This set of construction drawings and specifications is for an anti-ram cable system at Malmstrom Air Force Base in Montana. The project involves demolishing an existing gate and installing a new gate, fencing, bollards, pull boxes, and underground utilities including a duct bank for power, communications, fire alarm, and CCTV cables. The drawings show the site demolition and construction plans, details for concrete foundations, bollards, gates and associated hardware. Specifications require installing 8 terminal posts, 24 line posts, and over 3,500 feet of cable along with related materials. Electrical work includes routing fire alarm, telephone, power and low-voltage cables to the new gate and cameras via pull boxes and conduits in the duct bank.
Amended Drawings Part 3
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
115'-7"
CS404
T
Y P
A R
A M
A R
A M
A R
A M
ARAM
ARAM
ARAM
ARAM ARAM ARAM ARAM ARAM ARAM ARAM ARAM
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
ANTIRAM CABLE SYSTEM
(3'-6" FROM EXISTING FENCE TYP)
ANCHOR POST
ES404
269'-2"
192'-3"
HICS
H
IC
S
H
IC
S
H
IC
S
H
IC
S
H
IC
S
H
IC
S
HICS
H
IC
S
H
IC
S
HICS HICS
H
I
C
S
S A
N
T
T
E
E
F U
E L
A B
F U
E L
A B
FUEL
AB
FUEL
AB
F U
E L
A B
FUEL
AB
E
E
E
E E E E
E
E
F
E E E
E
E
C
T
H
C
T
H
C
T H
C
T
H
FOFO
F O
FOFO
F O
C
C
T V
C
C
T
V
C
C
T
V
C
C
T
V
C
C
T V
C
C
T
V
C
C
T
V
C
C
T
V
C
C
T V
C C
T V
C C
T V
P B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H T
R
A B
H
T
R A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H T
R
A B
H
T
RA
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H T
R A
B
H
T
R
A
B
H
T
R
A
B
WTHR
WTHR
WTHR
WTHR
WTHR
WTHR
WTHR
W
T
H
R
W
T
H
R
W
T
H
R
W
T
H
R
W
T
H
R
W
T
H
R
W
T
H
R
W
T
H
R
WTHR
G WTHR
G
WTHR
G
WTHR
G WTHR
G WTHR
G
W
T
H
R G
W
T
H
R
G
W
T
H
R G
W
T
H
R
G
W
T
H
R
G
W
T
H
R
G
W
T
H
R
G
W T
H R
G W
T H
R
G
COMM
AB
COMM
AB
COMM
AB
COMM
AB
COMM
AB
COMM
AB
COMM
AB
COMM
AB
R
V
A
RVA
R V
A
R V
A
RVA
G
R V
A
G
RVA
G
RVA
G
R V
A
G
R
V
A
RVA
R V
A
R V
A
R
V
A
G
R
V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
RVA
G
SAN
SAN
GRND
GRND
G
R
N
D
G R
N D
G R
N D
G
R
N
D
E
F
S
S
W
W
M
W
M
W
W
D W
D W
E
F
IB
E R
E
E
E
E
E
E
E
E
E
F
I B
E
R
F
I B
E
R
F I B
E
R
N
G
A
S
SAN
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
122115114
121116
110A
103A103
102101
M
E
E
C
N
MEECN
MEECN
MEECN
MEECN
D
M
D M
N G
A S
N
G
A
S
NGAS
NGAS
NGAS
N
G
A
S
N
G
A
S
N
G
A
S
N
G
A
S
N
G
A S
N G
A S
N G
A S
N
G
A
S
N
G
A
S
N G
AS
N G
AS
NGAS
192'-3"
C
T
H
C
T
H
CTH
DW
M
W
M
W
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
ARAM
ARAM
ARAMARAM
ARAM
ARAM
FO
E E
ARAM
ARAMARAM
ARAM
ARAMARAM
C
T
H
C T
H C
T H
NO LINE POST
WITHIN 40' OF
TERMINAL POST
(5) REMOVABLE
BOLLARDS
GATE
(4) BOLLARDS
W/ CHANNEL
POWER
PULL BOX
COMMUNICATION
PULL BOX
DUCT BANK
POWER
PULL BOX
COMMUNICATION
PULL BOX
GATE PHONE
POSITION OF GATE MAY
NEED TO BE ADJUSTED
DEPENDING ON LOCATION
AND DEPTH OF EXISTING
UTILITIES
E
C O
M M
N
R E G
I O
N A L
GENERAL NOTES:
1. VERIFY AND LOCATE SITE UTILITIES BEFORE DIGGING.
2. FIELD VERIFY EXISTING CONDUIT SIZES.
3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.
4. SOIL BORINGS INDICATE SANDY CLAY, BROWN, LEAN TO 2'
BFG.,THEN SILTY SAND WIH SHALE FRAGMENTS TO 10'.
5. POWER AUGER LOG INDICATES SAND, CLAY DARK BROWN TO 2'
BFG, THEN SILTY SAND LIGHT GRAY TO 6' BFG.
