Attach_2_Submittal_Schedule.pdf
PDF 54 KB Posted
- Attached to
- Repair LF Surface Drainage Federal contract opportunity
- Solicitation number
- FA4626-18-R-0015
About this file
Attachment 2 Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_for_LF_Surface_Drainage_Set_1.pdf | ||
| Amendment_1.pdf | ||
| Attach_5_Wage_Determinations_MT_67,_76,78.pdf | ||
| Solicitation_FA4626-18-R-0015.pdf | ||
| Attach_6_Installation_Perimeter_Access.pdf | ||
| Attach_3_Schedule_of_Drawings.pdf | ||
| Attach_1_Specifications.pdf | ||
| Attach_7_Special_Contract_Requirements.pdf | ||
| Attach_8_Past_Performance_Questionaire.pdf | ||
| Attach_4_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 LF Surface Drainage FA4626-18-R-0015
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-18-R-0015
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
W A
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
S
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N
D
T
B Y
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
N T
R A
C T
IN
G
D A
T E
T O
M
IS
S
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S U
B M
IT
T
L
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
GENERAL REQUIREMENTS 01 00 00 - 3.6.4 project
Construction Work Schedule/ Gantt chart
PTSW
GENERAL REQUIREMENTS 01 00 00 - 3.6.5 Weekly
Construction Work Schedule 4 Weekly
* Tenative Work Schedule at Pre-Performance Meeting
GENERAL REQUIREMENTS 01 00 00 - 3.8 Start of
Work Notification
10d
PTSW
GENERAL REQUIREMENTS 01 00 00 - 3.13.2 Quality
Control Plan
10d
ANTP
GENERAL REQUIREMENTS 01 00 00 - 3.13.5 Quality
Control Records
1 EWD
GENERAL REQUIREMENTS 01 00 00 - 3.13.3.6
Project Photo Documentation 3 10d AFI
GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.5
As-Built Drawings RED LINES 4 10d AFI
GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.5
As-Built Drawings (Autocad and PDF formats) 4 30d AFI
GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.5
24x36 As-Built Drawings 2 30d AFI
GENERAL REQUIREMENTS 01 00 00 - 3.27 Notice of
Final Inspection 4 3d PTFI
GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.21
Contruction Near Utilities, Work Clearance Request (AF
Form 103)
4 3d PTO
SELECTIVE SITE DEMOLITION 02 41 13 - 1.5.1.1
Schedule of Selective Demolition Activities
5d
PTCW
CAST-IN-PLACE CONCRETE 03 30 00- 1.3.1.1
Concrete Mix Design
15 d
ANTP
CAST-IN-PLACE CONCRETE 03 30 00- 1.3.2 Concrete
Mix Design Lab Tests
15 d
ANTP
Number of Copies Required
NZAS 18-6005 LF Surface Drainage
AF Form 66
02:
Submittal Schedule-3/16/2018
SS-1
REQUIRED TECHNICAL SUBMITTALS
Attachment 2 LF Surface Drainage FA4626-18-R-0015
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-18-R-0015
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
W
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
G
S
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
S
IO
D
T
B Y
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
N T
R A
C T
IN
G
D A
T E
T O
M
IS
S
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S U
B M
IT
T
L
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Number of Copies Required
NZAS 18-6005 LF Surface Drainage
EARTHWORK GEOTEXTILES 31 05 19
1.4 Submittals
10d
PTSW
EXCAVATION & TRENCHING 31 21 00 - 2.1
Underground Marker tape
15 d
ANTP
EXCAVATION & TRENCHING 31 21 00 - 2.1
Underground Marker tape
15 d
ANTP
18 SEEDING 32 92 19 - Part 3 Submittal 4 AWC
19 RIP RAP 35 31 19 - 1.4 Submittal 4 10d
PSTW
Schedule of Abbreviations:
AWC = After Work Completed = Before Material Delivery
PTSW = Prior to Starting Work SN = Advance Notification
AFA = After Final Acceptance SRO = After Each Occurrence
PTO = Prior to Outage PTFI = Prior to Final Inspection
PTNP = Prior to Notice to Proceed PTFP = Prior to Final Payment
ANTP = After Notice to Proceed PTCW = Prior to Completing Work
EWD = Each work day AF Form 3000 not required AFI = After Final Inspection
PTFA = Prior to Final Acceptance PT = Prior To
ACA = After Contract Award PSS = Per Submittal Schedule
BMF
AF Form 66
02:
Submittal Schedule-3/16/2018
SS-2
REQUIRED TECHNICAL SUBMITTALS
File details come from the government source that posted it.