QandA 2.docx
DOCX document 14 KB Posted
- Attached to
- Replace Data Room AC Bldg. 500 Federal contract opportunity
- Solicitation number
- FA4626-20-Q-0056
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 001.pdf | ||
| B500 Roof Access 02.jpg | JPG image | |
| B500 Roof Unit and Access.jpg | JPG image | |
| B500 Existing Data Aire Unit Controls.jpg | JPG image | |
| B500 Roof Access 01.jpg | JPG image | |
| B500 Roof Unit 2.jpg | JPG image | |
| B500 Existing Data Aire Unit Exterior.jpg | JPG image | |
| QandA.docx | DOCX document | |
| B500 Existing Data Aire Unit Name Plate.jpg | JPG image | |
| B500 Existing Data Aire Disconnect.jpg | JPG image | |
| B500 Existing Data Aire Unit Interior 2.jpg | JPG image | |
| B500 Roof Access 2.jpg | JPG image | |
| B500 Existing Data Aire Unit Piping.jpg | JPG image | |
| B500 Roof Unit 1.jpg | JPG image | |
| B500 Roof Access 1.jpg | JPG image | |
| B500 Roof Unit 3.jpg | JPG image | |
| Site Visit Notice_24Jul20.pdf | ||
| Atch3_As-Built Dwgs_Mechanical.pdf | ||
| Atch1_SOW_1Jun20.pdf | ||
| Atch5_B500 DuroLast Roof warranty.pdf | ||
| Atch2_B500 - Asbestos Inspection Report.pdf | ||
| Atch3_As-Built Dwgs _Electrical.PDF | ||
| Atch4_B500 Existing Service Area.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Data Room AC Bldg. 500
QUESTIONS & ANSWERS FROM EMAILS
11. What are the dimensions of the elevator and stairway?
Answer: The Bldg. 500 has 1 elevator with the opening size of 42”W x 84”H. Alternately, if the elevator is not big enough, a stairway will have to be used. There is a stairway next to the elevator at the front entrance to Bldg. 500. Double doors open to the stairway from the lobby and the stair is 48” W. The doorway from the stairs to the second floor is 41” wide.
12. Due to COVID 19 we may exceed the performance time to get some materials, can that time be adjusted?
Answer: The performance period can be extended, if necessary, with a modification to the awarded contract.
13. Are there multiple CLINs or a bid schedule?
Answer: No, there is only 1 CLIN for a total project cost.
14. Is there a bid hold time?
Answer: Amendment 001 extends the quote submittal deadline to Friday 14 August 2020 at 2PM MDST (Mountain Daylight Savings Time). Quotes need to be valid through 30 September 2020.
15. Is the access door to the roof big enough for the roof unit to be removed and the new one installed?
Answer: The access to the roof is from the stairway next to the elevator. See pictures. There are 4 stories to the roof. The access door is 35”W x 58”H. To remove the old roof unit and place the new unit, it is suggested a crane will be needed, but any other means the contractor devises will be considered.
16. Does the AC unit have to be Data Aire brand?
Answer: No, this solicitation is not “Name Brand Only.” The specifications in the solicitation are for the existing circa 1985 Data Aire unit OR EQUAL.