Attch 2 HTHW Distribution Submittal Schedule.xls

XLS spreadsheet 35 KB Posted

Attached to
RECOVERY-- NZAS081024A - Repair High Temp Hot Water Distribution Lines
Solicitation number
FA4626-09-R-0017
Issued by

About this file

Attachment 2 Material Submittal

View the file

Other files

File Type Posted
01010.doc DOC document
FA4626-09-R-0017-0003.pdf PDF
01010.doc DOC document
M10.1.dwf DWF file
FA4626-09-R-0017-0002.pdf PDF
Question.doc DOC document
01010.doc DOC document
Attachment 5 - WD_MT080001MT2.doc DOC document
FA4626-09-R-0017-0001.pdf PDF
preproposal site visit.doc DOC document
Attch 1 SPECS.zip ZIP file
Attch 5 Wage determination.docx DOCX document
Attch 3 SCHEDULE OF DRAWINGS.doc DOC document
Solicitation.doc DOC document
Attch 4 DWFs.zip ZIP file
Attch 6 Past Perf Questionaire_ Atch 6.doc DOC document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 08-1024ARepair HTHW Distribution Ph 6 Area AFA4626-09-R-0017
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 1 - GENERAL REQUIREMENTS
1As Built Field Data 01000 3.54PTFA
2Operating and Maintenance Instructions 01000 3.74PTFA
3Contractor Furnished Equipment List 01000 3.84PTFA
4Shop Drawings 01000 3.10 as Required by Technical Specifications4PS
5Start of Work Notification 01000 3.111PTSW
6Notice of Final Inspection 01000 3.121PTFI
7Construction Near Utility Systems 01000 3.131PTSW
8Utility Outage Notices 01000 3.141PTO
9Submittals 01000 3.154PSS
10Quality Control Plan 01000 3.18.24PTSW
11Quality Control Records 01000 3.18.41EWD
12Quality Control Submittals 01000 3.18.54PTSW
131354 Checklist (Property Inventory Checklist) 01000 3.194PTFI
14Nuclear Densometers 01000 3.214PTSW
15Identification of Employees 01001 1.1. A.4PTSW
16Waste Management Plan 01360 11.61PTFI
17Recovered Materials List 01360 12.31PTFI
18Recycled Material Report 01360 12.71PTFI
19Qualification Data 01732 1.54PTSW
20Contaminated Work Area Plan 02222, 3.2.A.4**21d PTSW
21Contaminated Areas Project Report, 02222, 3.34**15d PTFI
22SSHP, 02222, 5.3.B4**21d PTSW
23Logs, Reports & Record Keeping 02222, 5.3.C.4**AWC
24Submittals 02511, 1.3 Hot-Mix Asphalt444**15d ANTP
25Quality Assurance 02511, 1.4 Qualifications4**15d ANTP
26Submittals 02570, 1.2. Pre-Cast Manholes, Liftstations & Equipment44**15d ANTP
27Submittals 02570, 1.2.B Test Reports444*3d AWC
28Field Quality Control 02511 3.11 Test Reports444*3d AWC
29Submittal 02800, 1.2.A. Lab analysis4**15d ANTP
30Submittals, 02822, 1.6 Seeding, Sodding & Fertilizer4444**15d PTSW
31Submittals 03300, 1.3. Concrete4414**18 hours SN
32Masonry, 04200, 1.4. Materials, Product Data, Material Test Reports & Certification4444444**15d ANTP
33Structural Steel 05120, 1.3. Product Data & Shop Drawings4444**15d ANTP
34Joint Sealants, 07920, 1.4. Materials, Product Data, Material Test Reports & Certification4444444**15d ANTP
35Piping Fabrication 15060, 2.1.A.1. Welder Qualifications1**PTSW
36Supports, Anchors & Bases 15090, 1.4 B Equipment Submittals4444*15d ANTP
37Supports, Anchors & Bases 15090, 1.4 C Seismic Drawings4444*15d ANTP
38Insulation 15250, 1.1. Shop Drawings4**15d ANTP
39HTHW Piping System 15702, 1.4.B Shop Drawings44**15d ANTP
40HTHW Piping System 15702, 1.4.C Welder Certification1**15d ANTP
40HTHW Piping System 15702, 3.3.B. Cleaning Procedures4**14d PTSW
Schedule of Abbreviations:
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNT= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePT=Prior To
ACA= After Contract AwardPSS=Per Submittal Schedule

&L&"Times New Roman,Regular"&12Attachment 2&C&"Times New Roman,Regular"&12HTHW DISTRIBUTION PH 6 "AREA A"&R&"Times New Roman,Regular"&12FA4626-xx-R-xxxx &L&"Times New Roman,Regular"&12AF Form 66 02:

&F-&D&C&"Times New Roman,Regular"&12 SS-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it. Updated .