERFORMANCE SCHEDULE

1.5.1 Performance Schedule: The contractor shall perform this task from 1 July 2016 through 31 January, 2017 (Base Period) with six (6) month option period as follows:

Base Period: 1 July 2016 to 31 January 2017 Option: 1 February 2017 to 31 July 2017

1.5.2. Place of Performance: The contractor shall perform and accomplish tasks identified in this PWS at Dyess AFB 7th CPTS listed in para 1.1.

1.5.3. Duty Hours: normal operational hours are 0730-1630, Monday through Friday. The contractor will provide continuous support during these hours.

1.5.4. After Hours: Occasional after-hours support may be required based on customer needs as stated in paragraph 1.2.5.1, and are usually restricted to personnel who are TDY and require technical assistance.

1.6. DELIVERABLES

The contractor shall be responsible for delivering all end items specified within chart under paragraph 1.6.3. The method of surveillance for all deliverables will be by government inspection and acceptance. The 7th Contracting Office requires copies of listed deliverables.

1.6.1. FSA Collaboration and Knowledge-base. An online tool (requiring only a web browser) shall provide a forum for FSAs to cross-feed information amongst the Financial Management team.

A searchable discussion forum where files may be uploaded/downloaded and questions/answers may be posted. The knowledge-base shall allow analysts to continually capture, create, and refine solutions as a natural part of the workflow process. As solutions are added to the Knowledge-base, they shall become immediately available for shared use. The Knowledge-base shall be a "self-service" database of technical information containing information, guidance, advice, links and statistics from other FSAs. The Knowledge-base tool shall:

Develop, refine and capture best practices for use by FSA across installations with similar requirements.

Allow for rapid "keyword" searches of all posted material (including uploaded files).

Send email alerts to all FSAs whenever a new post occurs. Provide email alerts to posting FSAs whenever a response to their query was posted.

Send email alerts to appropriate systems (e.g. ABSS, DEAMS) help desk whenever a net post occurs and whenever a response to a query was posted.

Provide for a high level view of what is occurring across the Financial Management community and allows for the rapid identification and resolution of Air Force-wide Financial Management system issues.

Provide a central repository of purely Financial Management system information and expertise providing a picture of the current and past state of Financial Management system analysis and maintenance across the Air Force.

Provide a searchable repository of support information tailored and customized for Financial Management systems only.

1.6.2. Perform Quality Assurance Survey. Survey assessing the quality of service provided by the FSA will be sent to each Comptroller on a bi-annual basis. These surveys shall be provided to the Comptroller Squadron Commander and Financial Management.

1.6.3. Contractor Manpower Reporting. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

Deliverables Due Date Trouble Call Summary Monthly-unless otherwise Establish Continuity of Operations Plan and provide collaboration tools

Annually

Monthly Progress Reports Monthly Supplies Inventory Usage and Requests Semi-Annually Hardware and Software Inventory and Status Reports

Annually

1.7. SERVICE DELIVERY SUMMARY

Task Requirements Performance Requirement/Acceptable Quality Level

Method of Surveillance

PWS Paragraph

Setup and/or relocate hardware (e.g., workstations, printers) as required

Respond to requests promptly.

Daily review of complicated jobs to include time of completion estimate. (95% of the time)

Daily observation

1.2.3.

Receive and respond to user trouble calls relating to hardware, software, and connectivity

Answer all telephone calls and correct the problem as soon as possible. A fast response and customer satisfaction are priority 1. (99% of the time)

Daily observation

1.2.3.4.

1.2.3.5.

Contractor personnel shall maintain the Comptroller Squadron Air Force Portal pages, various Community of Practice pages and SharePoint pages

Review customer knowledge management page input to ensure information is up to date. Schedule updates and log estimated time of completion during weekly review of page content and customer requests for change/update requests.

Weekly review 1.2.3.9.

Analyze processing malfunctions in cooperation with government personnel to determine causes and take appropriate corrective action

Same day response to malfunctions –Log problem and estimate time of completion by end of day

(99% of the time)

Daily observation

1.2.4.2.

