Amended_Drawings_Part_3.pdf

PDF 3 MB Posted

Attached to
Anti RAM II Federal contract opportunity
Solicitation number
FA4626-19-R-A009
Issued by
Department of the Air Force Global Strike Command

About this file

This set of construction drawings and specifications is for an anti-ram cable system at Malmstrom Air Force Base in Montana. The project involves demolishing an existing gate and installing a new gate, fencing, bollards, pull boxes, and underground utilities including a duct bank for power, communications, fire alarm, and CCTV cables. The drawings show the site demolition and construction plans, details for concrete foundations, bollards, gates and associated hardware. Specifications require installing 8 terminal posts, 24 line posts, and over 3,500 feet of cable along with related materials. Electrical work includes routing fire alarm, telephone, power and low-voltage cables to the new gate and cameras via pull boxes and conduits in the duct bank.

Amended Drawings Part 3

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

115'-7"

CS404

T

Y P

A R

A M

A R

A M

A R

A M

ARAM

ARAM

ARAM

ARAM ARAM ARAM ARAM ARAM ARAM ARAM ARAM

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

ANTIRAM CABLE SYSTEM

(3'-6" FROM EXISTING FENCE TYP)

ANCHOR POST

ES404

269'-2"

192'-3"

HICS

H

IC

S

H

IC

S

H

IC

S

H

IC

S

H

IC

S

H

IC

S

HICS

H

IC

S

H

IC

S

HICS HICS

H

I

C

S

S A

N

T

T

E

E

F U

E L

A B

F U

E L

A B

FUEL

AB

FUEL

AB

F U

E L

A B

FUEL

AB

E

E

E

E E E E

E

E

F

E E E

E

E

C

T

H

C

T

H

C

T H

C

T

H

FOFO

F O

FOFO

F O

C

C

T V

C

C

T

V

C

C

T

V

C

C

T

V

C

C

T V

C

C

T

V

C

C

T

V

C

C

T

V

C

C

T V

C C

T V

C C

T V

P B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H T

R

A B

H

T

R A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H T

R

A B

H

T

RA

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H T

R A

B

H

T

R

A

B

H

T

R

A

B

WTHR

WTHR

WTHR

WTHR

WTHR

WTHR

WTHR

W

T

H

R

W

T

H

R

W

T

H

R

W

T

H

R

W

T

H

R

W

T

H

R

W

T

H

R

W

T

H

R

WTHR

G WTHR

G

WTHR

G

WTHR

G WTHR

G WTHR

G

W

T

H

R G

W

T

H

R

G

W

T

H

R G

W

T

H

R

G

W

T

H

R

G

W

T

H

R

G

W

T

H

R

G

W T

H R

G W

T H

R

G

COMM

AB

COMM

AB

COMM

AB

COMM

AB

COMM

AB

COMM

AB

COMM

AB

COMM

AB

R

V

A

RVA

R V

A

R V

A

RVA

G

R V

A

G

RVA

G

RVA

G

R V

A

G

R

V

A

RVA

R V

A

R V

A

R

V

A

G

R

V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

RVA

G

SAN

SAN

GRND

GRND

G

R

N

D

G R

N D

G R

N D

G

R

N

D

E

F

S

S

W

W

M

W

M

W

W

D W

D W

E

F

IB

E R

E

E

E

E

E

E

E

E

E

F

I B

E

R

F

I B

E

R

F I B

E

R

N

G

A

S

SAN

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

122115114

121116

110A

103A103

102101

M

E

E

C

N

MEECN

MEECN

MEECN

MEECN

D

M

D M

N G

A S

N

G

A

S

NGAS

NGAS

NGAS

N

G

A

S

N

G

A

S

N

G

A

S

N

G

A

S

N

G

A S

N G

A S

N G

A S

N

G

A

S

N

G

A

S

N G

AS

N G

AS

NGAS

192'-3"

C

T

H

C

T

H

CTH

DW

M

W

M

W

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

ARAM

ARAM

ARAMARAM

ARAM

ARAM

FO

E E

ARAM

ARAMARAM

ARAM

ARAMARAM

C

T

H

C T

H C

T H

NO LINE POST

WITHIN 40' OF

TERMINAL POST

(5) REMOVABLE

BOLLARDS

GATE

(4) BOLLARDS

W/ CHANNEL

POWER

PULL BOX

COMMUNICATION

PULL BOX

DUCT BANK

POWER

PULL BOX

COMMUNICATION

PULL BOX

GATE PHONE

POSITION OF GATE MAY

NEED TO BE ADJUSTED

DEPENDING ON LOCATION

AND DEPTH OF EXISTING

UTILITIES

E

C O

M M

N

R E G

I O

N A L

GENERAL NOTES:

1. VERIFY AND LOCATE SITE UTILITIES BEFORE DIGGING.

2. FIELD VERIFY EXISTING CONDUIT SIZES.

3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.

4. SOIL BORINGS INDICATE SANDY CLAY, BROWN, LEAN TO 2'

BFG.,THEN SILTY SAND WIH SHALE FRAGMENTS TO 10'.

