Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_2.pdf | ||
| B528_SOW_Figures_1_to_3.pdf | ||
| Combo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FACIA REPAIR FOR BUILDING 528 BASE OPERATIONS FACILITY
4 May 2016
1. GENERAL: The contractor shall provide all materials, plans, labor, equipment and supervision necessary to do the following:
2. PRINCIPAL FEATURES: The work to be performed includes, but is not limited to, the following:
2.1. Demolition
2.1.1. Removal of Triangular areas of existing tiled fascia located on east and west sides of tower in B528. See Figure #1.
2.1.2. Removal of Rectangular areas of existing tiled fascia located on east and west sides of tower and below the horizontal brick border underneath the triangular areas. See Figure #1.
2.2. Proposed new construction
2.2.1. Period of Performance – 90 Days starting from Notice to Proceed to end of project. 60 Days for Material acquisition; 30 days for project completion.
2.2.2. Repair and replacement of the area, where the tile was removed, is located on east and west sides at the top tower in B528. The area to be replaced on east or west walls is 102 sq. feet each, for a total area of 204 sq.
feet. Information as to tile type, specification and number is listed in Table 1.
Table 1 Type # Manufacturer or Equal Manufacture Spec or Equal Number (Estimate)1 Type 1 Summitville Tile 8”X8” Cadet Gray or Equal 392 Type 2 Summitville Tile 8”X8” New Bedford or Equal 80 Type 3 Summitville Tile 5”X5” Harbor Blue or Equal 28
1 Tile number includes both east side and west side triangular and rectangular areas on the tower.
2.2.3 General Information and Instruction: The area of repair is 49 feet off the ground. (See Figure #2). At that height, any type of falling debris will pose a safety hazard as well as causing damage to the roof below. Access to the east wall will not be straight forward. Contractor will remove the glue residue from sub-wall surface. Contractor will apply good construction practice so the surface of the new fascia matches the surrounding brick frame. Tile adhesive and grout must meet the tile manufactures specifications as well as ambient air temperatures from -30F to 105F.
Contractor shall keep a daily log of construction. This log should include quality control reports, material inspections, observations and construction comments. The Project Inspector shall have access to this log and may request a copy.
3. PREWORK REQUIREMENTS: The contractor shall perform a pre-work inspection of the projects work area. If fascia tile and/or brick are found in defective conditions or not shown/noted on provided drawings shall be documented on the contractor’s daily Quality Control report and reported to Civil Engineering’s Project Inspector assigned to the project.
4. CONSTRUCTION/SITE MANAGEMENT: The contractor shall perform a final cleanup and repair of the work area, including, but not limited to, any damage done to adjacent grounds, pavements or structures. Any damage shall be repaired and returned to conditions matching those before the contractor began work on this task order. Work Hours shall be between the hours of 7:00a.m. to 4:00 p.m.; Monday through Friday.
5. SPECIFICATIONS: All work shall be accomplished according to UFC 1-200-01 General Building Requirements, Unified Facilities Guide Specifications, and any manufacturer’s specification associated with materials and supplies.
In the event of a conflict between any of the specifications or codes the most stringent standard will apply.
6. SUBMITTALS: The contractor shall provide material submittals for the tile, adhesive, and grout to be used. Type and color of grout to be used shall be determined by attempting to match the new grout to the existing grout.
7. PERMITS: The contractor shall obtain all applicable construction permits for this task order including, but not limited to, AF Form 103 Work Clearance Request, welding, burn permit, as well as any permits or licenses required for the removal of hazardous materials.
8. RESTRICTED AREAS: Restricted areas identified in GFAFBI 31-101 include the Command Post (CP) and Mass Parking Area (MPA). Each area is fenced or conspicuously identified by posted signs. Work will be performed in restricted areas. See new requirements for contractor working in restricted areas.
9. PROJECT AREA: This contract will entail work in Controlled Areas. All Contractor personnel shall be escorted while on the west side of building. See Figure 3. Escorts will be provided by GFAFB.
10. MINIMUM SECURITY REQUIREMENTS (All Areas Including Base Entry):
10.1. Visitor Passes: The Commercial Visitor Control Center will issue an SFMIS AF Form 75 (Visitor Pass) to the contractor and contractor employees upon completion of the screening process for the duration of contract.
10.1.1. Although contractors will not be issued vehicles passes, vehicles are subject to search while on the installation. Contractor personnel are required to obtain a contractor visitor pass.
11. CONDUCT REQUIREMENTS: The contractor’s employees shall comply with all base traffic regulations and properly conduct themselves while on this base.
12. RESTRICTIONS: When working on base, all security regulations shall be obeyed.