This document is a submittal schedule for a federal construction contract to add anti-ram cables at a missile site. The schedule lists 74 required technical submittals grouped by construction phase, including items such as concrete mix designs, welding procedures, structural steel drawings, electrical system components, vehicle barrier installations, and active barrier systems. The contractor must submit certifications, shop drawings, samples, catalogs, test results and other documentation for review and approval on dates ranging from 10 to 30 days prior to construction milestones. The related solicitation is for anti-ram cable installations and was issued by the Air Force Global Strike Command. The schedule provides detailed requirements for submittals to ensure the contractor delivers quality materials and workmanship in compliance with the contract specifications and completion dates.
Attachment 2: Submittal Schedule
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 Add Anti-Ram Cables FA4626-19-R-A009
AF Form 66 02:
Attch 2, anti-ram sub sch PH2-8/20/2018
SS-1
REQUIRED TECHNICAL SUBMITTALS
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-19-R-A009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
R
EC
O
M M
EN
D
A
TI
O N
S
M A
N U
FA
C
TU
R
W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R U
C
TI
O N
S
N O
TI
FI
C A
TI
O
N
O
TH
ER
R
EQ
U
IR
ED
S
U
BM
IS
SI
O
D
TE
(B
Y
C
N
TR
A C
TO
R
D A
TE
R
EC
EI
V
ED
N
TR
A C
TI
N
G
D A
TE
T
O M
IS
SI
LE
EN
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
TO
ES
U
BM
IT
TA
L
FI
N
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS-
APPROVED
1 GENERAL REQUIREMENTS 01 00 00 - 3.6.3 project Construction Work Schedule/ Gantt chart
4 20d
ANTP
2 GENERAL REQUIREMENTS 01 00 00 - 3.6.4 Weekly Construction Work Schedule 4 Weekly
* Tenative Work Schedule at Pre-Performance Meeting
3 GENERAL REQUIREMENTS 01 00 00 - 3.6.5 Pre Work Briefing to USAF Leadership 4 20d
ANTP
4 GENERAL REQUIREMENTS 01 00 00 - 3.8 Start of Work Notification 4 10d
PTSW
5 GENERAL REQUIREMENTS 01 00 00 - 3.11 Utility Outages 4 10d
PTO
6 GENERAL REQUIREMENTS 01 00 00 - 3.13.2 Quality Control Plan 4 10d
ANTP
7 GENERAL REQUIREMENTS 01 00 00 - 3.13.5 Quality Control Records 1 EWD
8 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.17.5 As-Built Drawings RED LINES 2 10d AFI
9 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.17.6 As-Built Drawings (Autocad and PDF formats) 2 30d AFI AutoCAD CD
10 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.
O&M Manuals 4 30d AFI
11 GENERAL REQUIREMENTS 01 00 00 - 3.28 Notice of Final Inspection 4 3d PTFI
GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.23 Contruction Near Utilities, Work Clearance Request (AF Form 103)
4 3d PTO
13 GENERAL REQUIREMENTS 01 00 00 - 3.27.1
Confined Space Plan 4 30d
PTFP
Number of Copies Required
NZAS 16-6020A Add Anti-ram Cables
02:
Attch 2, anti-ram sub sch PH2-8/20/2018
SS-2
REQUIRED TECHNICAL SUBMITTALS
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-19-R-A009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
O
M M
EN
D
A
TI
O N
S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
N O
TI
FI
C A
TI
O
N
O
TH
ER
R
EQ
U
IR
ED
S
U
BM
IS
SI
N
TR
A C
TO
R
D A
TE
R
EC
EI
V
N
TR
A C
TI
N
G
D A
TE
T
O M
IS
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
BM
IT
TA
L
FI
N
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS-
APPROVED
Number of Copies Required
NZAS 16-6020A Add Anti-ram Cables
14 ENVIRONMENTAL PROTECTION 01 36 00 - 2.3
Dewatering Discharge Permit 4 15d
PTSW
15 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1
Hazardous Materials List Attachment 5 4 10d
SRO
16 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1
Hazardous Materials List Attachment 5 4 10d
SRO
17 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.4
Hazmat Final Report 4 PTFA
18 CAST-IN-PLACE CONCRETE 03 30 00- 1.3.1.1
Concrete Mix Design 4 15 d
ANTP
