QandA.docx
DOCX document 14 KB Posted
- Attached to
- Replace Data Room AC Bldg. 500 Federal contract opportunity
- Solicitation number
- FA4626-20-Q-0056
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QandA 2.docx | DOCX document | |
| Amendment 001.pdf | ||
| B500 Roof Access 02.jpg | JPG image | |
| B500 Roof Unit and Access.jpg | JPG image | |
| B500 Existing Data Aire Unit Controls.jpg | JPG image | |
| B500 Roof Access 01.jpg | JPG image | |
| B500 Roof Unit 2.jpg | JPG image | |
| B500 Existing Data Aire Unit Exterior.jpg | JPG image | |
| B500 Existing Data Aire Unit Name Plate.jpg | JPG image | |
| B500 Existing Data Aire Disconnect.jpg | JPG image | |
| B500 Existing Data Aire Unit Interior 2.jpg | JPG image | |
| B500 Roof Access 2.jpg | JPG image | |
| B500 Existing Data Aire Unit Piping.jpg | JPG image | |
| B500 Roof Unit 1.jpg | JPG image | |
| B500 Roof Access 1.jpg | JPG image | |
| B500 Roof Unit 3.jpg | JPG image | |
| Site Visit Notice_24Jul20.pdf | ||
| Atch3_As-Built Dwgs_Mechanical.pdf | ||
| Atch1_SOW_1Jun20.pdf | ||
| Atch5_B500 DuroLast Roof warranty.pdf | ||
| Atch2_B500 - Asbestos Inspection Report.pdf | ||
| Atch3_As-Built Dwgs _Electrical.PDF | ||
| Atch4_B500 Existing Service Area.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Data Room AC Bldg. 500
QUESTIONS & ANSWERS FROM EMAILS
1. Is there any way to schedule another site visit?
Answer: There is not time to schedule another site visit for such a small job with quotes due 07 Aug 20. In addition, due to Malmstrom AFB being under HPCON Charlie, according to our Base Commander’s guidance, if you travel from South Carolina, a red state, to Montana, you will have to ROM for 14 days (at your own expense) before you will be allowed on base.
QUESTIONS & ANSWERS FROM SITE VISIT
2. Is there a redundant system?
Answer: There is no redundancy.
3. Will the temporary cooling needed? Will the customer provide the temporary cooling?
Answer: No temporary cooling is expected but the government will supply any temporary cooling, if needed.
4. Is there a service elevator in B500?
Answer: There is only 1 elevator in B500. It is a standard passenger elevator with a 3ft wide opening.
5. Where is the access to the roof?
Answer: The access to the roof is from the stairway next to the elevator. See pictures.
6. Who is the controls contractor for the existing controls?
Answer: Electro Controls has done majority of recent work on base.
7. What is the extent of the new electrical?
Answer: No new electrical except what is needed for the new AC unit, i.e. if existing wiring is not long enough for new unit, contractor is responsible for installing junction box, conduit, wire, etc to power unit.
8. Is it necessary to lay plywood on the roof for foot traffic?
Answer: Installation of a plywood walk way is not necessary as long as the existing walkway is utilized. Plywood should be used if there is a possibility of damage due to equipment movement, etc.
9. Are there any restrictions on the use of a crane?
Answer: No restrictions for use of a crane except 3 days notice to block off area.
10. Where is the unit disconnect?
Answer: It is in the basement of the main mechanical room of Building 500, at the north end of the building.