1.2.4.3.

1.2.4.4.

Contractor personnel shall develop and maintain Continuity Procedures for Financial applications

Review Continuity folder to ensure information is up to date and reflects current environment

(99% of the time)

Quarterly review

1.2.4.6.

Manage the operability of conference room projection equipment and VTC systems

Daily operational checks on the projector NTC system.

Ensure any problems are reported and logged daily.

(95% of the time)

Daily observation

1.2.5.

Submission of deliverables, logs, reports, and forms

On-time delivery of specific deliverable on due date (95% of the time)

Daily observation

1.2.3.3.

1.6.

SECTION 2

ENVIRONMENTAL, SAFETY, HEALTH AND SECURITY

2.0. ENVIRONMENTAL REQUIREMENTS

The Contractor shall comply with all applicable federal, state and local environmental statutes, instructions, manuals, handbooks, regulations, guidance, policy letters and rules (including all changes and amendments), and all Presidential Executive Orders in effect on the date of award.

The Contractor shall comply with the highest degree of environmental protection where any disagreements exist.

2.1. SAFETY AND HEALTH REQUIREMENTS

2.1.1. The Contractor shall comply with all applicable Occupational Safety and Health Administration (OSHA) and Air Force Occupational Safety and Health (AFOSH) standards, technical orders, regulations and referenced publications. The Contractor shall comply with the highest degree of safety protection where any disagreements exist.

2.2. SECURITY

The Contractor and all Contractor personnel shall abide by all AF and local rules, procedures and standards of conduct.

2.2.1. Physical Security.

2.2.1.1. The Contractor shall safeguard all Government property and controlled forms provided for Contractor use and adhere to the Government property requirements contained in this contract. The Contractor shall ensure all Government equipment and materials are secured at the end of each day.

2.2.1.2. For Official Use Only (FOUO) and Privacy Act. Comply with requirements of DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, as well as The Privacy Act of 1974, as amended at 5 U.S.C. 552. This regulation/guidance sets policy and procedures for the disclosure of records to the public and for marking, hand ling, transmitting and safeguarding FOUO and Privacy Act information/material.

2.2.2. Personnel Security.

2.2.2.1. All personnel assigned to this contract shall be U.S. citizens. Prior to performance, all Contractor personnel shall be able to obtain a Secret Clearance and hold either an Interim (favorably completed National Agency Check Plus written Inquiries investigation (NAC-1)) or in place Secret security clearance. Contractor personnel shall have appropriate clearances prior to commencing work unless otherwise approved in writing by the CO. Contractor personnel performing any tasks in their own facilities that require classified AF information must also have an appropriate security clearance.

2.2.2.2. Controlled/Restricted Areas. Implement local base procedures for entry to AF controlled or restricted areas where Contractor personnel shall work. The Government will complete an AF Form 2586, Unescorted Entry Authorization Certificate, completed and signed by the sponsoring agency's Security Manager, before a Restricted Area Badge will be issued.

Contractor employees shall have a favorably completed NAC-1 investigation before receiving a Restricted Area Badge. Interim access shall be granted IAW AFI 31-501, Personnel Security Program Management.

2.2.2.3. Within 10 calendar days of award, the Contractor shall provide the Primary COR a list with the names, location of performance and clearance requirements of all company employees assigned to the contract.

2.2.3. Classified Information. For all tasks with classified work or access to classified information, the Contractor shall:

2.2.3.1. It is expected that all contractor personnel will have the appropriate security clearance within 10 calendar days after contract award. The Contractor shall also complete visit requests for each individual that will perform work in the Joint Personnel Adjudication System (JPAS) prior to performance start unless otherwise approved in writing by the CO.

2.2.3.2. Clearance Requirements - DD Form 254. Comply with, coordinate, and complete a DD Form 254, Department of Defense Contract Security Classification Specification. Upon award, the Government will route the DD Form 254 for appropriate coordination and signature for incorporation into the contract. The hosting SAF/FM activity will provide security classification guidance for contract performance. The Government will oversee handling and storage of classified information and provide appropriate storage capability for all classified material. All classified information shall be returned to the Government prior to departing Government premises at the end of each day and week or immediately upon termination from employment, or at contract end, whichever occurs first.

2.2.3.3. Visitor Group Security Agreement (VGSA). Enter into a long term VGSA through the host base Information Security Program Manager. Provide the information requested by AFFARS 5352.204-9000, Notification of Government Security Activity and Visitor Group Security Agreements. Visitor Groups shall safeguard all collateral classified information IAW DoD 5200.1-R, Information Security Program; AFI 31-401, Information Security Program Management; AFI 31-601, Industrial Security Program Management, and other directives deemed necessary by the servicing Information Protection office. In addition to the items required by AFFARS 5352.204-9000, the VGSA shall outline how the Contractor integrates security requirements for contract operations with the AF to ensure effective and economical operation on the installation, the use of security forms and conducting inspections required by DoD 5220.22-R, Industrial Security Regulation, and protection of high value pilferable property.

2.2.3.4. Facility Clearance. Industrial Security guidelines stipulate that facility clearances must be specific and that Contractor employee security clearances cannot be higher than the facility clearance of the company. The Prime Contractor shall possess a SECRET facility clearance at contract start. The Prime Contractor shall ensure that any Teaming Partners or Subcontractors have the appropriate clearances for the work performed prior to beginning performance.

2.2.3.5. Communications Security (COMSEC). Contractors may require access to COMSEC information on Air Force installations. The Contractor shall not require a COMSEC account.

Access will be controlled by the sponsoring agency. Access to COMSEC material by personnel is restricted to U.S. citizens holding final U.S. Government clearances.

2.3. GENERAL

2.3.1. Security Training. Provide employees with training required by DoD 5200. 1-R, Information Security Program Regulation and AFI 31-401, Information Security Program Management. The Contractor shall also provide initial and follow-on training to Contractor personnel who work in AF controlled/restricted areas IAW AFI 31-101, Air Force Installation Security Program. This training shall be provided by an appointed security manager for the for the on base Visitor Group.

2.3.2. Pass and Identification Items. Obtain pass and identification items for employees and non-Government-owned vehicles required for contract performance prior to performance start date.

2.3.3. Retrieving Identification Media. Retrieve all identification media, including vehicle passes, when the contract expires or from employees who depart for any reason before the contract expires, e.g., terminated for cause, retirement, etc.

2.3.4. Traffic Laws. All Contractor employees shall comply with base traffic regulations.

2.3.5. Weapons, Firearms and Ammunition. Contractor employees shall not possess weapons, firearms, or ammunition or carry these items within Contractor-owned vehicle or privately-owned vehicles while on any installation or any office/working location covered under this contract.

2.3.6. Reporting Requirements. Immediately report to an appropriate authority (i.e., CO, PM, COR) any information or circumstances that may pose a threat to the security of DoD personnel, Contractor personnel, resources and classified or unclassified defense information.

2.3.7. For Official Use Only (FOUO). The contractor shall comply with DoD 5400-7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

2.3.8. Privacy Act. Work on this project may require that the contractor have access to Privacy Information. The contractor shal1 adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations.

2.3.9. In/Out-Processing Requirements. Contractors will be required to complete in-processing requirements, which will include at a minimum, security paperwork, security badge issue, initial training requirements and network accounts creation. Contractor employees terminating work will be required to complete out-processing requirements, which will include at a minimum security badge revocation.