5. POWER AUGER LOG INDICATES SAND, CLAY DARK BROWN TO 2'

BFG, THEN SILTY SAND LIGHT GRAY TO 6' BFG.

6. SLFCS APPROX 4' BFG

7. SEE CX002 FOR GENERAL PROJECT NOTES

ESTIMATED ANTI-RAM CABLE SYSTEM MATERIAL QUANTITIES

TERMINAL

POST (EA)

LINE POSTS

(EA)

CABLE ASSY

(EA)

CABLE LENGTH

(FT)

REMOVABLE

BOLLARDS

(EA)

BOLLARDS

(EA)

BOLLARDS

WITH

CHANNEL

(EA)

9 23 24 3500 5 0 4

DNAMMOCEKIRTS

AIRFORCE GLOBAL

100% DRAWING

16-1620A

Feet

0 20 40

AutoCAD SHX Text

RVA TOWER

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

NEW

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

FT

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

& UTILITY

AutoCAD SHX Text

FURNACE

AutoCAD SHX Text

VEST

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

WEIGHT ROOM

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

RECREATION

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

DINING &

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

DUAL MODE/UHF ANTENNA

AutoCAD SHX Text

WEATHER STATION ANTENNA

AutoCAD SHX Text

RAIN GAUGE

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text

EP&T

AutoCAD SHX Text

MEECN ANTENNA

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

L-01 SITE PLAN

AutoCAD SHX Text

AUG 02 2018

AutoCAD SHX Text

AutoCAD SHX Text

CS-106

AutoCAD SHX Text

GLOBAL STRIKE COMMAND

AutoCAD SHX Text

MALMSTROM AIR FORCE BASE, MONTANA

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

REVIEWED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

FILE NUMBER

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

OF

AutoCAD SHX Text

MAF ANTI-RAM CABLES MALMSTROM AFB, MT

AutoCAD SHX Text

ATTACHMENT 4

AutoCAD SHX Text

FA4626-18-R-0038

AutoCAD SHX Text

S A

N

S A

N

FUEL

AB

F U

E L

A B

F U

E L

A B

F U

E L

A B

F U

E L

A B

FUEL

AB

FUEL

AB

FUEL

AB

F U

E L

A B

F U

E L

A B

F U

E L

A B

FUEL

AB

FUEL

AB

FUEL

AB

FOFOFOFOFO

F O

F O

FOFOFOFO

F O

F O

H

T

R

AB

HTR

AB

HTR

AB

HTR

H

T R

A

B

H

T

R

A

B

HTR

AB

HTR

AB

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

W

T

H

R

COMM

AB

COMM

AB

R V

A

R V

A

SAN

S

S

M

W

M

W

D W

D W

D W

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

102101

M

E

E

C

N

M

E

E

C

N

MEECN

MEECN

D M

N

G

A

S

N

G

A

S

N G

A S

N G

A S

N

G

A

S

N

G

A S

N

G

A S

N G

A S

DW

FOFO

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

C X

C

X

S A

N

S A

N

FUEL

AB

F U

E L

A B

F U

E L

A B

F U

E L

A B

F U

E L

A B

FUEL

AB

FUEL

AB

FUEL

AB

F U

E L

A B

F U

E L

A B

F U

E L

A B

FUEL

AB

FUEL

AB

FUEL

AB

FOFOFOFOFO

F O

F O

FOFOFOFO

F O

F O

H

T

R

AB

HTR

AB

HTR

AB

H

T R

A

B

H

T

R

A

B

HTR

AB

HTR

AB

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

W

T

H

R

COMM

AB

COMM

AB

R V

A

R V

A

SAN

S

S

M

W

M

W

D W

D W

D W

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

102101

M

E

E

C

N

M

E

E

C

N

MEECN

MEECN

D M

N

G

A

S

N

G

A

S

N G

A S

N G

A S

N

G

A

S

N

G

A S

N

G

A S

N G

A S

DW

FOFO

DNAMMOCEKIRTS

AIRFORCE GLOBAL

100% DRAWING

16-1620A

Scale: 1/8" = 1'-0"

DEMOLITION PLAN

Scale: 1/8" = 1'-0"

CONSTRUCTION PLAN

N

R E G

I O

N A L

N

R E G

I O

N A L

KEYED NOTES:

1. SAW CUT ASPHALT IF APPLICABLE AND DIG TO AVOID GROUNDING SYSTEM.

COORDINATE WITH ELECTRICAL.

2. SAW CUT ASPHALT. MAINTAIN ONE LANE OF TRAFFIC. CUT AND DEMOLISH

ABANDON FUEL OIL PIPING AND CONDUIT.

3. SAW CUT CONCRETE CURB. PREPARE SURFACES FOR PATCHING.

4. SAVE AND RE-USE ROCK MULCH.

5. DEMO GATE OPERATOR ENCLOSURE. COORDINATE WITH ELECTRICAL TO

DEENERGIZE. DEMOLISH CONCRETE SLAB AND REMOVE FROM SITE.