6. SLFCS APPROX 4' BFG
7. SEE CX002 FOR GENERAL PROJECT NOTES
ESTIMATED ANTI-RAM CABLE SYSTEM MATERIAL QUANTITIES
TERMINAL
POST (EA)
LINE POSTS
(EA)
CABLE ASSY
(EA)
CABLE LENGTH
(FT)
REMOVABLE
BOLLARDS
(EA)
BOLLARDS
(EA)
BOLLARDS
WITH
CHANNEL
(EA)
9 23 24 3500 5 0 4
DNAMMOCEKIRTS
AIRFORCE GLOBAL
100% DRAWING
16-1620A
Feet
0 20 40
AutoCAD SHX Text
RVA TOWER
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
NEW
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
FT
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
& UTILITY
AutoCAD SHX Text
FURNACE
AutoCAD SHX Text
VEST
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
WEIGHT ROOM
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
RECREATION
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
DINING &
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
CLEAN
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
DUAL MODE/UHF ANTENNA
AutoCAD SHX Text
WEATHER STATION ANTENNA
AutoCAD SHX Text
RAIN GAUGE
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text
EP&T
AutoCAD SHX Text
MEECN ANTENNA
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
L-01 SITE PLAN
AutoCAD SHX Text
AUG 02 2018
AutoCAD SHX Text
AutoCAD SHX Text
CS-106
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
AutoCAD SHX Text
MALMSTROM AIR FORCE BASE, MONTANA
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
FILE NUMBER
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
OF
AutoCAD SHX Text
MAF ANTI-RAM CABLES MALMSTROM AFB, MT
AutoCAD SHX Text
ATTACHMENT 4
AutoCAD SHX Text
FA4626-18-R-0038
AutoCAD SHX Text
S A
N
S A
N
FUEL
AB
F U
E L
A B
F U
E L
A B
F U
E L
A B
F U
E L
A B
FUEL
AB
FUEL
AB
FUEL
AB
F U
E L
A B
F U
E L
A B
F U
E L
A B
FUEL
AB
FUEL
AB
FUEL
AB
FOFOFOFOFO
F O
F O
FOFOFOFO
F O
F O
H
T
R
AB
HTR
AB
HTR
AB
HTR
H
T R
A
B
H
T
R
A
B
HTR
AB
HTR
AB
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
W
T
H
R
COMM
AB
COMM
AB
R V
A
R V
A
SAN
S
S
M
W
M
W
D W
D W
D W
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
102101
M
E
E
C
N
M
E
E
C
N
MEECN
MEECN
D M
N
G
A
S
N
G
A
S
N G
A S
N G
A S
N
G
A
S
N
G
A S
N
G
A S
N G
A S
DW
FOFO
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
C X
C
X
S A
N
S A
N
FUEL
AB
F U
E L
A B
F U
E L
A B
F U
E L
A B
F U
E L
A B
FUEL
AB
FUEL
AB
FUEL
AB
F U
E L
A B
F U
E L
A B
F U
E L
A B
FUEL
AB
FUEL
AB
FUEL
AB
FOFOFOFOFO
F O
F O
FOFOFOFO
F O
F O
H
T
R
AB
HTR
AB
HTR
AB
H
T R
A
B
H
T
R
A
B
HTR
AB
HTR
AB
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
W
T
H
R
COMM
AB
COMM
AB
R V
A
R V
A
SAN
S
S
M
W
M
W
D W
D W
D W
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
102101
M
E
E
C
N
M
E
E
C
N
MEECN
MEECN
D M
N
G
A
S
N
G
A
S
N G
A S
N G
A S
N
G
A
S
N
G
A S
N
G
A S
N G
A S
DW
FOFO
DNAMMOCEKIRTS
AIRFORCE GLOBAL
100% DRAWING
16-1620A
Scale: 1/8" = 1'-0"
DEMOLITION PLAN
Scale: 1/8" = 1'-0"
CONSTRUCTION PLAN
N
R E G
I O
N A L
N
R E G
I O
N A L
KEYED NOTES:
1. SAW CUT ASPHALT IF APPLICABLE AND DIG TO AVOID GROUNDING SYSTEM.
COORDINATE WITH ELECTRICAL.
2. SAW CUT ASPHALT. MAINTAIN ONE LANE OF TRAFFIC. CUT AND DEMOLISH
ABANDON FUEL OIL PIPING AND CONDUIT.
3. SAW CUT CONCRETE CURB. PREPARE SURFACES FOR PATCHING.
4. SAVE AND RE-USE ROCK MULCH.
5. DEMO GATE OPERATOR ENCLOSURE. COORDINATE WITH ELECTRICAL TO
DEENERGIZE. DEMOLISH CONCRETE SLAB AND REMOVE FROM SITE.
6. SAW CUT AND DEMOLISH CURB FOR NEW STANCHION BASE.
7. DEMOLISH GATE. TURN OVER TO OWNER. MAINTAIN ONE LANE OF TRAFFIC.
8. DEMOLISH EXISTING STANCHION.
9. INSTALL TEMPORARY GATE. GATE SHALL BE FURNISHED BY GOVERNMENT.
TEMP GATE INSTALLED BEFORE EXISTING GATE IS DEMOLISHED.
