SF_30_Amend_0002.pdf

PDF 18 KB Posted

Attached to
Grounds Maintenance/Synopsis FA4626-13-R-0008 Federal contract opportunity
Solicitation number
FA4626-13-R-0008
Issued by
Department of the Air Force Global Strike Command

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Grounds Maintenance/Synopsis FA4626-13-R-0008, newest first.
File Type Posted
Grounds_QA(2).docx DOCX document
Atch_1_PWS_Grounds_as_of_Amnd_0005.doc DOC document
SF30_Amnd_0005.doc DOC document
Atch_1_APP_A_Amnd_0005.docx DOCX document
Atch_1_PWS_Grounds_as_of_Amnd_0004.doc DOC document
Atch_4_Grounds_Bid_Schedule_Amnd_0004.xls XLS spreadsheet
Amendment_0004.pdf PDF
Atch_1_APP_A_Amnd_0004.docx DOCX document
Amendment_03 _Extension.pdf PDF
Atch_1_PWS_Grounds_as_of_Amnd_0002.doc DOC document
Atch_4_Grounds_Bid_Schedule_Amnd_0002.xls XLS spreadsheet
Conformed_1449_Amend_0002.pdf PDF
Grounds_QA_28_May_13.docx DOCX document
Site_Visit_Minutes_Final.pdf PDF
Atch_4_Grounds_Bid_Schedule_Amnd_01.xls XLS spreadsheet
SF30_Amd_01.pdf PDF
Atch_1_APP_C.docx DOCX document
FA4626-13-R-0008_Grounds_Maint.doc DOC document
Atch_3_Past_Perf_Questionnaire.doc DOC document
Atch_4_Grounds_Bid_Schedule.xls XLS spreadsheet
Atch_1_APP_B-2_Drainage.docx.pdf PDF
Atch_1_APP_B-1_Base.docx.pdf PDF
Atch_1_APP_A.docx DOCX document
Atch_1_APP_F.docx DOCX document
Atch_1_APP_G.docx DOCX document
Atch_1_APP_F_Irrigation_Map_03_May_13.pdf PDF
Atch_1_APP_D.docx DOCX document
Atch_1_PWS_Grounds-1May13.doc DOC document
Atch_1_APP_E.docx DOCX document
Synopsis.docx DOCX document
Capabilities_Statement.docx DOCX document
Appendix_D.docx DOCX document
Appendix_F.docx DOCX document
APPENDIX_A_-_2_Jan_13.docx DOCX document
Draft_PWS.docx DOCX document
Appendix_C.docx DOCX document
Appendix_B.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the 1449 Bid Schedule, Attachment 4 Bid Schedule and the Performance Work Statement (PWS).

A. CLINs 0002AG, 1002AG, 2002AG, 3002AG, 4002AG for Pest Control/Maintain Improved Grounds and 0002AJ, 1002AJ, 2002AJ, 3002AJ, 4002AJ for Prune Schrubs/Maintain Improved Grounds have been revised. The ordering periods have been removed and the requirements w ill now be accomplished by separate delivery orders and the orders may be issued orally.

B. Sections 1.1.8 and 1.1.10 of the PWS have been revised to include that the w ork w ill be issued via separate delivery order and orders may be issued orally.

C. Revised SF 1449 Bid Schedule, Attachment 4 Bid Schedule, and PWS are attached.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-May-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4626-13-R-0008

X 9B. DATED (SEE ITEM 11)

08-May-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-May-2013

CODE

FA4626 341ST CONTRACTING SQUADRON

7015 GODDARD DRIVE BLDG 145

MALMSTROM AFB MT 59402-6863

FA4626 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4626-13-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

SUBCLIN 0002AG

The CLIN extended description has changed from Pest Control/Maintain Improved Grounds IAW PWS para 1.1.8. Period of Performance is 1-31 Oct 13 and 1 May-30 Sep 14. to Pest Control/Maintain Improved Grounds

IAW PWS para 1.1.8. This requirement is accomplished by separate delivery order. Orders may be issued orally.

SUBCLIN 0002AJ

The CLIN extended description has changed from Prune Shrubs/Maintain Improved Grounds IAW PWS para 1.1.10. Period of Performance is 1-31 Oct 13 and 1 Apr-30 Sep 14. to Prune Shrubs/Maintain Improved

Grounds IAW PWS para 1.1.10. This requirement is accomplished by separate delivery order. Orders may be issued orally.

SUBCLIN 1002AG

para 1.1.8. Period of Performance is 1-31 Oct 14 and 1 May-30 Sep 15. to Pest Control/Maintain Improved Grounds

IAW PWS para 1.1.8. This requirement is accomplished by separate delivery order. Orders may be issued orally.

SUBCLIN 1002AJ

para 1.1.10. Period of Performance is 1-31 Oct 14 and 1 Apr-30 Sep 15. to Prune Shrubs/Maintain Improved

Grounds IAW PWS para 1.1.10. This requirement is accomplished by separate delivery order. Orders may be

SUBCLIN 2002AG

para 1.1.8. Period of Performance is 1-31 Oct 15 and 1 May-30 Sep 16. to Pest Control/Maintain Improved Grounds

IAW PWS para 1.1.8. This requirement is accomplished by separate delivery order. Orders may be issued orally.

SUBCLIN 2002AJ

para 1.1.10. Period of Performance is 1-31 Oct 15 and 1 Apr-30 Sep 16. to Prune Shrubs/Maintain Improved

Grounds IAW PWS para 1.1.10. This requirement is accomplished by separate delivery order. Orders may be

FA4626-13-R-0008

SUBCLIN 3002AG

para 1.1.8. Period of Performance is 1-31 Oct 16 and 1 May-30 Sep 17. to Pest Control/Maintain Improved Grounds

IAW PWS para 1.1.8. This requirement is accomplished by separate delivery order. Orders may be issued orally.

SUBCLIN 3002AJ

para 1.1.10. Period of Performance is 1-31 Oct 16 and 1 Apr-30 Sep 17. to Prune Shrubs/Maintain Improved

Grounds IAW PWS para 1.1.10. This requirement is accomplished by separate delivery order. Orders may be

SUBCLIN 4002AG

para 1.1.8. Period of Performance is 1-31 Oct 17 and 1 May-30 Sep 18. to Pest Control/Maintain Improved Grounds

IAW PWS para 1.1.8. This requirement is accomplished by separate delivery order. Orders may be issued orally.

SUBCLIN 4002AJ

para 1.1.10. Period of Performance is 1-31 Oct 17 and 1 Apr-30 Sep 18. to Prune Shrubs/Maintain Improved

Grounds IAW PWS para 1.1.10. This requirement is accomplished by separate delivery order. Orders may be

(End of Summary of Changes)

File details come from the government source that posted it. Updated .