19 CAST-IN-PLACE CONCRETE 03 30 00- 1.3.2 Concrete Mix Design Lab Tests 4 15 d
ANTP
20 CAST-IN-PLACE CONCRETE 03 30 00- 2.1.5 Fiber Expansion Joint 4 15 d
ANTP
21 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1
Fresh Concrete tests 4 15 d
ANTP
22 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1
Compressive Break Tests 4 15 d
ANTP
23 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1
Compressive Break Tests 4 15 d
ANTP
24 FLOWABLE FILL 03 31 00 - 1.3.2. Mix Design 4 15 d
ANTP
25 PLANT PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE 03 40 00.00 10 1.3 - Quality Assurance 4 15 d
ANTP
26 PLANT PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE 03 40 00.00 10 1.3.2.4 - Test Results 4 15 d
ANTP
PLANT PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE 03 40 00.00 10 2.1.1 - Standard Precast Units
4 15 d
ANTP
02:
Attch 2, anti-ram sub sch PH2-8/20/2018
SS-3
REQUIRED TECHNICAL SUBMITTALS
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-19-R-A009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
O
M M
EN
D
A
TI
O N
S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
N O
TI
FI
C A
TI
O
N
O
TH
ER
R
EQ
U
IR
ED
S
U
BM
IS
SI
N
TR
A C
TO
R
D A
TE
R
EC
EI
V
N
TR
A C
TI
N
G
D A
TE
T
O M
IS
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
BM
IT
TA
L
FI
N
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS-
APPROVED
Number of Copies Required
NZAS 16-6020A Add Anti-ram Cables
28 WELDING 05 05 33 1.2 -Welding Quality Assurance Plan 4 15 d
ANTP
29 WELDING 05 05 33 1.2 -Welding Procedure Qualifications 4 15 d
ANTP
30 WELDING 05 05 33 1.2 -Welder, Welding Operator, and Tacker Qualification 4 15 d
ANTP
31 WELDING 05 05 33 1.2 -Inspector Qualification 4 15 d
ANTP
32 WELDING 05 05 33 1.2 -Previous Qualifications 4 15 d
ANTP
33 WELDING 05 05 33 1.2 -Pre-Qualified Procedures 4 15 d
ANTP
34 WELDING 05 05 33 1.2.1 -Welding Electrodes and Rods 4 15 d
ANTP
35 WELDING 05 05 33 1.2.1-Nondestructive Testing 4 15 d
ANTP
36 WELDING 05 05 33 1.2.1-Certified Welding Procedure Specifications (WPS) 4 15 d
ANTP
37 WELDING 05 05 33 1.2.1-Certified Procedure Qualification Records (PQR) 4 15 d
ANTP
38 WELDING 05 05 33 1.2.1-Certified Welder Performance Qualifications (WPQ) 4 15 d
ANTP
39 Structural Steel 05 12 00 1.2 - Fabrication Drawings 4 15 d
ANTP
40 Structural Steel 05 12 00 1.2 - Galvanizing touchup 4 15 d
ANTP
41 Structural Steel 05 12 00 1.2 - Test Reports for Weld Inspection Reports 4 15 d
02:
Attch 2, anti-ram sub sch PH2-8/20/2018
SS-4
REQUIRED TECHNICAL SUBMITTALS
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-19-R-A009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
O
M M
EN
D
A
TI
O N
S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
N O
TI
FI
C A
TI
O
N
O
TH
ER
R
EQ
U
IR
ED
S
U
BM
IS
SI
N
TR
A C
TO
R
D A
TE
R
EC
EI
V
N
TR
A C
TI
N
G
D A
TE
T
O M
IS
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
BM
IT
TA
L
FI
N
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS-
APPROVED
Number of Copies Required
NZAS 16-6020A Add Anti-ram Cables
42 Structural Steel 05 12 00 1.2 - Embrittlement Test Reports 4 15 d
ANTP
43 Structural Steel 05 12 00 1.2 - Steel Certificates 4 15 d
ANTP
44 Structural Steel 05 12 00 1.2 - Bolts, nuts, and washers Certificates 4 15 d
ANTP
45 Structural Steel 05 12 00 1.2 - Galvanizing Certificates 4 15 d
ANTP
46 Structural Steel 05 12 00 1.2 - Welding electrodes and rods Certificates 4 15 d
ANTP
47 Electrical Power Conductors and Cables 26 05 19 Product Data Conductors, insulations, Splices 4 15 d
ANTP
48 Electrical Grounding and Bonding 26 05 26 Product Data Conductors, insulations, Connectors 4 15 d
ANTP
Electrical Hanger and Supports 26 05 29 Product Data metal and non-metal slotted support systems and components, equipment supports
4 15 d
ANTP
Raceways and Boxes for Electrical Systems 26 05 33 Product Data wire ways, fittings, floor boxes, enclosures, covers
4 15 d
ANTP