10. INSTALL TEMPORARY FENCE. SEE DRAWING CX506 FOR DETAILS.
11. SAWCUT AND REMOVE ASPHALT.
X
KEYED NOTES:
1. INSTALL PULL BOXES. SEE DETAIL 4 CX-505 FOR DEPTH. SURROUND WITH
ENGINEERED FILL.
2. INSTALL DUCT BANK. SEE DETAILS CX-505. SURROUND WITH ENGINEERED FILL.
3. PATCH ASPHALT TO MEET MAXIMUM GATE CLEARANCE OF 5". MAINTAIN SAME
GRADE ON TIE-IN OF EXISTING.
4. PATCH CURB. SEE DETAIL 4 CX-506.
5. INSTALL NEW GATE OPERATOR FOUNDATION. COORDINATE WITH ELECTRICAL
AND SEE DETAILS CX-504
6. INSTALL GATE. MAXIMUM GATE CLEARANCE 5" TO SOLID SURFACES AND 2" TO
DIRT. CENTER DISTANCE BETWEEN GATE STANCHIONS WITH CENTER OF ROAD.
SEE TAILS CX-503 & CX-504.
7. INSTALL NEW GATE FOOTING FOUNDATION. SEE DETAILS CX-504
8. INSTALL REMOVABLE BOLLARDS. 4 FT O.C. NO CONNECTING CHANNEL. SEE
DETAIL 2 CX-506
9. INSTALL CONCRETE FILLED BOLLARDS. 5 FT O.C. WITH CONNECTING CHANNEL.
SEE DETAILS 3 & 4 CX-502
10. INSTALL NEW PERSONNEL GATE. SEE DETAILS CX-508.
11. DO NOT INSTALL LINE POSTS WITHIN 40 FT OF END TERMINAL POST.
12. REINSTALL FENCE FROM NEW GATE TO EXISTING FENCE. MAXIMUM 5" OPEN
SPACE. SEE DETAILS CX-507.
13. POSITION OF GATE MAY NEED TO BE ADJUSTED DEPENDING ON LOCATION AND
DEPTH OF EXISTING UTILITY.
X
GENERAL NOTES:
1. VERIFY AND LOCATE SITE UTILITIES BEFORE
DIGGING.
2. FIELD VERIFY EXISTING CONDUIT SIZES.
3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.
4. SLFCS APPROX. 4' BFG
5. SEE CX002 FOR GENERAL PROJECT NOTES.
6. PULL BOXES ARE NOT JUNCTION BOXES. NO
SPLICES IN PULL BOXES.
Feet
0 8 16
Feet
0 8 16
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
AutoCAD SHX Text
MALMSTROM AIR FORCE BASE, MONTANA
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
FILE NUMBER
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
OF
AutoCAD SHX Text
MAF ANTI-RAM CABLES MALMSTROM AFB, MT
AutoCAD SHX Text
ATTACHMENT 4
AutoCAD SHX Text
FA4626-18-R-0038
AutoCAD SHX Text
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
L-01 CIVIL ENTRANCE PLAN
AutoCAD SHX Text
AUG 02 2018
AutoCAD SHX Text
CS-404
H
IC
S
H
IC
S
H
IC
S
H
IC
S
H
I
C
S
H
IC
S
H
IC
S
H
IC
S
H
IC
S
H
I
C
S
HICS HICS
H
IC
S
H
IC
S
H
IC
S
H
I
C
S
HICS HICS
HICS
HICS
H
I
C
S
T
T
T
T
E
E
E
E
E
E
E
E
E
E E E E E E
E
E
E
E
F
F
F
F
F F
F F
F
F
F
E E E E E E
E
E
E
E
E
CCTV
C
C
T
V
C
C
T
V
C
C
T
V
C
C
T
V
C
T
H
C
T
H
C
T
H
CTH
C
T
H
CTH
C
T
H
FOFOFOFOFO
F O
F O
FOFOFOFO
F O
F O
CCTV
C
C
T V
C
C
T V
C
C
T V
C
C
T V
CCTV
C
C
T V
C
C
T V
C
C
T V
C
C
T V
CCTV
C
C
T V
C
C
T V
C
C
T V
C
C
T V
C C
T V
P B
P B
C C
T V
C C
T V
H
T
R
AB
HTR
AB
HTR
AB
H
T
R
A
B
H
T
R
A
B
HTR
AB
HTR
AB
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R A
B
W
T
H
R
COMM
AB
COMM
AB
R V
A
RVA
G RVA
G
R V
A
R
V
A
G
R V
A
G R
V A
G R
V A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
RVA
G
RVA
G
RVA
G
GRND
GRND
GRND
G
R
N
D
G
R
N
D
G R
N D
G R
N D
G R
N D
G
R
N
D
G R
N D
T
E
L
C
O
M
M
C
O
M
M
E
E
F
IB
