3080-Layout1.pdf
PDF 77 KB Posted
- Attached to
- Continuous Water Monitoring System Federal contract opportunity
- Solicitation number
- FA4626-16-R-0013
About this file
Building 3080 Layout
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_03.pdf | ||
| Amendment_02.pdf | ||
| Amendment_01.pdf | ||
| QUESTIONS FOR FA4626.docx | DOCX document | |
| 145-Layout1.pdf | ||
| IMG_0520.JPG | JPG image | |
| IMG_0519.JPG | JPG image | |
| IMG_0521.JPG | JPG image | |
| IMG_0517.JPG | JPG image | |
| IMG_0518.JPG | JPG image | |
| IMG_0524.JPG | JPG image | |
| IMG_0516.JPG | JPG image | |
| IMG_0523.JPG | JPG image | |
| IMG_0522.JPG | JPG image | |
| Documents.pdf | ||
| Attach_5-2_Heavy_Wage_Determination.pdf | ||
| Attach_2_Material_Submittal.pdf | ||
| Solicitation.doc | DOC document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_3_Sched._Drawings.pdf | ||
| Attach_5-1_Building_Wage_Determination.pdf | ||
| Attach_6_Base_Entry.pdf | ||
| Attch_9_Subcontractor_Consent.doc | DOC document | |
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_1_Specifications.zip | ZIP file |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .