This is a solicitation for an anti-ram cable system and replacement of security gates at six missile alert facilities located at Malmstrom Air Force Base in Montana. The work includes removing existing gates and installing new anti-ram gates along with electrical and wiring work. It also involves installing anti-ram cable systems at each facility comprising posts, cable, hardware and connecting to existing cathodic protection systems. The solicitation includes 13 line items for the work at individual facilities and mobilization, as well as items for government delays and bonding. Pricing is fixed-price and responses are due by September 21, 2020. The period of performance is from April 21, 2020 to September 21, 2020. The work will be inspected and accepted by the 341st Civil Engineer Squadron at Malmstrom AFB.
FA4626-19-R-A009 Solicitation
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
FA462619RA009
Section A - Solicitation/Contract Form
Section B - Supplies or Services and Prices/Cost
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
0001 Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization". The Government will exercise every effort to keep the mobilization from one site to the next to a minimum distance. The Government will only pay for one mobilization per site. Mobilization for the anti-ram cables shall be paid as Each (EA).
Firm Fixed Price
5.0 Each
0002 Anti-ram Gate for C-01 Missile Alert Facility Includes all work and equipment necessary to remove existing security gate and install new anti-ram gate at C-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to demolish and remove the existing concrete slab and footing, removal of existing gate, excavate for new concrete slab and footing, build reinforced concrete for new slab and footing, and installation of new gate. The work shall also include all costs for labor, materials, and equipment to pull wire back to MAF, demolish all conduit specified, excavate for and install new duct bank and pull boxes, install new conduit into and out of pull boxes, and pull new wire from source to load without splices. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work in the contract "Anti-ram Gate".
Firm Fixed Price
1.0 Lot
0003 Anti-ram Gate for D-01 Missile Alert Facility Includes all work and equipment necessary to remove existing security gate and install new anti-ram gate at D-01 Missile Alert Facility. The work shall include all costs for labor,
1.0 Lot
materials, and equipment to demolish and remove the existing concrete slab and footing, removal of existing gate, excavate for new concrete slab and footing, build reinforced concrete for new slab and footing, and installation of new gate. The work shall also include all costs for labor, materials, and equipment to pull wire back to MAF, demolish all conduit specified, excavate for and install new duct bank and pull boxes, install new conduit into and out of pull boxes, and pull new wire from source to load without splices. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work in the contract "Anti-ram Gate".
Firm Fixed Price
0004 Anti-ram Gate for L-01 Missile Alert Facility Includes all work and equipment necessary to remove existing security gate and install new anti-ram gate at L-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to demolish and remove the existing concrete slab and footing, removal of existing gate, excavate for new concrete slab and footing, build reinforced concrete for new slab and footing, and installation of new gate. The work shall also include all costs for labor, materials, and equipment to pull wire back to MAF, demolish all conduit specified, excavate for and install new duct bank and pull boxes, install new conduit into and out of pull boxes, and pull new wire from source to load without splices. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work in the contract "Anti-ram Gate".
Firm Fixed Price
1.0 Lot
0005 Anti-ram Gate for N-01 Missile Alert Facility Includes all work and equipment necessary to remove existing security gate and install new anti-ram gate at N-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to demolish and remove the existing concrete slab and footing, removal of existing gate, excavate for new concrete slab and footing, build reinforced concrete for new slab and footing, and installation of new gate. The work shall also include all costs for labor, materials, and equipment to pull wire back to MAF, demolish all conduit specified, excavate for and install new duct bank and pull boxes, install new conduit into and out of pull boxes, and pull new wire from source to load without splices. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work in the contract "Anti-ram Gate".
Firm Fixed Price
0006 Anti-ram Gate for O-01 Missile Alert Facility Includes all work and equipment necessary to remove existing security gate and install new anti-ram gate at O-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to demolish and remove the existing concrete slab and footing, removal of existing gate, excavate for new concrete slab and footing, build reinforced concrete for new slab and footing, and installation of new gate. The work shall also include all costs for labor, materials, and equipment to pull wire back to MAF, demolish all conduit specified, excavate for and install new duct bank and pull boxes, install new conduit into and out of pull boxes, and pull new wire from source to load without splices. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work in the contract "Anti-ram Gate".
Firm Fixed Price
1.0 Lot
0007 Anti-ram Cable System for C-01 Missile Alert Facility Includes all work and equipment necessary to install an anti-ram cable system at C-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to excavate for posts, build posts, and build reinforced concrete for posts.
Work shall also include all costs for labor, materials, and equipment to install traffic medians. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to assemble cable to include seizing, swage ends, thimble, grips, and turnbuckles. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work.
