This document is a submittal schedule for a federal construction contract to add anti-ram cables at a missile site. The schedule lists 74 required technical submittals grouped by construction phase, including items such as concrete mix designs, welding procedures, structural steel drawings, electrical system components, vehicle barrier installations, and active barrier systems. The contractor must submit certifications, shop drawings, samples, catalogs, test results and other documentation for review and approval on dates ranging from 10 to 30 days prior to construction milestones. The related solicitation is for anti-ram cable installations and was issued by the Air Force Global Strike Command. The schedule provides detailed requirements for submittals to ensure the contractor delivers quality materials and workmanship in compliance with the contract specifications and completion dates.

Attachment 2: Submittal Schedule

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Add Anti-Ram Cables FA4626-19-R-A009

AF Form 66 02:

Attch 2, anti-ram sub sch PH2-8/20/2018

SS-1

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-19-R-A009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

O

D

TE

(B

Y

C

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

ED

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

SI

LE

EN

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

ES

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

1 GENERAL REQUIREMENTS 01 00 00 - 3.6.3 project Construction Work Schedule/ Gantt chart

4 20d

ANTP

2 GENERAL REQUIREMENTS 01 00 00 - 3.6.4 Weekly Construction Work Schedule 4 Weekly

* Tenative Work Schedule at Pre-Performance Meeting

3 GENERAL REQUIREMENTS 01 00 00 - 3.6.5 Pre Work Briefing to USAF Leadership 4 20d

ANTP

4 GENERAL REQUIREMENTS 01 00 00 - 3.8 Start of Work Notification 4 10d

PTSW

5 GENERAL REQUIREMENTS 01 00 00 - 3.11 Utility Outages 4 10d

PTO

6 GENERAL REQUIREMENTS 01 00 00 - 3.13.2 Quality Control Plan 4 10d

ANTP

7 GENERAL REQUIREMENTS 01 00 00 - 3.13.5 Quality Control Records 1 EWD

8 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.17.5 As-Built Drawings RED LINES 2 10d AFI

9 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.17.6 As-Built Drawings (Autocad and PDF formats) 2 30d AFI AutoCAD CD

10 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.

O&M Manuals 4 30d AFI

11 GENERAL REQUIREMENTS 01 00 00 - 3.28 Notice of Final Inspection 4 3d PTFI

GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.23 Contruction Near Utilities, Work Clearance Request (AF Form 103)

4 3d PTO

13 GENERAL REQUIREMENTS 01 00 00 - 3.27.1

Confined Space Plan 4 30d

PTFP

Number of Copies Required

NZAS 16-6020A Add Anti-ram Cables

02:

Attch 2, anti-ram sub sch PH2-8/20/2018

SS-2

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-19-R-A009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020A Add Anti-ram Cables

14 ENVIRONMENTAL PROTECTION 01 36 00 - 2.3

Dewatering Discharge Permit 4 15d

PTSW

15 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1

Hazardous Materials List Attachment 5 4 10d

SRO

16 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1

Hazardous Materials List Attachment 5 4 10d

SRO

17 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.4

Hazmat Final Report 4 PTFA

18 CAST-IN-PLACE CONCRETE 03 30 00- 1.3.1.1

Concrete Mix Design 4 15 d

ANTP

19 CAST-IN-PLACE CONCRETE 03 30 00- 1.3.2 Concrete Mix Design Lab Tests 4 15 d

ANTP

20 CAST-IN-PLACE CONCRETE 03 30 00- 2.1.5 Fiber Expansion Joint 4 15 d

ANTP

21 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1

Fresh Concrete tests 4 15 d

ANTP

22 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1

Compressive Break Tests 4 15 d

ANTP

23 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1

Compressive Break Tests 4 15 d

ANTP

24 FLOWABLE FILL 03 31 00 - 1.3.2. Mix Design 4 15 d

ANTP

25 PLANT PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE 03 40 00.00 10 1.3 - Quality Assurance 4 15 d

ANTP

26 PLANT PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE 03 40 00.00 10 1.3.2.4 - Test Results 4 15 d

ANTP

PLANT PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE 03 40 00.00 10 2.1.1 - Standard Precast Units

4 15 d

ANTP

02:

Attch 2, anti-ram sub sch PH2-8/20/2018

SS-3

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-19-R-A009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020A Add Anti-ram Cables

28 WELDING 05 05 33 1.2 -Welding Quality Assurance Plan 4 15 d

ANTP

29 WELDING 05 05 33 1.2 -Welding Procedure Qualifications 4 15 d

ANTP

30 WELDING 05 05 33 1.2 -Welder, Welding Operator, and Tacker Qualification 4 15 d

ANTP

31 WELDING 05 05 33 1.2 -Inspector Qualification 4 15 d

ANTP

32 WELDING 05 05 33 1.2 -Previous Qualifications 4 15 d

ANTP

33 WELDING 05 05 33 1.2 -Pre-Qualified Procedures 4 15 d

ANTP

34 WELDING 05 05 33 1.2.1 -Welding Electrodes and Rods 4 15 d

ANTP

35 WELDING 05 05 33 1.2.1-Nondestructive Testing 4 15 d

ANTP

36 WELDING 05 05 33 1.2.1-Certified Welding Procedure Specifications (WPS) 4 15 d

ANTP

37 WELDING 05 05 33 1.2.1-Certified Procedure Qualification Records (PQR) 4 15 d

ANTP

38 WELDING 05 05 33 1.2.1-Certified Welder Performance Qualifications (WPQ) 4 15 d

ANTP

39 Structural Steel 05 12 00 1.2 - Fabrication Drawings 4 15 d

ANTP

40 Structural Steel 05 12 00 1.2 - Galvanizing touchup 4 15 d

ANTP

41 Structural Steel 05 12 00 1.2 - Test Reports for Weld Inspection Reports 4 15 d

02:

Attch 2, anti-ram sub sch PH2-8/20/2018

SS-4

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-19-R-A009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020A Add Anti-ram Cables

42 Structural Steel 05 12 00 1.2 - Embrittlement Test Reports 4 15 d

ANTP

43 Structural Steel 05 12 00 1.2 - Steel Certificates 4 15 d

ANTP

44 Structural Steel 05 12 00 1.2 - Bolts, nuts, and washers Certificates 4 15 d

ANTP

45 Structural Steel 05 12 00 1.2 - Galvanizing Certificates 4 15 d

ANTP

46 Structural Steel 05 12 00 1.2 - Welding electrodes and rods Certificates 4 15 d

ANTP

47 Electrical Power Conductors and Cables 26 05 19 Product Data Conductors, insulations, Splices 4 15 d

ANTP

48 Electrical Grounding and Bonding 26 05 26 Product Data Conductors, insulations, Connectors 4 15 d

ANTP

Electrical Hanger and Supports 26 05 29 Product Data metal and non-metal slotted support systems and components, equipment supports

4 15 d

ANTP

Raceways and Boxes for Electrical Systems 26 05 33 Product Data wire ways, fittings, floor boxes, enclosures, covers

4 15 d

ANTP

Raceways and Boxes for Electrical Systems 26 05 33 Shop drawings for duct bank and pull boxes (see precast section)

4 15 d

ANTP

52 Cathodic Protection 26 42 00 Product data for cables, cable identification, connection types 4 15 d

ANTP

53 Cathodic Protection 26 42 00 Shop Drawings for post connections and attachements to existing system 4 15 d

ANTP

54 EXCAVATION & TRENCHING 31 21 00 - 2.1

Underground Marker tape 4 15 d

ANTP

55 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.1

Crushed Gravel Material Properties 4 15 d

02:

Attch 2, anti-ram sub sch PH2-8/20/2018

SS-5

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-19-R-A009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020A Add Anti-ram Cables

56 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.2

Plant Mix Gravel 4 15 d

ANTP

57 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.3

Asphalt Cement 4 15 d

ANTP

58 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.4

Tack Coat 4 15 d

ANTP

59 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.5

Asphalt Mix Design 4 15 d

ANTP

60 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.6

Quality Control Test Results 4 ATT

61 FENCING & PERSONNEL GATE 32 31 13.53

Technical data, installation instructions 4 15 d

ANTP

62 Vehicle Crash Barriers 34 71 13.16 - 1.1 Bollards, C-channel 4 15 d

ANTP

63 4 15 d

ANTP

64 Vehicle Crash Barriers 34 71 13.16 - 1.1 Cable 4 15 d

ANTP

65 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage Fitting, Swage Machine. 4 4 15 d

ANTP

66 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage quality tools (1 set) and tolerances 1 4 15 d

ANTP

67 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage terminal end manufacturing instructions 4 15 d

ANTP

68 Vehicle Crash Barriers 34 71 13.16 - 1.1 Grips, Thimbles, and Turnbuckles

15 d

ANTP

69 Active Vehicle Barriers 34 71 13.19 - 1.5 Installation, Equipment, Electrical Work Shop Drawings 4 15 d

02:

Attch 2, anti-ram sub sch PH2-8/20/2018

SS-6

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-19-R-A009

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020A Add Anti-ram Cables

70 Active Vehicle Barriers 34 71 13.19 - 1.5 Barrier System Product data 4 15 d

ANTP

71 Active Vehicle Barriers 34 71 13.19 - 1.5 Spare Parts Product Data 4 15 d

ANTP

72 Active Vehicle Barriers 34 71 13.19 - 1.5 Fielding Testing 4 15 d

ANTP

73 Active Vehicle Barriers 34 71 13.19 - 1.5 Barrier System Operation and Maintenance Data 4 15 d

ANTP

74 Active Vehicle Barriers 34 71 13.19 - 1.5 Barrier System Operation and Maintenance Instructions 4 15 d

ANTP

Schedule of Abbreviations:

AWC = After Work Completed = Before Material Delivery

PTSW = Prior to Starting Work SN = Advance Notification

AFA = After Final Acceptance SRO = After Each Occurrence

PTO = Prior to Outage PTFI = Prior to Final Inspection

PTNP = Prior to Notice to Proceed PTFP = Prior to Final Payment

ANTP = After Notice to Proceed PTCW = Prior to Completing Work

EWD = Each work day AF Form 3000 not required AFI = After Final Inspection

PTFA = Prior to Final Acceptance PT = Prior To

ACA = After Contract Award PSS = Per Submittal Schedule