E R
F
I
B
E
R
E
E
E
E
E
E
E
E
E
E
E
F
I B
E
R
F
I
B
E
R
F
I B
E
R
102101
M
E
E
C
N
M
E
E
C
N
MEECN
MEECN
D M
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
FOFO
TEL
T E
L
T E
L
E E E E
E
E
C O
M M
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
H
IC
S
H
IC
S
H
IC
S
H
IC
S
H
I
C
S
H
IC
S
H
IC
S
H
IC
S
H
IC
S
H
I
C
S
HICS HICS
H
IC
S
H
IC
S
H
IC
S
H
I
C
S
HICS
HICS HICS
HICS
H
I
C
S
T
T
T
T
E
E
E
E
E
E
E
E
E
E E E E E E
E
E
E
E
F
F
E E E E E E
E
E
E
E
E
C
C
T
V
C
T
H
C
T
H
C
T
H
CTH
C
T
H
CTH
C
T
H
FOFOFOFOFO
F O
F O
FOFOFOFO
F O
F O
C
C
T V
C
C
T V
C
C
T V
C
C
T V
C
C
T V
C C
T V
P B
H
T
R
AB
HTR
AB
HTR
AB
HTR
H
T R
A
B
H
T
R
A
B
HTR
AB
HTR
AB
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R A
B
W
T
H
R
COMM
AB
COMM
AB
R V
A
RVA
G RVA
G
R V
A
R
V
A
G
R V
A
G R
V A
G
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
RVA
G
RVA
G
RVA
G
GRND
GRND
GRND
G
R
N
D
G
R
N
D
G R
N D
G R
N D
G R
N D
G
R
N
D
G R
N D
F
IB
E R
F
I
B
E
R
E
E
E
E
E
E
E
E
E
E
E
F
I B
E
R
F
I
B
E
R
F
I B
E
R
102101
M
E
E
C
N
M
E
E
C
N
MEECN
MEECN
D M
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
S
L
F
C
S
FOFO
TEL
E E E E
F
T
E
L
C
C
T V
C
C
T
V
C
C
T
V
C
C
T V
C
C
T
V
C
O
M
M
C
T
H
C
T
H
R V
A
G
C T
H C
T H
C T
H
C
T
H
E
E
E
C O
M M
DNAMMOCEKIRTS
AIRFORCE GLOBAL
100% DRAWING
16-1620A
Scale: 1/8" = 1'-0"
DEMOLITION PLAN
Scale: 1/8" = 1'-0"
CONSTRUCTION PLAN
N
R E G
I O
N A L
N
R E G
I O
N A L
KEYED NOTES:
1. DEMO FIRE ALARM ELECTRICAL FROM MAF TO NEW TIE-IN. FIRE ALARM ELECTRICAL FROM
PUMP HOUSE AND GARAGE WILL BE RE-ROUTED THROUGH NEW DUCT BANK BACK TO MAF.
DEMO ABANDONED CONDUITS AND PULL BOXES.
2. DISCONNECT POWER AND CONTROL WIRES TO GATE. PULL WIRES BACK TO SOURCE. DEMO
ABANDONED CONDUITS AND PULL BOXES.
3. DEMO GATE TELEPHONE ELECTRICAL FROM MAF TO NEW TIE-IN. GATE TELEPHONE WILL BE
RE-ROUTED THROUGH NEW DUCT BANK BACK TO MAF. DEMO ABANDONED CONDUITS AND PULL
BOXES.
4. DEMO CCTV CABLE AND CONDUIT FROM MAF TO NEW TIE-INS. CCTV WILL BE RE-ROUTED
THROUGH NEW DUCT BANK TO MAF. DEMO ABANDONED CONDUITS AND PULL BOXES.
5. LOCATE ELECTRICAL GROUND AND CATHODIC GROUND. MOVE IF NECESSARY TO MAKE ROOM
FOR NEW DUCT BANK AND NEW CATHODIC GROUND FROM ANTI-RAM CABLE SYSTEM.
6. PULL TEMPORARY POWER & CONTROL WIRE TO TEMPORARY GATE.
X
KEYED NOTES:
1. INSTALL NEW 1" RIGID CONDUIT FROM DUCT BANK COMMUNICATION PULL BOX AND TIE INTO
EXISTING FIRE ALARM CONDUIT. LABEL CONDUIT FIRE ALARM. PULL FIRE ALARM WIRE FROM
MAF THROUGH NEW DUCT BANK TO PUMP HOUSE AND GARAGE.
2. FOR GATE PHONE INSTALL NEW 1" RIGID CONDUIT FROM DUCT BANK COMMUNICATION PULL
BOX TO EXISTING TELEPHONE CONDUIT. PULL NEW TELEPHONE WIRE FROM COMMUNICATION
ROOM IN MAF THROUGH NEW DUCT BANK TO GATE PHONE.
3. FOR GATE POWER INSTALL (1) 1" RIGID CONDUIT FORM DUCT BANK POWER PULL BOX TO NEW
GATE OPERATOR. PULL NEW GATE POWER CABLE FROM MAF THROUGH DUCT BANK TO NEW
GATE OPERATOR.