6. SAW CUT AND DEMOLISH CURB FOR NEW STANCHION BASE.

7. DEMOLISH GATE. TURN OVER TO OWNER. MAINTAIN ONE LANE OF TRAFFIC.

8. DEMOLISH EXISTING STANCHION.

9. INSTALL TEMPORARY GATE. GATE SHALL BE FURNISHED BY GOVERNMENT.

TEMP GATE INSTALLED BEFORE EXISTING GATE IS DEMOLISHED.

10. INSTALL TEMPORARY FENCE. SEE DRAWING CX506 FOR DETAILS.

11. SAWCUT AND REMOVE ASPHALT.

X

KEYED NOTES:

1. INSTALL PULL BOXES. SEE DETAIL 4 CX-505 FOR DEPTH. SURROUND WITH

ENGINEERED FILL.

2. INSTALL DUCT BANK. SEE DETAILS CX-505. SURROUND WITH ENGINEERED FILL.

3. PATCH ASPHALT TO MEET MAXIMUM GATE CLEARANCE OF 5". MAINTAIN SAME

GRADE ON TIE-IN OF EXISTING.

4. PATCH CURB. SEE DETAIL 4 CX-506.

5. INSTALL NEW GATE OPERATOR FOUNDATION. COORDINATE WITH ELECTRICAL

AND SEE DETAILS CX-504

6. INSTALL GATE. MAXIMUM GATE CLEARANCE 5" TO SOLID SURFACES AND 2" TO

DIRT. CENTER DISTANCE BETWEEN GATE STANCHIONS WITH CENTER OF ROAD.

SEE TAILS CX-503 & CX-504.

7. INSTALL NEW GATE FOOTING FOUNDATION. SEE DETAILS CX-504

8. INSTALL REMOVABLE BOLLARDS. 4 FT O.C. NO CONNECTING CHANNEL. SEE

DETAIL 2 CX-506

9. INSTALL CONCRETE FILLED BOLLARDS. 5 FT O.C. WITH CONNECTING CHANNEL.

SEE DETAILS 3 & 4 CX-502

10. INSTALL NEW PERSONNEL GATE. SEE DETAILS CX-508.

11. DO NOT INSTALL LINE POSTS WITHIN 40 FT OF END TERMINAL POST.

12. REINSTALL FENCE FROM NEW GATE TO EXISTING FENCE. MAXIMUM 5" OPEN

SPACE. SEE DETAILS CX-507.

13. POSITION OF GATE MAY NEED TO BE ADJUSTED DEPENDING ON LOCATION AND

DEPTH OF EXISTING UTILITY.

X

GENERAL NOTES:

1. VERIFY AND LOCATE SITE UTILITIES BEFORE

DIGGING.

2. FIELD VERIFY EXISTING CONDUIT SIZES.

3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.

4. SLFCS APPROX. 4' BFG

5. SEE CX002 FOR GENERAL PROJECT NOTES.

6. PULL BOXES ARE NOT JUNCTION BOXES. NO

SPLICES IN PULL BOXES.