Raceways and Boxes for Electrical Systems 26 05 33 Shop drawings for duct bank and pull boxes (see precast section)
4 15 d
ANTP
52 Cathodic Protection 26 42 00 Product data for cables, cable identification, connection types 4 15 d
ANTP
53 Cathodic Protection 26 42 00 Shop Drawings for post connections and attachements to existing system 4 15 d
ANTP
54 EXCAVATION & TRENCHING 31 21 00 - 2.1
Underground Marker tape 4 15 d
ANTP
55 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.1
Crushed Gravel Material Properties 4 15 d
02:
Attch 2, anti-ram sub sch PH2-8/20/2018
SS-5
REQUIRED TECHNICAL SUBMITTALS
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-19-R-A009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
O
M M
EN
D
A
TI
O N
S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
N O
TI
FI
C A
TI
O
N
O
TH
ER
R
EQ
U
IR
ED
S
U
BM
IS
SI
N
TR
A C
TO
R
D A
TE
R
EC
EI
V
N
TR
A C
TI
N
G
D A
TE
T
O M
IS
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
BM
IT
TA
L
FI
N
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS-
APPROVED
Number of Copies Required
NZAS 16-6020A Add Anti-ram Cables
56 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.2
Plant Mix Gravel 4 15 d
ANTP
57 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.3
Asphalt Cement 4 15 d
ANTP
58 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.4
Tack Coat 4 15 d
ANTP
59 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.5
Asphalt Mix Design 4 15 d
ANTP
60 ASPHALT CONCRETE PAVEMENT 32 10 00 - 1.1.6
Quality Control Test Results 4 ATT
61 FENCING & PERSONNEL GATE 32 31 13.53
Technical data, installation instructions 4 15 d
ANTP
62 Vehicle Crash Barriers 34 71 13.16 - 1.1 Bollards, C-channel 4 15 d
ANTP
63 4 15 d
ANTP
64 Vehicle Crash Barriers 34 71 13.16 - 1.1 Cable 4 15 d
ANTP
65 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage Fitting, Swage Machine. 4 4 15 d
ANTP
66 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage quality tools (1 set) and tolerances 1 4 15 d
ANTP
67 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage terminal end manufacturing instructions 4 15 d
ANTP
68 Vehicle Crash Barriers 34 71 13.16 - 1.1 Grips, Thimbles, and Turnbuckles
15 d
ANTP
69 Active Vehicle Barriers 34 71 13.19 - 1.5 Installation, Equipment, Electrical Work Shop Drawings 4 15 d
02:
Attch 2, anti-ram sub sch PH2-8/20/2018
SS-6
REQUIRED TECHNICAL SUBMITTALS
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-19-R-A009
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
O
M M
EN
D
A
TI
O N
S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
N O
TI
FI
C A
TI
O
N
O
TH
ER
R
EQ
U
IR
ED
S
U
BM
IS
SI
N
TR
A C
TO
R
D A
TE
R
EC
EI
V
N
TR
A C
TI
N
G
D A
TE
T
O M
IS
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
BM
IT
TA
L
FI
N
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS-
APPROVED
Number of Copies Required
NZAS 16-6020A Add Anti-ram Cables
70 Active Vehicle Barriers 34 71 13.19 - 1.5 Barrier System Product data 4 15 d
ANTP
71 Active Vehicle Barriers 34 71 13.19 - 1.5 Spare Parts Product Data 4 15 d
ANTP
72 Active Vehicle Barriers 34 71 13.19 - 1.5 Fielding Testing 4 15 d
ANTP
73 Active Vehicle Barriers 34 71 13.19 - 1.5 Barrier System Operation and Maintenance Data 4 15 d
ANTP
74 Active Vehicle Barriers 34 71 13.19 - 1.5 Barrier System Operation and Maintenance Instructions 4 15 d
ANTP
Schedule of Abbreviations:
AWC = After Work Completed = Before Material Delivery
PTSW = Prior to Starting Work SN = Advance Notification
AFA = After Final Acceptance SRO = After Each Occurrence
PTO = Prior to Outage PTFI = Prior to Final Inspection
PTNP = Prior to Notice to Proceed PTFP = Prior to Final Payment
ANTP = After Notice to Proceed PTCW = Prior to Completing Work
EWD = Each work day AF Form 3000 not required AFI = After Final Inspection
PTFA = Prior to Final Acceptance PT = Prior To
ACA = After Contract Award PSS = Per Submittal Schedule
BMF
Sheet1
File details come from the government source that posted it. Updated .