SECTION_01010_AMENDED_-_MEASUREMENT_AND_PAYMENT.pdf

PDF 69 KB Posted

Attached to
Bldg 1191 ATFP windows repair Federal contract opportunity
Solicitation number
FA4626-15-R-0011
Issued by
Department of the Air Force Global Strike Command

About this file

Spec Section 01010

View the file

Other files for this federal contract opportunity

Other files attached to Bldg 1191 ATFP windows repair, newest first.
File Type Posted
Question_and_Answer.docx DOCX document
Combined_NEW_SPECS!!!!.pdf PDF
1191_Additional_Questions.pdf PDF
SECTION_010000_AMENDED-__General_Req.pdf PDF
085113_Aluminum_Windows.pdf PDF
Amendment_1.pdf PDF
Questions_from_Site_Visit.pdf PDF
Metting_minutes.pdf PDF
Site_visit_minutes.pdf PDF
Solicitation.doc DOC document
Attach_5_Wage_Determination_Building.docx DOCX document
Attach_5_Wage_Determination_Heavy.docx DOCX document
Attach_4_Drawings.zip ZIP file
Attach_1_Specifications.zip ZIP file
Attach_6_Base_Entry_Policy_Letter.pdf PDF
Attach_3_Schedule_of_Drawings.doc DOC document
Attach_2_Material_Submital_Sch..pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR BASE PERSONNEL FAC AT/FP BLDG. 1191, NZAS 03-1015H

MALMSTROM AFB, MT. FA4626-15-R-0011

MEASUREMENT AND PAYMENT

01010-1

MEASUREMENT AND PAYMENT 01010- 1

SECTION 01010 - MEASUREMENT AND PAYMENT

The following description of work, measurement of pay quantities, and method of payment shall govern payment made to the Contractor. The wording "for furnishing all materials, plant, equipment, labor and incidentals to complete each item to an acceptable condition, including cleaning and testing," is implied to be contained in each item of work. No separate payment will be made for project coordination, submittal preparation, disposal of waste materials, locating underground utilities, materials in storage, compaction testing, material testing, traffic control, construction survey and staking, storm water control or treatment, dewatering excavations, as-built drawing preparation, quality control, permits, report preparation, emergency services notifications, or all other work necessary or incidental for completion of the project, except for the items listed below:

ITEM DESCRIPTION

0001 Repair ATFP, BLDG 1191 All labor, materials, equipment, and any other incidentals needed to improving the antiterrorist features of office “Building 1191”. Includes installation of a force protection measures to protect the building. The parking lot plan changes as a result of this project. Work to include removal and replacement of existing paving, curbing, landscaping, patch & repair of all adjacent surfaces, as per the specifications and drawings. This also shall encompass all costs associated with providing the new windows and doors within the existing facility, to include removal of existing units, patch & repair of all adjacent surfaces, as per the specifications and drawings.

0002 Bonding (not to exceed 2.5% of total bid) shall be measured and paid for per lump sum including the cost of any bonding and any other work and coordination necessary to complete this item.

1.1 PROHIBITED MATERIALS

A. Asbestos-containing materials are prohibited.

END OF SECTION 01010