16-R-0009_Atch_4 _Bid_Schedule_8_Apr_16.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Epoxy Flooring
Solicitation number
FA4625-16-R-0009
Issued by

About this file

16-R-0009 Atch 4 Bid Schedule 8 Apr 16

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Totals

PeriodTotal Price
Base Year (1 Jul 16 - 30 Jun 17)$0.00
Option Year 1 (1 Jul 17 - 30 Jun 18)$0.00
Option Year 2 (1 Jul 18 - 30 Jun 19)$0.00
Option Year 3 (1 Jul 19 - 30 Jun 20)$0.00
Option Year 4 (1 Jul 20 - 30 Jun 21)$0.00
GRAND TOTAL$0.00

FA4625-16-R-0009

Bid Schedule Totals

Attachment 4

Base Year

CLINDESCRIPTIONUNITQTY (EST)UNIT PRICEAMOUNT
0001Base Year
0002Gloss Epoxy/Urethane System 30 Mil DFTSF15,000$0.00
0003Power Trowel 1/4" OL High Traffic SystemSF4,000$0.00
0004Striping/signageSI40,000$0.00
0005ESD Coat add to CLIN AA or ABSF3,000$0.00
0006Moisture block coatingSF500$0.00
0007Epoxy Resin, Quartz AggregateSF1,000$0.00
0008Epoxy poured 4" wall baseLF500$0.00
0009Control Joint cutting and GroutingLF1,000$0.00
0010Concrete polishing and all polishing productsSF15,000$0.00
0011Remove tile, scrape adhesive, and prep floorSF10,000$0.00
0012Remove Epoxy Coating, prep floorSF8,000$0.00
0013Remove carpet, padding, scrape adhesive, prep floorSF4,000$0.00
Total Base Year$0.00

FA4625-16-R-0009

Bid Schedule Totals

Attachment 4

Option Year 1

CLINDESCRIPTIONUNITQTY (EST)UNIT PRICEAMOUNT
1001Option Year 1
1002Gloss Epoxy/Urethane System 30 Mil DFTSF12,000$0.00
1003Power Trowel 1/4" OL High Traffic SystemSF4,000$0.00
1004Striping/signageSI40,000$0.00
1005ESD Coat add to CLIN AA or ABSF3,000$0.00
1006Moisture block coatingSF500$0.00
1007Epoxy Resin, Quartz AggregateSF1,000$0.00
1008Epoxy poured 4" wall baseLF500$0.00
1009Control Joint cutting and GroutingLF1,000$0.00
1010Concrete polishing and all polishing productsSF12,000$0.00
1011Remove tile, scrape adhesive, and prep floorSF7,000$0.00
1012Remove Epoxy Coating, prep floorSF3,000$0.00
1013Remove carpet, padding, scrape adhesive, prep floorSF3,000$0.00
Total Option Year 1$0.00

FA4625-16-R-0009

Bid Schedule Totals

Attachment 4

Option Year 2

CLINDESCRIPTIONUNITQTY (EST)UNIT PRICEAMOUNT
2001Option Year 2
2002Gloss Epoxy/Urethane System 30 Mil DFTSF10,000$0.00
2003Power Trowel 1/4" OL High Traffic SystemSF3,500$0.00
2004Striping/signageSI30,000$0.00
2005ESD Coat add to CLIN AA or ABSF2,000$0.00
2006Moisture block coatingSF500$0.00
2007Epoxy Resin, Quartz AggregateSF750$0.00
2008Epoxy poured 4" wall baseLF500$0.00
2009Control Joint cutting and GroutingLF1,000$0.00
2010Concrete polishing and all polishing productsSF10,000$0.00
2011Remove tile, scrape adhesive, and prep floorSF5,000$0.00
2012Remove Epoxy Coating, prep floorSF3,000$0.00
2013Remove carpet, padding, scrape adhesive, prep floorSF3,000$0.00
Total Option Year 2$0.00

FA4625-16-R-0009

Bid Schedule Totals

Attachment 4

Option Year 3

CLINDESCRIPTIONUNITQTY (EST)UNIT PRICEAMOUNT
3001Option Year 3
3002Gloss Epoxy/Urethane System 30 Mil DFTSF5,000$0.00
3003Power Trowel 1/4" OL High Traffic SystemSF2,000$0.00
3004Striping/signageSI10,000$0.00
3005ESD Coat add to CLIN AA or ABSF1,000$0.00
3006Moisture block coatingSF500$0.00
3007Epoxy Resin, Quartz AggregateSF5,000$0.00
3008Epoxy poured 4" wall baseLF500$0.00
3009Control Joint cutting and GroutingLF300$0.00
3010Concrete polishing and all polishing productsSF5,000$0.00
3011Remove tile, scrape adhesive, and prep floorSF2,000$0.00
3012Remove Epoxy Coating, prep floorSF2,000$0.00
3013Remove carpet, padding, scrape adhesive, prep floorSF2,000$0.00
Total Option Year 3$0.00

FA4625-16-R-0009

Bid Schedule Totals

Attachment 4

Option Year 4

CLINDESCRIPTIONUNITQTY (EST)UNIT PRICEAMOUNT
4001Option Year 4
4002Gloss Epoxy/Urethane System 30 Mil DFTSF5,000$0.00
4003Power Trowel 1/4" OL High Traffic SystemSF2,000$0.00
4004Striping/signageSI10,000$0.00
4005ESD Coat add to CLIN AA or ABSF1,000$0.00
4006Moisture block coatingSF500$0.00
4007Epoxy Resin, Quartz AggregateSF5,000$0.00
4008Epoxy poured 4" wall baseLF500$0.00
4009Control Joint cutting and GroutingLF300$0.00
4010Concrete polishing and all polishing productsSF5,000$0.00
4011Remove tile, scrape adhesive, and prep floorSF2,000$0.00
4012Remove Epoxy Coating, prep floorSF2,000$0.00
4013Remove carpet, padding, scrape adhesive, prep floorSF2,000$0.00
Total Option Year 4$0.00

FA4625-16-R-0009

Bid Schedule Totals

Attachment 4

File details come from the government source that posted it. Updated .