4. FOR GATE COMMUNICATION INSTALL (1) 1" RIGID CONDUIT FROM DUCT BANK COMMUNICATION
PULL BOX TO NEW GATE OPERATOR. PULL NEW GATE COMMUNICATION CABLE FROM MAF
CONTROL PANEL THROUGH DUCT BANK TO NEW GATE OPERATOR.
5. INSTALL (2) 1" RIGID CONDUITS FROM DUCT BANK COMM PULL BOX TO CCTV DATA CONDUITS &
TO CCTV SPARE CONDUIT. PULL NEW CCTV DATA WIRE FROM COMMUNICATION ROOM IN MAF
THROUGH DUCT BANK TO CAMERAS.
6. INSTALL (2) 1" RIGID CONDUIT FROM DUCT BANK POWER PULL BOX TO CCTV POWER CONDUIT.
PULL NEW CCTV POWER WIRE FROM COMMUNICATION ROOM IN MAF THROUGH DUCT BANK TO
CAMERAS.
7. INSTALL A CATHODIC PROTECTION CABLE FROM TERMINAL POST DOWN 18" BFG ALONG POST.
THEN HORIZONTAL TO CATHODIC PROTECTION GROUNDING CABLE. ATTACH TO GROUNDING
CABLE. SEE DETAILS 1 & 5 ON DRAWING CX506.
8. INSTALL A CATHODIC PROTECTION CABLE FROM TERMINAL POST TO BOLLARD POST. SEE
DETAILS 1 & 5 ON DRAWING CX506.
9. CUT AND SPLICE EXISTING CATHODIC PROTECTION #2 CABLE AND EXTEND AS NECESSARY TO
ROUTE UNDER NEW DUCT BANK. INTERCEPT CABLE AND CONNECT PER DETAIL 5 ON DRAWING
CX506.
10. INSTALL PHOTO EYES FOR BOTH THE OPEN AND CLOSED DIRECTIONS OF TRAVEL.
11. INSTALL POST FOR PHOTO EYE PER DETAIL 3 CX-506.
12. IF UTILITY IS ENCOUNTERED WITH IN FOUNDATION AREA, SLEEVE AND POUR AROUND.
13. FOR PERSONNEL GATE POWER INSTALL (1) 1" RIGID CONDUIT FROM DUCT BANK POWER PULL
BOX TO NEW GATE OPERATOR. PULL NEW GATE POWER CABLE FROM MAF THROUGH DUCT
BANK TO NEW GATE.
14. FOR PERSONNEL GATE COMMUNICATION INSTALL (1) 1" RIGID CONDUIT FROM DUCT BANK
COMMUNICATION PULL BOX TO NEW GATE OPERATOR. PULL NEW GATE COMMUNICATION CABLE
FROM MAF CONTROL PANEL THROUGH DUCT BANK TO NEW GATE.
X
GENERAL NOTES:
1. VERIFY AND LOCATE SITE UTILITIES BEFORE
DIGGING.
2. FIELD VERIFY EXISTING CONDUIT SIZES.
3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.
4. SLFCS APPROX. 4' BFG
5. SEE CX002 FOR GENERAL PROJECT NOTES.
6. PULL BOXES ARE NOT JUNCTION BOXES. NO
SPLICES IN PULL BOXES.
Feet
0 8 16
Feet
0 8 16
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
AutoCAD SHX Text
MALMSTROM AIR FORCE BASE, MONTANA
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
FILE NUMBER
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
OF
AutoCAD SHX Text
MAF ANTI-RAM CABLES MALMSTROM AFB, MT
AutoCAD SHX Text
ATTACHMENT 4
AutoCAD SHX Text
FA4626-18-R-0038
AutoCAD SHX Text
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
L-01 ELECTRICAL ENTRANCE PLAN
AutoCAD SHX Text
AUG 02 2018
AutoCAD SHX Text
ES-404
ARAM
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
ARAMARAMARAMARAMARAM
ARAM
ARAM
ARAM
ARAM
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
211'-1"
ANCHOR POST
CS405
173'-2"
ES405
ARAM ARAM ARAM ARAM ARAM ARAM ARAM
285'-6"
69'-3"
T E
L
A
A
18'
N
REGIONAL
GENERAL NOTES:
1. VERIFY AND LOCATE SITE UTILITIES BEFORE DIGGING.
2. FIELD VERIFY EXISTING CONDUIT SIZES.
3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.
4. SOIL BORINGS INDICATE SANDY SILTY CLAY TO 3' BFG.,THEN SHALE MODERATELY HARD,
RED-BROWN, SLIGHTLY PLASTIC TO 5' BFG., THEN SANDSTONE, MODERATELY HARD TO 19'.
5. POWER AUGER LOG INDICATES SANDY SILTY CLAY TO 2' BFG., THEN SANDY SILTY CLAY WITH
BROKEN ROCK TO 4' BFG., THEN SHALE TO 6' BFG.