Firm Fixed Price
0008 Anti-ram Cable System for D-01 Missile Alert Facility Includes all work and equipment necessary to install an anti-ram cable system at D-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to excavate for posts, build posts, and build reinforced concrete for posts.
Work shall also include all costs for labor, materials, and equipment to install traffic medians. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to assemble cable to include seizing, swage ends, thimble, grips, and turnbuckles. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work.
Firm Fixed Price
1.0 Lot
0009 Anti-ram Cable System for L-01 Missile Alert Facility Includes all work and equipment necessary to install an anti-ram cable system at L-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to excavate for posts, build posts, and build reinforced concrete for posts.
Work shall also include all costs for labor, materials, and equipment to install traffic medians. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to assemble cable to include seizing, swage ends, thimble, grips, and turnbuckles. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work.
Firm Fixed Price
1.0 Lot
0010 Anti-ram Cable System for N-01 Missile Alert Facility Includes all work and equipment necessary to install an anti-ram cable system at N-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to excavate for posts, build posts, and build reinforced concrete for posts.
Work shall also include all costs for labor, materials, and equipment to install traffic medians. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to assemble cable to include seizing, swage ends, thimble, grips, and turnbuckles. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work.
Firm Fixed Price
0011 Anti-ram Cable System for O-01 Missile Alert Facility Includes all work and equipment necessary to install an anti-ram cable system at O-01 Missile Alert Facility. The work shall include all costs for labor, materials, and equipment to excavate for posts, build posts, and build reinforced concrete for posts.
Work shall also include all costs for labor, materials, and equipment to install traffic medians. Work shall also include all costs for labor, materials, and equipment to excavate for bollards, build bollards, and build concrete for bollards. Work shall also include all costs for labor, materials, and equipment to assemble cable to include seizing, swage ends, thimble, grips, and turnbuckles. Work shall also include all costs for labor, materials, and equipment to cleanup, and all other incidental items necessary to complete the work.
Firm Fixed Price
1.0 Lot
0012 Government Delays Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost during normal work hours and shall not include evenings, Saturdays, Sundays, Winter Exclusion, or Federal Holidays.
Firm Fixed Price
50.0 Hours
0013 Bonding Purchase and maintenance of all required bonds including but not limited to Performance and Payment Bonds, and all other bonds required for completion of the work. Payment for Bonds will be paid by the government for the actual costs of bonds as identified on the submitted bonds. At no time shall payment exceed the actual costs of bonds.
Firm Fixed Price
Section C - Description/Specifications/Statement of Work
Requirements Repair ANTI RAM CABLES II
This requirement is for adding an anti-ram cable system and replacement of the existing gate with an anti-ram gate in the Malmstrom AFB, Montana missile complex. The anti-ram cable system consists of posts, cable, cable hardware, and attaching system to existing cathodic protection system. The replacement of the existing gate with an anti-ram gate consists of removing existing gate, installing an electrical duct bank and pull boxes, pulling wires back to source, installing new wire from source through duct bank to load, and installing the new gate.
The NAICS Code for this project is 238990 with a small business size standard of $15,000,000.00.
The magnitude of this project is between $1,000,000.00 and $5,000,000.00.
Funds Notice: Funds are not presently available for this contract. The Governments obligation under this contract is contingent upon the availability of appropriated funds which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until the funds are made available to the Contracting Officer.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
0001 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0002 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0003 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0004 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0005 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0006 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0007 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0008 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0009 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3
Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0010 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0011 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0012 Inspection and Acceptance Location
Both
Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
0013 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Section F - Deliveries or Performance
0001 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
5.0 Each
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0002 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0003 Delivery Schedule Ship To Address
Delivery On Or Before Ship To
21 SEP 2020
1.0 Lot
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0004 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0005 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0006 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0007 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance
From
21 APR 2020
to
21 SEP 2020
0008 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0009 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0010 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0011 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0012 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
50.0 Hours
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
0013 Delivery Schedule Ship To Address
Delivery On Or Before
21 SEP 2020
1.0 Lot
Ship To
DoDAAC: F2W3D3 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
341 CES CEMS MISSILE COMPLEX
20 RESCUE RD BLDG 1708
AF BPN NO MILSBILLS PROCESSES
MALMSTROM AFB, MT 59402
United States
OfficeCode:
J.T. Street Telephone: 4067317196 Email:
Period of Performance From
21 APR 2020
to
21 SEP 2020
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.242-15 Stop-Work Order. 1989-08
FAR Clauses Incorporated by Full Text
52.211-10 Commencement, Prosecution, and Completion of Work. 1984-04 As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984) The Contractor shall be required to (a)commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b)prosecute the work diligently, and (c)complete the entire work ready for use not later than 120 days ANP.* The time stated for completion shall include final cleanup of the premises.
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.201-7000 Contracting Officer's Representative 1991-12 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. 2018-12 252.236-7000 Modification Proposals--Price Breakdown. 1991-12
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. 2018-12 As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause- Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov;
and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the Web Based Training link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer: 2-in-1 Invoice (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either Invoice 2in1 or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(f) [Note: The Contractor may use a WAWF combo document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
| Field Name in WAWF || Data to be entered in WAWF | | Pay Official DoDAAC || F87700 | | Issue By DoDAAC || FA4626 | | Admin DoDAAC || FA4626 | | Inspect By DoDAAC || F2W3D3 | | Ship To Code || ____ | | Ship From Code || ____ | | Mark For Code || ____ | | Service Approver (DoDAAC) || FA4626 | | Service Acceptor (DoDAAC) || FA4626 | | Accept at Other DoDAAC || ____ | | LPO DoDAAC || ____ | | DCAA Auditor DoDAAC || ____ | | Other DoDAAC(s) || ____ |
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert See Schedule or Not applicable.)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activitys WAWF point of contact.
robert.stinson.3@us.af.mil; james.pilkington.1@us.af.mil;
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.202-1 Definitions. 2013-11 52.203-3 Gratuities. 1984-04 52.203-6 Alternate I Restrictions on Subcontractor Sales to the Government. - (Alternate I) 2006-09 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. 2010-10 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform
Employees of Whistleblower Rights.
2014-04
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper.2011-05 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. 2018-10 52.204-13 System for Award Management Maintenance. 2018-10 52.209-6 Protecting the Government's Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment.
2015-10
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. 2015-11 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a
Felony Conviction under any Federal Law.
2016-02
52.215-2 Audit and Records-Negotiation. 2010-10 52.215-8 Order of Precedence-Uniform Contract Format. 1997-10 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-
Modifications.
2011-08
52.219-6 Deviation 2019- O0003
Notice of Total Small Business Set-Aside (DEVIATION 2019-O0003) 2011-11
52.219-8 Utilization of Small Business Concerns. 2018-10 52.219-13 Notice of Set-Aside of Orders. 2011-11 52.219-14 Deviation 2019- O0003
Limitations on Subcontracting (DEVIATION 2019-O0003) 2017-01
52.222-1 Notice to the Government of Labor Disputes. 1997-02 52.222-3 Convict Labor. 2003-06 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation. 2018-03 52.222-6 Construction Wage Rate Requirements. 2018-08 52.222-7 Withholding of Funds. 2014-05 52.222-8 Payrolls and Basic Records. 2018-08 52.222-9 Apprentices and Trainees. 2005-07 52.222-10 Compliance with Copeland Act Requirements. 1988-02 52.222-11 Subcontracts (Labor Standards). 2014-05 52.222-12 Contract Termination-Debarment. 2014-05 52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations.
2014-05
52.222-14 Disputes Concerning Labor Standards. 1988-02 52.222-15 Certification of Eligibility. 2014-05 52.222-21 Prohibition of Segregated Facilities. 2015-04 52.222-27 Affirmative Action Compliance Requirements for Construction. 2015-04 52.222-37 Employment Reports on Veterans. 2016-02 52.222-55 Minimum Wages Under Executive Order 13658. 2015-12 52.223-6 Drug-Free Workplace. 2001-05 52.223-11 Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons.
2016-06
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. 2011-08 52.225-13 Restrictions on Certain Foreign Purchases. 2008-06 52.227-1 Authorization and Consent. 2007-12 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. 2007-12 52.228-14 Irrevocable Letter of Credit. 2014-11 52.229-3 Federal, State, and Local Taxes. 2013-02 52.232-17 Interest. 2014-05
52.232-23 Assignment of Claims. 2014-05 52.232-33 Payment by Electronic Funds Transfer-System for Award Management.2018-10 52.232-39 Unenforceability of Unauthorized Obligations. 2013-06 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. 2013-12 52.233-1 Disputes. 2014-05 52.233-3 Protest after Award. 1996-08 52.233-4 Applicable Law for Breach of Contract Claim. 2004-10 52.236-2 Differing Site Conditions. 1984-04 52.236-3 Site Investigation and Conditions Affecting the Work. 1984-04 52.236-5 Material and Workmanship. 1984-04 52.236-6 Superintendence by the Contractor. 1984-04 52.236-7 Permits and Responsibilities. 1991-11 52.236-8 Other Contracts. 1984-04 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements.
1984-04
52.236-10 Operations and Storage Areas. 1984-04 52.236-11 Use and Possession Prior to Completion. 1984-04 52.236-12 Cleaning Up. 1984-04 52.236-13 Accident Prevention. 1991-11 52.236-15 Schedules for Construction Contracts. 1984-04 52.236-17 Layout of Work. 1984-04 52.242-13 Bankruptcy. 1995-07 52.242-14 Suspension of Work. 1984-04 52.243-1 Alternate I Changes-Fixed-Price. - (Alternate I) 1987-08 52.243-4 Changes. 2007-06 52.243-5 Changes and Changed Conditions. 1984-04 52.244-5 Competition in Subcontracting. 1996-12 52.249-2 Termination for Convenience of the Government (Fixed-Price). 2012-04 52.249-2 Alternate I Termination for Convenience of the Government (Fixed-Price). -
(Alternate I) 2012-04
52.249-10 Default (Fixed-Price Construction). 1984-04 52.253-1 Computer Generated Forms. 1991-01
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials 2011-09 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. 2013-09 252.204-7003 Control of Government Personnel Work Product. 1992-04 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls. 2016-10 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident
Reporting.
2016-10
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. 2016-05 252.205-7000 Provision of Information to Cooperative Agreement Holders 1991-12 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the
Government of a Country that is a State Sponsor of Terrorism.
2015-10
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. 2010-12 252.223-7008 Prohibition of Hexavalent Chromium. 2013-06 252.225-7001 Buy American and Balance of Payments Program. 2017-12 252.225-7002 Qualifying Country Sources as Subcontractors. 2017-12 252.225-7012 Preference for Certain Domestic Commodities. 2017-12 252.225-7048 Export-Controlled Items. 2013-06 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic
Enterprises, and Native Hawaiian Small Business Concerns.
2004-09
252.227-7033 Rights in Shop Drawings. 1966-04 252.232-7010 Levies on Contract Payments. 2006-12 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. 2013-06 252.243-7001 Pricing of Contract Modifications. 1991-12 252.243-7002 Requests for Equitable Adjustment. 2012-12 252.244-7000 Subcontracts for Commercial Items 2013-06
FAR Clauses Incorporated by Full Text
52.211-12 Liquidated Damages-Construction. 2000-09 As prescribed in 11.503(b), insert the following clause in solicitations and contracts:
Liquidated Damages-Construction (Sept 2000) (a)If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $837.90 for each calendar day of delay until the work is completed or accepted.
(b)If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications. 2010-10 As prescribed in 15.408(m), insert the following clause:
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (Oct 2010)
(a) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth at FAR 15.403-4 on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in the following paragraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable-
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Information on modifications of contracts or subcontracts for commercial items.
(A) If-
(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and
(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.
(B) For a commercial item exception, the Contractor shall provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Such information may include-
(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g.,wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.
(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.
(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for certified cost or pricing data. If the Contractor is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Contractor shall submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.
(2) As soon as practicable after agreement on price, but before award (except for unpriced actions), the Contractor shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR15.406-2.
52.219-28 Post-Award Small Business Program Rerepresentation. 2013-07 As prescribed in 19.309(c), insert the following clause:
Post-Award Small Business Program Rerepresentation (Jul 2013)
(a) Definitions. As used in this clause-
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is not dominant in its field of operation when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/ table-small-business-size-standards.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it [_] is, [_] is not a small business concern under NAICS Code 238990 assigned to contract number.
[Contractor to sign and date and insert authorized signer's name and title].
(End of clause)
52.222-26 Equal Opportunity. 2015-09 As prescribed in 22.810(e), insert the following clause:
Equal Opportunity (Sept 2015)
(a) Definition. As used in this clause.
"Compensation" means any payments made to, or on behalf of, an employee or offered to an applicant as remuneration for employment, including but not limited to salary, wages, overtime pay, shift differentials, bonuses, commissions, vacation and holiday pay, allowances, insurance and other benefits, stock options and awards, profit sharing, and retirement.
"Compensation information" means the amount and type of compensation provided to employees or offered to applicants, including, but not limited to, the desire of the Contractor to attract and retain a particular employee for the value the employee is perceived to add to the Contractor's profit or productivity; the availability of employees with like skills in the marketplace;
market research about the worth of similar jobs in the relevant marketplace; job analysis, descriptions, and evaluations;
salary and pay structures; salary surveys; labor union agreements; and Contractor decisions, statements and policies related to setting or altering employee…
This is the start of the file's text. The full file is on GovTribe.