2.3.10. Hours of Work. On-site contractor support shall be available during customer agency normal operating hours as defined by the individual work locations (the hours may vary slightly amongst the different locations. Work will generally consist of 40-hour workweeks, Monday through Friday, excluding federal holidays, with one hour lunch break. The contractor shall provide for non-standard duty hours support on an as required basis. Non-standard duty hours may be required during the month of September (for all performance periods) for fiscal year end support. The contractor shall coordinate the daily work schedule during the month of September (for all performance periods) with the local Comptroller to ensure ample IT support coverage is provided, in an effort to adhere to a 40 hour workweek. Contractor will conform to a schedule agreed upon by the COR and the contractor. Duty schedule conflicts unable to be resolved between the COR and contractor will be arbitrated by 7th Contracting Squadron (with notification to FM). The contractor will provide a 24 hour written notice to the COR prior to any change in contractor shift schedule.

2.3.11. Federal Holidays. The contractor will not normally be required to work during the following holidays. If performance is required for these holidays, it will be approved and scheduled in advance with the COR.

New Year’s Day January 1 Martin Luther King Day Third Monday of January President’s Day Third Monday of February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday of September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Fourth Thursday in November Christmas December 25

Normally, if the holiday falls on a Saturday, it is observed on the preceding Friday. If the holiday falls on a Sunday, it is observed on the following Monday.

2.3.12. Dress/Appearance. Contractor personnel shall present a professional appearance appropriate to the environment at the Comptroller Squadron. Contractor personnel shall wear a badge (e.g. CAC), visible at all times, identifying them as contract employees.

2.3.13. Smoking, Eating and Drinking. The contractor shall comply with base smoking regulations and smoke, eat, and drink only in designated areas.

2.3.14. Driving License/On-Base Requirements. The contractor and employees shall comply with base traffic regulations, including use of seat belts.

2.3.15. Information Technology Equipment (ITE). Establish and implement procedures to ensure all ITE, to include laptops and other data processing devices, issued to the Contractor by the Government are not lost or misplaced, are not used by unauthorized persons or are not subject to unauthorized external devices.

2.3.16. The Contractor shall immediately report to the CO any occurrences of lost ITE within two (2) hours of discovery of occurrence.

2.3.17. In the event that ITE is lost, the Contractor may be required, upon written direction of the CO, to replace the equipment at no additional cost to the Government. The Government may replace the equipment and deduct the cost of such from the monthly payment due the Contractor.

2.3.18. Key/Access Badge Control. Establish and implement procedures to ensure all keys/access badges issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The Contractor shall not duplicate any keys/access badges issued by the Government.

2.3.18.1. The Contractor shall not loan issued keys/access badges to any other persons or allow access by use of issued keys/access badges to any other persons.

2.3.18.2. The Contractor shall report to the CO any occurrences of lost or duplicated keys/access badges within 24 hours of discovery of occurrence.

2.3.18.3. In the event keys/access badges are lost or duplicated, the Contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks with no additional cost to the Government. The Government may replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the Contractor.

2.3.19. Lock Combinations. Control access to all Government-provided lock combinations to prevent unauthorized entry. The Contractor is not authorized to record lock combinations without written approval by the CO. Records with written combinations to authorized secure storage containers, secure storage rooms, or certified vaults, shall be marked and safeguarded at the highest classification level as the classified material maintained inside the approved containers.

2.4. PROCEDURES FOR PAYMENT.

Billing and payment shall be accomplished in accordance with the contract award CLIN structure and cost and will be invoiced on a Monthly basis. Invoicing will be processed through Wide Area Work Flow (WAWF).

FA4661-16-Q-0073

Attachment 1 – Financial Systems and Applications Environment

The Comptroller system and application environment includes, but is not limited to, the following systems;

Automated Business Services System (ABSS) Automated Funds Management (AFM) Centralized Disbursing Software (CDS) Commanders Resource Integrated System (CRIS)

Defense Enterprise Accounting and Management System (DEAMS) Defense Joint Military Payroll System (DJMS)

Defense MilPay Office (DMO) Defense Travel System (DTS) Enterprise Output Manager (EOM) Financial Management Suite (FM Suite) Integrated Accounts Payable System (IAPS) Job Order Cost Accounting System (J OCAS) Leave Web

File details come from the government source that posted it. Updated .