6. SLFCS APPROX. 4' BFG.
7. SEE CX002 FOR GENERAL PROJECT NOTES.
ESTIMATED ANTI-RAM CABLE SYSTEM MATERIAL QUANTITIES
TERMINAL
POST (EA)
LINE POSTS
(EA)
CABLE ASSY
(EA)
CABLE LENGTH
(FT)
REMOVABLE
BOLLARDS
(EA)
BOLLARDS
(EA)
BOLLARDS
WITH
CHANNEL
(EA)
8 25 24 21 3568 5 0 4
DNAMMOCEKIRTS
AIRFORCE GLOBAL
100% DRAWING
16-1620A
Feet
0 20 40
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
NEW
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
FT
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
& UTILITY
AutoCAD SHX Text
FURNACE
AutoCAD SHX Text
VEST
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
WEIGHT ROOM
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
RECREATION
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
DINING &
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
CLEAN
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
N-01 SITE TOPO
AutoCAD SHX Text
AUG 02 2018
AutoCAD SHX Text
AutoCAD SHX Text
CS-107
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
AutoCAD SHX Text
MALMSTROM AIR FORCE BASE, MONTANA
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
FILE NUMBER
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
OF
AutoCAD SHX Text
MAF ANTI-RAM CABLES MALMSTROM AFB, MT
AutoCAD SHX Text
ATTACHMENT 4
AutoCAD SHX Text
FA4626-18-R-0038
ARAM
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
ARAMARAMARAMARAMARAM
ARAM
ARAM
ARAM
ARAM
A R
A M
A R
A M
A R
A M
A R
A M
A R
A M
211'-1"
ANCHOR POST
CS405
PERIMETER OF #4 GROUND
RADIAL SYSTEM HF TRANSMIT
ANTENNA APPROX 1'-6" BFG
E
E
E
E
173'-2"
E
E
ES405
E E
E
GATE
ARAM ARAM ARAM ARAM ARAM ARAM ARAM
285'-6"
69'-3"
NO LINE POST
WITHIN 40' OF END
TERMINAL POST
(4) BOLLARDS W/
CHANNEL
D M
D M
D M
D M
H
T
R A
B
H
T
R A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H T
R A
B
H
T
R
A
B
H
T R
A
B
H
T
R
A
B
H
T
R
A
B
H
T R
A B
H T
R
A B
H
T
R
A
B
H T
R A
B
H
T
R
A
B
H
T
R A
B
H
T
R A
B
H
T
R
A
B
HTR
AB
HTR
AB
HTR
AB
HTR
ABHTR
AB
H
T
R
A
B
H
T
R
A
B
H T
R
A B
H T
R
A B
HTR
AB
H T
R A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
HTR
AB
H
T
R
A
B
H
T
R
A
B
H T
R
A B
HTR
AB
H
T
R
A
B
H
T
R
A
B
H T
R
A B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T R
A
B
H
T
R
A
B
HTR
AB HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
HTR
AB
HTR
AB
HTR
AB
HTR
AB
HTR
AB
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
S S
A B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S S
A B
S
A
N
S
A
N
S
A
N
S A
N
S A
N
S A
N
T
T
E
E
E
E
F
L
M
F
L
M
F
L
M
F
L
M
FUEL
AB
F U
E L
A B
F U
E L
A B
F U
E L
A B
E
A
B
E
A
B
E
A
B
C
P
G R
N D
G R
N D
F O
F O
F O
H
I
C
S
H
I
C
S
H I C
S
H I C
S
H I C
S
H I C
S
H
I C
S
H
I C
S
H
I
C
S
H
I C
S
H I C
S
H
I C
S
H I C
S
H
I C
S
RVA
G
R V
A
G
RVA
G
R V
A
G
RVA
R
V
A R
V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R
V
A
G
R
V
A
G
RVA
G
RVA
G
RVA
G
R
V
A
G
R
V
A
G
R
V
A
G
R
V
A
G
R
V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
R V
A
G
RVA
G
RVA
G
RVA
G
RVA
G
W T
H R
W T
H R
W T
H R
W T
H R
WTHR
G
WTHR
G
WTHR
G
WTHR
G
W
T
H
R
G
W
T
H
R
G
W
T
H
R
G
W
T
H
R
G
W
T
H
R
G
W
T
H
R G
W
T
H
R G
W
T
H
R
G
W
T
H
R
W T
H R
W T
H R
W T
H R
W T
H R
W T
H R
WTHR
WTHR
WTHR
WTHR
WTHR
W
T
H
R
W
T
H
R
W
T
H
R
W
T
H
R
W
T H
R
W
T H
R
C P
C
P
CP
C O
M M
A B
C
O
M
M
A
B
EF
EF
EFEF
EF EF
EF
EF
EF
EF
EF
EF
EF
EF
SS
W
W
M
W
S
L
F
C
S
D M
D M
D M
S
L
F
C
S
E
E
E
FIB
E
R
F
IB
E R
F
IB
E R
F
I B
E
R
F
I
B
E
R
E
E
E
S
A
N
M
W
T E
L
C P
C P
C P
G R
N D
G R
N D
C P
C
P
C
P
E E E E E E E E E E
E E
E E
E E
E E
E
E
CCTV
CCTV CCTV CCTV CCTV
CCTV
F F
F F
F F
F F
F
F
M
E
E
C
N
M
E
E
C
N
M
E
E
C
N
M
E
E
C
N
M
E
E
C
N
M
E
E
C
N
M
E
E
C
N
M
E
E
C
N
S
L
F
C
S
S
L
F
C
S
A
A
C P
C
P
GATE PHONE
F
F F
F
F
F
M
E
E
C
N
M
E
E
C
N
M
E
E
C
N
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H
T
R
A
B
H T
R
A B
H
T
R
A
B
H
T
R
A
B
H T
R
A B
H T
R
A B
H T
R
A B
H T
R
A B
H T
R
A B
E
E
E
E
S
A
N
C
T H
18'
CTH
CTH
POWER PULL
BOX
COMMUNICATION
PULL BOX
POWER PULL
BOX
COMMUNICATION
PULL BOX
(5) REMOVABLE
BOLLARDS
DUCT BANK
E
N
REGIONAL
GENERAL NOTES:
1. VERIFY AND LOCATE SITE UTILITIES BEFORE DIGGING.
2. FIELD VERIFY EXISTING CONDUIT SIZES.
3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.
4. SOIL BORINGS INDICATE SANDY SILTY CLAY TO 3' BFG.,THEN SHALE MODERATELY HARD,
RED-BROWN, SLIGHTLY PLASTIC TO 5' BFG., THEN SANDSTONE, MODERATELY HARD TO 19'.
5. POWER AUGER LOG INDICATES SANDY SILTY CLAY TO 2' BFG., THEN SANDY SILTY CLAY WITH
BROKEN ROCK TO 4' BFG., THEN SHALE TO 6' BFG.
6. SLFCS APPROX. 4' BFG.
7. SEE CX002 FOR GENERAL PROJECT NOTES.
ESTIMATED ANTI-RAM CABLE SYSTEM MATERIAL QUANTITIES
TERMINAL
POST (EA)
LINE POSTS
(EA)
CABLE ASSY
(EA)
CABLE LENGTH
(FT)
REMOVABLE
BOLLARDS
(EA)
BOLLARDS
(EA)
BOLLARDS
WITH
CHANNEL
(EA)
8 24 21 3568 5 0 4
DNAMMOCEKIRTS
AIRFORCE GLOBAL
100% DRAWING
16-1620A
Feet
0 20 40
AutoCAD SHX Text
4" PVC DRAIN
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
NEW
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
FT
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
& UTILITY
AutoCAD SHX Text
FURNACE
AutoCAD SHX Text
VEST
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
WEIGHT ROOM
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
RECREATION
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
DINING &
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
CLEAN
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
CP
AutoCAD SHX Text
MEECN ANTENNA
AutoCAD SHX Text
DUAL MODE/UHF ANTENNA
AutoCAD SHX Text
ABANDONED HTR TRANSMIT ANTENNA
AutoCAD SHX Text
ABANDONED HTR RECEIVE ANTENNA
AutoCAD SHX Text
WEATHER STATION ANTENNA
AutoCAD SHX Text
RAIN GAUGE
AutoCAD SHX Text
RVA TOWER
AutoCAD SHX Text
SLFCS ANTENNA
AutoCAD SHX Text
ABANDONED SOFT ANTENNA
AutoCAD SHX Text
PRESUMED TO RUN INTO ROOM 101 OR 103
AutoCAD SHX Text
PRESUMED TO RUN INTO THE 101 OR 103 ROOM
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text Ec
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
N-01 SITE PLAN
AutoCAD SHX Text
AUG 02 2018
AutoCAD SHX Text
AutoCAD SHX Text
CS-108
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
AutoCAD SHX Text
MALMSTROM AIR FORCE BASE, MONTANA
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
FILE NUMBER
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
OF
AutoCAD SHX Text
MAF ANTI-RAM CABLES MALMSTROM AFB, MT
AutoCAD SHX Text
ATTACHMENT 4
AutoCAD SHX Text
FA4626-18-R-0038
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S S
A B
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S A
N
S A
N
S A
N
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F U
E L
A B
F U
E L
A B
FUEL
AB
FUEL
AB
FUEL
AB
FUEL
AB
F U
E L
A B
F U
E L
A B
F U
E L
A B
F U
E L
A B
F U
E L
A B
F U
E L
A B
FUEL
AB
F O
F O
F O
F O
F O
F O
F O
R
V
A
R
V
A
R
V
A
R
V
A
W
T
H
R
W
T
H
R
M
W
N G
A S
N G
A S
ARAM
ARAM
ARAM
C
X
C
X
ARAM ARAM
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S
S
A
B
S S
A B
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S A
N
S A
N
S A
N
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F
L
M
F U
E L
A B
F U
E L
A B
FUEL
AB
FUEL
AB
FUEL
AB
FUEL
AB
F U
E L
A B
F U
E L
A B
F U
E L
A B
F U
E L
A B
F U
E L
A B
F U
E L
A B
FUEL
AB
F O
F O
F O
F O
F O
F O
F O
R
V
A
R
V
A
R
V
A
R
V
A
W
T
H
R
W
T
H
R
M
W
N G
A S
N G
A S
N
R E G
IO
N
A L
Scale: 1/8" = 1'-0"
DEMOLITION PLAN
N
R E G
IO
N
A L
Scale: 1/8" = 1'-0"
CONSTRUCTION PLAN
KEYED NOTES:
1. SAW CUT ASPHALT IF APPLICABLE AND DIG TO AVOID GROUNDING SYSTEM.
COORDINATE WITH ELECTRICAL.
2. SAW CUT ASPHALT. MAINTAIN ONE LANE OF TRAFFIC. CUT AND DEMOLISH
ABANDON FUEL OIL PIPING AND CONDUIT.
3. SAW CUT CONCRETE CURB. PREPARE SURFACES FOR PATCHING.
4. DEMO GATE OPERATOR ENCLOSURE. COORDINATE WITH ELECTRICAL TO
DEENERGIZE. DEMOLISH CONCRETE SLAB AND REMOVE FROM SITE.
5. SAW CUT AND DEMOLISH CURB FOR NEW STANCHION BASE.
6. DEMOLISH GATE. TURN OVER TO OWNER. MAINTAIN ONE LANE OF TRAFFIC.
7. DEMOLISH EXISTING STANCHION.
8. INSTALL TEMPORARY GATE. GATE SHALL BE FURNISHED BY GOVERNMENT.
TEMP GATE INSTALLED BEFORE EXISTING GATE IS DEMOLISHED.
9. INSTALL TEMPORARY FENCE. SEE DRAWING CX506 FOR DETAILS.
10. SAWCUT AND REMOVE ASPHALT.
11. IF THE FUEL LEAK MONITORING PIPING IS ENCOUNTERED IT WILL NEED TO BE
RELOCATED AROUND DUCT BANK.
X
KEYED NOTES:
1. INSTALL PULL BOXES. SEE DETAIL 4 CX-505 FOR DEPTH. SURROUND WITH
ENGINEERED FILL.
2. INSTALL DUCT BANK. SEE DETAILS CX-505. SURROUND WITH ENGINEERED FILL.
3. PATCH ASPHALT TO MEET MAXIMUM GATE CLEARANCE OF 5". MAINTAIN SAME
GRADE ON TIE-IN OF EXISTING.
4. PATCH CURB. SEE DETAIL 4 CX-506.
5. INSTALL NEW GATE OPERATOR FOUNDATION. COORDINATE WITH ELECTRICAL
AND SEE DETAILS CX-504.
6. INSTALL GATE. MAXIMUM GATE CLEARANCE 5" TO SOLID SURFACES AND 2" TO
DIRT. CENTER DISTANCE BETWEEN GATE STANCHIONS WITH CENTER OF ROAD.
SEE DETAILS CX-503 & CX-504.
7. INSTALL NEW GATE FOOTING FOUNDATION. SEE DETAILS CX-504.
8. INSTALL REMOVABLE BOLLARDS. 4 FT O.C. NO CONNECTING CHANNEL. SEE
DETAIL 2 CX-506.
9. INSTALL CONCRETE FILLED BOLLARDS. 5 FT O.C. WITH CONNECTING CHANNEL.
SEE DETAILS 3 & 4 CX-502.
10. INSTALL NEW PERSONNEL GATE. SEE DETAILS CX-508.
11. DO NOT INSTALL LINE POSTS WITHIN 40 FT OF END TERMINAL POST.
12. REINSTALL FENCE FROM NEW GATE TO EXISTING FENCE. MAXIMUM 5" OPEN
SPACE. SEE DETAILS CX-507.
X
GENERAL NOTES:
1. VERIFY AND LOCATE SITE UTILITIES BEFORE
DIGGING.
2. FIELD VERIFY EXISTING CONDUIT SIZES.
3. FIELD VERIFY DIMENSIONS AND CONDUIT SPLICES.
4. SLFCS APPROX. 4' BFG
5. SEE CX002 FOR GENERAL PROJECT NOTES.
6. PULL BOXES ARE NOT JUNCTION BOXES. NO
SPLICES IN PULL BOXES.
DNAMMOCEKIRTS
AIRFORCE GLOBAL
100% DRAWING
16-1620A
Feet
0 8 16
Feet
0 8 16
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
SLFCS ANTENNA
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
SLFCS ANTENNA
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
N-01 CIVIL ENTRANCE PLAN
AutoCAD SHX Text
AUG 02 2018
AutoCAD SHX Text
AutoCAD SHX Text
CS-405
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
AutoCAD SHX Text
MALMSTROM AIR FORCE BASE, MONTANA
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
FILE NUMBER
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
OF
AutoCAD SHX Text
MAF ANTI-RAM CABLES MALMSTROM AFB, MT
AutoCAD SHX Text
ATTACHMENT 4
AutoCAD SHX Text
FA4626-18-R-0038
File details come from the government source that posted it. Updated .