Feet

0 8 16

Feet

0 8 16

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GLOBAL STRIKE COMMAND

AutoCAD SHX Text

MALMSTROM AIR FORCE BASE, MONTANA

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

REVIEWED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

FILE NUMBER

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

OF

AutoCAD SHX Text

MAF ANTI-RAM CABLES MALMSTROM AFB, MT

AutoCAD SHX Text

ATTACHMENT 4

AutoCAD SHX Text

FA4626-18-R-0038

AutoCAD SHX Text

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

L-01 CIVIL ENTRANCE PLAN

AutoCAD SHX Text

AUG 02 2018

AutoCAD SHX Text

CS-404

H

IC

S

H

IC

S

H

IC

S

H

IC

S

H

I

C

S

H

IC

S

H

IC

S

H

IC

S

H

IC

S

H

I

C

S

HICS HICS

H

IC

S

H

IC

S

H

IC

S

H

I

C

S

HICS HICS

HICS

HICS

H

I

C

S

T

T

T

T

E

E

E

E

E

E

E

E

E

E E E E E E

E

E

E

E

F

F

F

F

F F

F F

F

F

F

E E E E E E

E

E

E

E

E

CCTV

C

C

T

V

C

C

T

V

C

C

T

V

C

C

T

V

C

T

H

C

T

H

C

T

H

CTH

C

T

H

CTH

C

T

H

FOFOFOFOFO

F O

F O

FOFOFOFO

F O

F O

CCTV

C

C

T V

C

C

T V

C

C

T V

C

C

T V

CCTV

C

C

T V

C

C

T V

C

C

T V

C

C

T V

CCTV

C

C

T V

C

C

T V

C

C

T V

C

C

T V

C C

T V

P B

P B

C C

T V

C C

T V

H

T

R

AB

HTR

AB

HTR

AB

H

T

R

A

B

H

T

R

A

B

HTR

AB

HTR

AB

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R A

B

W

T

H

R

COMM

AB

COMM

AB

R V

A

RVA

G RVA

G

R V

A

R

V

A

G

R V

A

G R

V A

G R

V A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

RVA

G

RVA

G

RVA

G

GRND

GRND

GRND

G

R

N

D

G

R

N

D

G R

N D

G R

N D

G R

N D

G

R

N

D

G R

N D

T

E

L

C

O

M

M

C

O

M

M

E

E

F

IB

E R

F

I

B

E

R

E

E

E

E

E

E

E

E

E

E

E

F

I B

E

R

F

I

B

E

R

F

I B

E

R

102101

M

E

E

C

N

M

E

E

C

N

MEECN

MEECN

D M

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

FOFO

TEL

T E

L

T E

L

E E E E

E

E

C O

M M

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

H

IC

S

H

IC

S

H

IC

S

H

IC

S

H

I

C

S

H

IC

S

H

IC

S

H

IC

S

H

IC

S

H

I

C

S

HICS HICS

H

IC

S

H

IC

S

H

IC

S

H

I

C

S

HICS

HICS HICS

HICS

H

I

C

S

T

T

T

T

E

E

E

E

E

E

E

E

E

E E E E E E

E

E

E

E

F

F

E E E E E E

E

E

E

E

E

C

C

T

V

C

T

H

C

T

H

C

T

H

CTH

C

T

H

CTH

C

T

H

FOFOFOFOFO

F O

F O

FOFOFOFO

F O

F O

C

C

T V

C

C

T V

C

C

T V

C

C

T V

C

C

T V

C C

T V

P B

H

T

R

AB

HTR

AB

HTR

AB

HTR

H

T R

A

B

H

T

R

A

B

HTR

AB

HTR

AB

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R A

B

W

T

H

R

COMM

AB

COMM

AB

R V

A

RVA

G RVA

G

R V

A

R

V

A

G

R V

A

G R

V A

G

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

RVA

G

RVA

G

RVA

G

GRND

GRND

GRND

G

R

N

D

G

R

N

D

G R

N D

G R

N D

G R

N D

G

R

N

D

G R

N D

F

IB

E R

F

I

B

E

R

E

E

E

E

E

E

E

E

E

E

E

F

I B

E

R

F

I

B

E

R

F

I B

E

R

102101

M

E

E

C

N

M

E

E

C

N

MEECN

MEECN

D M

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

S

L

F

C

S

FOFO

TEL

E E E E

F

T

E

L

C

C

T V

C

C

T

V

C

C

T

V

C

C

T V

C

C

T

V

C

O

M

M

C

T

H

C

T

H

R V

A

G

C T

H C

T H

C T

H

C

T

H

E

E

E

C O

M M

DNAMMOCEKIRTS

AIRFORCE GLOBAL

100% DRAWING

16-1620A

Scale: 1/8" = 1'-0"

DEMOLITION PLAN

Scale: 1/8" = 1'-0"

CONSTRUCTION PLAN

N

R E G

I O

N A L

N

R E G

I O

N A L

KEYED NOTES:

1. DEMO FIRE ALARM ELECTRICAL FROM MAF TO NEW TIE-IN. FIRE ALARM ELECTRICAL FROM

PUMP HOUSE AND GARAGE WILL BE RE-ROUTED THROUGH NEW DUCT BANK BACK TO MAF.

DEMO ABANDONED CONDUITS AND PULL BOXES.

2. DISCONNECT POWER AND CONTROL WIRES TO GATE. PULL WIRES BACK TO SOURCE. DEMO

ABANDONED CONDUITS AND PULL BOXES.

3. DEMO GATE TELEPHONE ELECTRICAL FROM MAF TO NEW TIE-IN. GATE TELEPHONE WILL BE

RE-ROUTED THROUGH NEW DUCT BANK BACK TO MAF. DEMO ABANDONED CONDUITS AND PULL

BOXES.

4. DEMO CCTV CABLE AND CONDUIT FROM MAF TO NEW TIE-INS. CCTV WILL BE RE-ROUTED

THROUGH NEW DUCT BANK TO MAF. DEMO ABANDONED CONDUITS AND PULL BOXES.

5. LOCATE ELECTRICAL GROUND AND CATHODIC GROUND. MOVE IF NECESSARY TO MAKE ROOM

FOR NEW DUCT BANK AND NEW CATHODIC GROUND FROM ANTI-RAM CABLE SYSTEM.

6. PULL TEMPORARY POWER & CONTROL WIRE TO TEMPORARY GATE.

X

KEYED NOTES:

1. INSTALL NEW 1" RIGID CONDUIT FROM DUCT BANK COMMUNICATION PULL BOX AND TIE INTO

EXISTING FIRE ALARM CONDUIT. LABEL CONDUIT FIRE ALARM. PULL FIRE ALARM WIRE FROM

MAF THROUGH NEW DUCT BANK TO PUMP HOUSE AND GARAGE.

2. FOR GATE PHONE INSTALL NEW 1" RIGID CONDUIT FROM DUCT BANK COMMUNICATION PULL

BOX TO EXISTING TELEPHONE CONDUIT. PULL NEW TELEPHONE WIRE FROM COMMUNICATION

ROOM IN MAF THROUGH NEW DUCT BANK TO GATE PHONE.

3. FOR GATE POWER INSTALL (1) 1" RIGID CONDUIT FORM DUCT BANK POWER PULL BOX TO NEW

GATE OPERATOR. PULL NEW GATE POWER CABLE FROM MAF THROUGH DUCT BANK TO NEW

GATE OPERATOR.

4. FOR GATE COMMUNICATION INSTALL (1) 1" RIGID CONDUIT FROM DUCT BANK COMMUNICATION

PULL BOX TO NEW GATE OPERATOR. PULL NEW GATE COMMUNICATION CABLE FROM MAF

CONTROL PANEL THROUGH DUCT BANK TO NEW GATE OPERATOR.

5. INSTALL (2) 1" RIGID CONDUITS FROM DUCT BANK COMM PULL BOX TO CCTV DATA CONDUITS &

TO CCTV SPARE CONDUIT. PULL NEW CCTV DATA WIRE FROM COMMUNICATION ROOM IN MAF

THROUGH DUCT BANK TO CAMERAS.

6. INSTALL (2) 1" RIGID CONDUIT FROM DUCT BANK POWER PULL BOX TO CCTV POWER CONDUIT.

PULL NEW CCTV POWER WIRE FROM COMMUNICATION ROOM IN MAF THROUGH DUCT BANK TO

CAMERAS.

7. INSTALL A CATHODIC PROTECTION CABLE FROM TERMINAL POST DOWN 18" BFG ALONG POST.

THEN HORIZONTAL TO CATHODIC PROTECTION GROUNDING CABLE. ATTACH TO GROUNDING

CABLE. SEE DETAILS 1 & 5 ON DRAWING CX506.

8. INSTALL A CATHODIC PROTECTION CABLE FROM TERMINAL POST TO BOLLARD POST. SEE

DETAILS 1 & 5 ON DRAWING CX506.

9. CUT AND SPLICE EXISTING CATHODIC PROTECTION #2 CABLE AND EXTEND AS NECESSARY TO

ROUTE UNDER NEW DUCT BANK. INTERCEPT CABLE AND CONNECT PER DETAIL 5 ON DRAWING

CX506.

10. INSTALL PHOTO EYES FOR BOTH THE OPEN AND CLOSED DIRECTIONS OF TRAVEL.

11. INSTALL POST FOR PHOTO EYE PER DETAIL 3 CX-506.

12. IF UTILITY IS ENCOUNTERED WITH IN FOUNDATION AREA, SLEEVE AND POUR AROUND.

13. FOR PERSONNEL GATE POWER INSTALL (1) 1" RIGID CONDUIT FROM DUCT BANK POWER PULL

BOX TO NEW GATE OPERATOR. PULL NEW GATE POWER CABLE FROM MAF THROUGH DUCT

BANK TO NEW GATE.

14. FOR PERSONNEL GATE COMMUNICATION INSTALL (1) 1" RIGID CONDUIT FROM DUCT BANK

COMMUNICATION PULL BOX TO NEW GATE OPERATOR. PULL NEW GATE COMMUNICATION CABLE

FROM MAF CONTROL PANEL THROUGH DUCT BANK TO NEW GATE.

X

GENERAL NOTES:

1. VERIFY AND LOCATE SITE UTILITIES BEFORE

DIGGING.

2. FIELD VERIFY EXISTING CONDUIT SIZES.

3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.

4. SLFCS APPROX. 4' BFG

5. SEE CX002 FOR GENERAL PROJECT NOTES.

6. PULL BOXES ARE NOT JUNCTION BOXES. NO

SPLICES IN PULL BOXES.

Feet

0 8 16

Feet

0 8 16

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text

GLOBAL STRIKE COMMAND

AutoCAD SHX Text

MALMSTROM AIR FORCE BASE, MONTANA

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

REVIEWED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

FILE NUMBER

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

OF

AutoCAD SHX Text

MAF ANTI-RAM CABLES MALMSTROM AFB, MT

AutoCAD SHX Text

ATTACHMENT 4

AutoCAD SHX Text

FA4626-18-R-0038

AutoCAD SHX Text

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

L-01 ELECTRICAL ENTRANCE PLAN

AutoCAD SHX Text

AUG 02 2018

AutoCAD SHX Text

ES-404

ARAM

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

ARAMARAMARAMARAMARAM

ARAM

ARAM

ARAM

ARAM

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

211'-1"

ANCHOR POST

CS405

173'-2"

ES405

ARAM ARAM ARAM ARAM ARAM ARAM ARAM

285'-6"

69'-3"

T E

L

A

A

18'

N

REGIONAL

GENERAL NOTES:

1. VERIFY AND LOCATE SITE UTILITIES BEFORE DIGGING.

2. FIELD VERIFY EXISTING CONDUIT SIZES.

3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.

4. SOIL BORINGS INDICATE SANDY SILTY CLAY TO 3' BFG.,THEN SHALE MODERATELY HARD,

RED-BROWN, SLIGHTLY PLASTIC TO 5' BFG., THEN SANDSTONE, MODERATELY HARD TO 19'.

5. POWER AUGER LOG INDICATES SANDY SILTY CLAY TO 2' BFG., THEN SANDY SILTY CLAY WITH

BROKEN ROCK TO 4' BFG., THEN SHALE TO 6' BFG.

6. SLFCS APPROX. 4' BFG.

7. SEE CX002 FOR GENERAL PROJECT NOTES.

ESTIMATED ANTI-RAM CABLE SYSTEM MATERIAL QUANTITIES

TERMINAL

POST (EA)

LINE POSTS

(EA)

CABLE ASSY

(EA)

CABLE LENGTH

(FT)

REMOVABLE

BOLLARDS

(EA)

BOLLARDS

(EA)

BOLLARDS

WITH

CHANNEL

(EA)

8 25 24 21 3568 5 0 4

DNAMMOCEKIRTS

AIRFORCE GLOBAL

100% DRAWING

16-1620A

Feet

0 20 40

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

NEW

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

FT

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

& UTILITY

AutoCAD SHX Text

FURNACE

AutoCAD SHX Text

VEST

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

WEIGHT ROOM

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

RECREATION

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

DINING &

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

N-01 SITE TOPO

AutoCAD SHX Text

AUG 02 2018

AutoCAD SHX Text

AutoCAD SHX Text

CS-107

AutoCAD SHX Text

GLOBAL STRIKE COMMAND

AutoCAD SHX Text

MALMSTROM AIR FORCE BASE, MONTANA

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

REVIEWED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

FILE NUMBER

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

OF

AutoCAD SHX Text

MAF ANTI-RAM CABLES MALMSTROM AFB, MT

AutoCAD SHX Text

ATTACHMENT 4

AutoCAD SHX Text

FA4626-18-R-0038

ARAM

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

ARAMARAMARAMARAMARAM

ARAM

ARAM

ARAM

ARAM

A R

A M

A R

A M

A R

A M

A R

A M

A R

A M

211'-1"

ANCHOR POST

CS405

PERIMETER OF #4 GROUND

RADIAL SYSTEM HF TRANSMIT

ANTENNA APPROX 1'-6" BFG

E

E

E

E

173'-2"

E

E

ES405

E E

E

GATE

ARAM ARAM ARAM ARAM ARAM ARAM ARAM

285'-6"

69'-3"

NO LINE POST

WITHIN 40' OF END

TERMINAL POST

(4) BOLLARDS W/

CHANNEL

D M

D M

D M

D M

H

T

R A

B

H

T

R A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H T

R A

B

H

T

R

A

B

H

T R

A

B

H

T

R

A

B

H

T

R

A

B

H

T R

A B

H T

R

A B

H

T

R

A

B

H T

R A

B

H

T

R

A

B

H

T

R A

B

H

T

R A

B

H

T

R

A

B

HTR

AB

HTR

AB

HTR

AB

HTR

ABHTR

AB

H

T

R

A

B

H

T

R

A

B

H T

R

A B

H T

R

A B

HTR

AB

H T

R A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

HTR

AB

H

T

R

A

B

H

T

R

A

B

H T

R

A B

HTR

AB

H

T

R

A

B

H

T

R

A

B

H T

R

A B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T R

A

B

H

T

R

A

B

HTR

AB HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

HTR

AB

HTR

AB

HTR

AB

HTR

AB

HTR

AB

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

S S

A B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S S

A B

S

A

N

S

A

N

S

A

N

S A

N

S A

N

S A

N

T

T

E

E

E

E

F

L

M

F

L

M

F

L

M

F

L

M

FUEL

AB

F U

E L

A B

F U

E L

A B

F U

E L

A B

E

A

B

E

A

B

E

A

B

C

P

G R

N D

G R

N D

F O

F O

F O

H

I

C

S

H

I

C

S

H I C

S

H I C

S

H I C

S

H I C

S

H

I C

S

H

I C

S

H

I

C

S

H

I C

S

H I C

S

H

I C

S

H I C

S

H

I C

S

RVA

G

R V

A

G

RVA

G

R V

A

G

RVA

R

V

A R

V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R

V

A

G

R

V

A

G

RVA

G

RVA

G

RVA

G

R

V

A

G

R

V

A

G

R

V

A

G

R

V

A

G

R

V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

R V

A

G

RVA

G

RVA

G

RVA

G

RVA

G

W T

H R

W T

H R

W T

H R

W T

H R

WTHR

G

WTHR

G

WTHR

G

WTHR

G

W

T

H

R

G

W

T

H

R

G

W

T

H

R

G

W

T

H

R

G

W

T

H

R

G

W

T

H

R G

W

T

H

R G

W

T

H

R

G

W

T

H

R

W T

H R

W T

H R

W T

H R

W T

H R

W T

H R

WTHR

WTHR

WTHR

WTHR

WTHR

W

T

H

R

W

T

H

R

W

T

H

R

W

T

H

R

W

T H

R

W

T H

R

C P

C

P

CP

C O

M M

A B

C

O

M

M

A

B

EF

EF

EFEF

EF EF

EF

EF

EF

EF

EF

EF

EF

EF

SS

W

W

M

W

S

L

F

C

S

D M

D M

D M

S

L

F

C

S

E

E

E

FIB

E

R

F

IB

E R

F

IB

E R

F

I B

E

R

F

I

B

E

R

E

E

E

S

A

N

M

W

T E

L

C P

C P

C P

G R

N D

G R

N D

C P

C

P

C

P

E E E E E E E E E E

E E

E E

E E

E E

E

E

CCTV

CCTV CCTV CCTV CCTV

CCTV

F F

F F

F F

F F

F

F

M

E

E

C

N

M

E

E

C

N

M

E

E

C

N

M

E

E

C

N

M

E

E

C

N

M

E

E

C

N

M

E

E

C

N

M

E

E

C

N

S

L

F

C

S

S

L

F

C

S

A

A

C P

C

P

GATE PHONE

F

F F

F

F

F

M

E

E

C

N

M

E

E

C

N

M

E

E

C

N

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H

T

R

A

B

H T

R

A B

H

T

R

A

B

H

T

R

A

B

H T

R

A B

H T

R

A B

H T

R

A B

H T

R

A B

H T

R

A B

E

E

E

E

S

A

N

C

T H

18'

CTH

CTH

POWER PULL

BOX

COMMUNICATION

PULL BOX

POWER PULL

BOX

COMMUNICATION

PULL BOX

(5) REMOVABLE

BOLLARDS

DUCT BANK

E

N

REGIONAL

GENERAL NOTES:

1. VERIFY AND LOCATE SITE UTILITIES BEFORE DIGGING.

2. FIELD VERIFY EXISTING CONDUIT SIZES.

3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.

4. SOIL BORINGS INDICATE SANDY SILTY CLAY TO 3' BFG.,THEN SHALE MODERATELY HARD,

RED-BROWN, SLIGHTLY PLASTIC TO 5' BFG., THEN SANDSTONE, MODERATELY HARD TO 19'.

5. POWER AUGER LOG INDICATES SANDY SILTY CLAY TO 2' BFG., THEN SANDY SILTY CLAY WITH

BROKEN ROCK TO 4' BFG., THEN SHALE TO 6' BFG.

6. SLFCS APPROX. 4' BFG.

7. SEE CX002 FOR GENERAL PROJECT NOTES.

ESTIMATED ANTI-RAM CABLE SYSTEM MATERIAL QUANTITIES

TERMINAL

POST (EA)

LINE POSTS

(EA)

CABLE ASSY

(EA)

CABLE LENGTH

(FT)

REMOVABLE

BOLLARDS

(EA)

BOLLARDS

(EA)

BOLLARDS

WITH

CHANNEL

(EA)

8 24 21 3568 5 0 4

DNAMMOCEKIRTS

AIRFORCE GLOBAL

100% DRAWING

16-1620A

Feet

0 20 40

AutoCAD SHX Text

4" PVC DRAIN

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

NEW

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

FT

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

& UTILITY

AutoCAD SHX Text

FURNACE

AutoCAD SHX Text

VEST

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

WEIGHT ROOM

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

RECREATION

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

DINING &

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

CP

AutoCAD SHX Text

MEECN ANTENNA

AutoCAD SHX Text

DUAL MODE/UHF ANTENNA

AutoCAD SHX Text

ABANDONED HTR TRANSMIT ANTENNA

AutoCAD SHX Text

ABANDONED HTR RECEIVE ANTENNA

AutoCAD SHX Text

WEATHER STATION ANTENNA

AutoCAD SHX Text

RAIN GAUGE

AutoCAD SHX Text

RVA TOWER

AutoCAD SHX Text

SLFCS ANTENNA

AutoCAD SHX Text

ABANDONED SOFT ANTENNA

AutoCAD SHX Text

PRESUMED TO RUN INTO ROOM 101 OR 103

AutoCAD SHX Text

PRESUMED TO RUN INTO THE 101 OR 103 ROOM

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text Ec

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

N-01 SITE PLAN

AutoCAD SHX Text

AUG 02 2018

AutoCAD SHX Text

AutoCAD SHX Text

CS-108

AutoCAD SHX Text

GLOBAL STRIKE COMMAND

AutoCAD SHX Text

MALMSTROM AIR FORCE BASE, MONTANA

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

REVIEWED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

FILE NUMBER

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

OF

AutoCAD SHX Text

MAF ANTI-RAM CABLES MALMSTROM AFB, MT

AutoCAD SHX Text

ATTACHMENT 4

AutoCAD SHX Text

FA4626-18-R-0038

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S S

A B

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S A

N

S A

N

S A

N

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F U

E L

A B

F U

E L

A B

FUEL

AB

FUEL

AB

FUEL

AB

FUEL

AB

F U

E L

A B

F U

E L

A B

F U

E L

A B

F U

E L

A B

F U

E L

A B

F U

E L

A B

FUEL

AB

F O

F O

F O

F O

F O

F O

F O

R

V

A

R

V

A

R

V

A

R

V

A

W

T

H

R

W

T

H

R

M

W

N G

A S

N G

A S

ARAM

ARAM

ARAM

C

X

C

X

ARAM ARAM

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S

S

A

B

S S

A B

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S

A

N

S A

N

S A

N

S A

N

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F

L

M

F U

E L

A B

F U

E L

A B

FUEL

AB

FUEL

AB

FUEL

AB

FUEL

AB

F U

E L

A B

F U

E L

A B

F U

E L

A B

F U

E L

A B

F U

E L

A B

F U

E L

A B

FUEL

AB

F O

F O

F O

F O

F O

F O

F O

R

V

A

R

V

A

R

V

A

R

V

A

W

T

H

R

W

T

H

R

M

W

N G

A S

N G

A S

N

R E G

IO

N

A L

Scale: 1/8" = 1'-0"

DEMOLITION PLAN

N

R E G

IO

N

A L

Scale: 1/8" = 1'-0"

CONSTRUCTION PLAN

KEYED NOTES:

1. SAW CUT ASPHALT IF APPLICABLE AND DIG TO AVOID GROUNDING SYSTEM.

COORDINATE WITH ELECTRICAL.

