Vendor Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA462518Q0113,_Ack-Amd.pdf | ||
| 18Q0113_Atch_1_SOO_13_Sep_2018.pdf | ||
| 18Q0075_Atch_1_SOO_13_Sep_2018.pdf | ||
| 18Q0113_Atch_1_SOO_8Aug18.pdf | ||
| 18Q0113_Atch_3_Bldg_706_Floor_Plan.pdf | ||
| FA462518Q0113_Combo_4Sep18.pdf | ||
| 18Q0113_Atch_2_Clause_Full_Text_Info_9Aug18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Q: Do you have a TEMPEST requirement for EMI/RF emanations or do you only require a STC/Sound attenuation? The Statement of Objectives does mention both a TEMPEST and STC requirement. What level of RF attenuation and sound attenuation are you trying to achieve?
A: The room will have to be able to be accredited by DIA as a SCIF which require EMI/RF and STC attenuation. Requirement is to achieve an STC of 50 for amplified sound
2. Q: What are the electrical requirements for the SCIF?
A: Either 115 or 220 connection and all connections inside will be 115
3. Q: How many personnel/ work stations will the SCIF need to accommodate? Para 3.1.2.1 states 6 workstations, Para 3.1.4.1 states ten network drops. Can you provide a breakout of which drops go to which workstation?
A: Each of the workstation and the VTC area will have all networks (10 drops)
4. Q: What type of communication drops do you need at each work station – NIPR, SIPR, JWICS, SAR and spare. Please explain Table A4 Operational Floor Zone Box.
A: All will be fiber connections. One at each work station, and one central connection point to exit the facility.
5. Q: Are you bringing in fiber or Cat 6 Copper data lines? Are we to assume that unclassified will be copper and classified will be fiber?
A: All lines will be Fiber
6. Q: Will you require separation between classified and unclassified data lines? What is the separation requirement? Can you please explain the para 3.1.2.1 requirement for a Situational Awareness Wall?
A: The fiber separation is minimal.
7. Q: What type of Intrusion Detection System and/or Access Control System do you require?
A: SCIF’s have their own system which is called out to support their system.
8. Q: What are the HVAC requirements?
A: SCIF will get HVAC from the ducts within the facility.
9. Q: Will you require a fire suppression system?
A: Fire suppression will connect to the facility system
10. Q: Where is this SCIF going to be delivered / installed?
A: It will be delivered and installed to the 72TES vault in building 706
11. Will this SCIF be installed on a ground level floor?
A: Yes
12. Q: Do you have some sort of conceptual layout? The Statement of Objectives describes a server room, an operations floor and hallway. Please describe desired dimensions of each.
A: The SOW had a concept drawing approx. 20 X26 ft with a man trap doorway opening on the east side as installed in the facility.