QandA 2.docx

DOCX document 14 KB Posted

Attached to
Replace Data Room AC Bldg. 500 Federal contract opportunity
Solicitation number
FA4626-20-Q-0056
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Replace Data Room AC Bldg. 500, newest first.
File Type Posted
Amendment 001.pdf PDF
B500 Roof Access 02.jpg JPG image
B500 Roof Unit and Access.jpg JPG image
B500 Existing Data Aire Unit Controls.jpg JPG image
B500 Roof Access 01.jpg JPG image
B500 Roof Unit 2.jpg JPG image
B500 Existing Data Aire Unit Exterior.jpg JPG image
QandA.docx DOCX document
B500 Existing Data Aire Unit Name Plate.jpg JPG image
B500 Existing Data Aire Disconnect.jpg JPG image
B500 Existing Data Aire Unit Interior 2.jpg JPG image
B500 Roof Access 2.jpg JPG image
B500 Existing Data Aire Unit Piping.jpg JPG image
B500 Roof Unit 1.jpg JPG image
B500 Roof Access 1.jpg JPG image
B500 Roof Unit 3.jpg JPG image
Site Visit Notice_24Jul20.pdf PDF
Atch3_As-Built Dwgs_Mechanical.pdf PDF
Atch1_SOW_1Jun20.pdf PDF
Atch5_B500 DuroLast Roof warranty.pdf PDF
Atch2_B500 - Asbestos Inspection Report.pdf PDF
Atch3_As-Built Dwgs _Electrical.PDF PDF
Atch4_B500 Existing Service Area.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Data Room AC Bldg. 500

QUESTIONS & ANSWERS FROM EMAILS

11. What are the dimensions of the elevator and stairway?

Answer: The Bldg. 500 has 1 elevator with the opening size of 42”W x 84”H. Alternately, if the elevator is not big enough, a stairway will have to be used. There is a stairway next to the elevator at the front entrance to Bldg. 500. Double doors open to the stairway from the lobby and the stair is 48” W. The doorway from the stairs to the second floor is 41” wide.

12. Due to COVID 19 we may exceed the performance time to get some materials, can that time be adjusted?

Answer: The performance period can be extended, if necessary, with a modification to the awarded contract.

13. Are there multiple CLINs or a bid schedule?

Answer: No, there is only 1 CLIN for a total project cost.

14. Is there a bid hold time?

Answer: Amendment 001 extends the quote submittal deadline to Friday 14 August 2020 at 2PM MDST (Mountain Daylight Savings Time). Quotes need to be valid through 30 September 2020.

15. Is the access door to the roof big enough for the roof unit to be removed and the new one installed?

Answer: The access to the roof is from the stairway next to the elevator. See pictures. There are 4 stories to the roof. The access door is 35”W x 58”H. To remove the old roof unit and place the new unit, it is suggested a crane will be needed, but any other means the contractor devises will be considered.

16. Does the AC unit have to be Data Aire brand?

Answer: No, this solicitation is not “Name Brand Only.” The specifications in the solicitation are for the existing circa 1985 Data Aire unit OR EQUAL.