2. SAW CUT ASPHALT. MAINTAIN ONE LANE OF TRAFFIC. CUT AND DEMOLISH

ABANDON FUEL OIL PIPING AND CONDUIT.

3. SAW CUT CONCRETE CURB. PREPARE SURFACES FOR PATCHING.

4. DEMO GATE OPERATOR ENCLOSURE. COORDINATE WITH ELECTRICAL TO

DEENERGIZE. DEMOLISH CONCRETE SLAB AND REMOVE FROM SITE.

5. SAW CUT AND DEMOLISH CURB FOR NEW STANCHION BASE.

6. DEMOLISH GATE. TURN OVER TO OWNER. MAINTAIN ONE LANE OF TRAFFIC.

7. DEMOLISH EXISTING STANCHION.

8. INSTALL TEMPORARY GATE. GATE SHALL BE FURNISHED BY GOVERNMENT.

TEMP GATE INSTALLED BEFORE EXISTING GATE IS DEMOLISHED.

9. INSTALL TEMPORARY FENCE. SEE DRAWING CX506 FOR DETAILS.

10. SAWCUT AND REMOVE ASPHALT.

11. IF THE FUEL LEAK MONITORING PIPING IS ENCOUNTERED IT WILL NEED TO BE

RELOCATED AROUND DUCT BANK.

X

KEYED NOTES:

1. INSTALL PULL BOXES. SEE DETAIL 4 CX-505 FOR DEPTH. SURROUND WITH

ENGINEERED FILL.

2. INSTALL DUCT BANK. SEE DETAILS CX-505. SURROUND WITH ENGINEERED FILL.

3. PATCH ASPHALT TO MEET MAXIMUM GATE CLEARANCE OF 5". MAINTAIN SAME

GRADE ON TIE-IN OF EXISTING.

4. PATCH CURB. SEE DETAIL 4 CX-506.

5. INSTALL NEW GATE OPERATOR FOUNDATION. COORDINATE WITH ELECTRICAL

AND SEE DETAILS CX-504.

6. INSTALL GATE. MAXIMUM GATE CLEARANCE 5" TO SOLID SURFACES AND 2" TO

DIRT. CENTER DISTANCE BETWEEN GATE STANCHIONS WITH CENTER OF ROAD.

SEE DETAILS CX-503 & CX-504.

7. INSTALL NEW GATE FOOTING FOUNDATION. SEE DETAILS CX-504.

8. INSTALL REMOVABLE BOLLARDS. 4 FT O.C. NO CONNECTING CHANNEL. SEE

DETAIL 2 CX-506.

9. INSTALL CONCRETE FILLED BOLLARDS. 5 FT O.C. WITH CONNECTING CHANNEL.

SEE DETAILS 3 & 4 CX-502.

10. INSTALL NEW PERSONNEL GATE. SEE DETAILS CX-508.

11. DO NOT INSTALL LINE POSTS WITHIN 40 FT OF END TERMINAL POST.

12. REINSTALL FENCE FROM NEW GATE TO EXISTING FENCE. MAXIMUM 5" OPEN

SPACE. SEE DETAILS CX-507.

X

GENERAL NOTES:

1. VERIFY AND LOCATE SITE UTILITIES BEFORE

DIGGING.

2. FIELD VERIFY EXISTING CONDUIT SIZES.

3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.

4. SLFCS APPROX. 4' BFG

5. SEE CX002 FOR GENERAL PROJECT NOTES.

6. PULL BOXES ARE NOT JUNCTION BOXES. NO

SPLICES IN PULL BOXES.

DNAMMOCEKIRTS

AIRFORCE GLOBAL

100% DRAWING

16-1620A

Feet

0 8 16

Feet

0 8 16

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

SLFCS ANTENNA

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

SLFCS ANTENNA

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

N-01 CIVIL ENTRANCE PLAN

AutoCAD SHX Text

AUG 02 2018

AutoCAD SHX Text

AutoCAD SHX Text

CS-405

AutoCAD SHX Text

GLOBAL STRIKE COMMAND

AutoCAD SHX Text

MALMSTROM AIR FORCE BASE, MONTANA

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

REVIEWED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

FILE NUMBER

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

OF

AutoCAD SHX Text

MAF ANTI-RAM CABLES MALMSTROM AFB, MT

AutoCAD SHX Text

ATTACHMENT 4

AutoCAD SHX Text

FA4626-18-R-0038

File details come from the government source that posted it. Updated .