The maximum contract value shall be $20M. The guaranteed minimum value of the contract shall be applied toward the first delivery order. The guaranteed minimum value is $50K.
Enter Prices in Section B and the Bid Schedule (Attachment 3) using the Microsoft Excel spreadsheet provided.
Reference Block 11. Performance periods will be negotiated on each delivery order.
SARAH B. GILLEM 660-687-4820
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
06-Apr-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______10 calendar days and complete it within ________ calendar days after receiving award, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________06 May 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
509 CONS/LGCA - FA4625
660 TENTH STREET, STE 222
WHITEMAN AFB MO 65305-5316
FA4625
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
660-687-7083FAX:TEL: 660-687-4291 TEL: FAX:
FA4625-16-R-0001 114
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.)
Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror)OFFER
FA4625-16-R-0001
Section A - Solicitation/Contract Form
GENERAL INFORMATION
Airfield Pavements
1. Please read this entire package. See Section L – Instructions, Conditions, and Notices to Bidders for the required contents for your proposal.
2. There will not be a site visit for this contract.
3. Please enter your CAGE Code, Tax Identification Number (TIN) and DUNS number in Block 14.
4. Please ensure you indicate the RFP number on the proposal envelope.
5. There is no minimum or maximum CLIN values.
6. The project magnitude is over $10,000,000.
7. Reference Block 11: Performance periods will be negotiated on each delivery order.
8. A separate Notice to Proceed (NTP) will be issued on each delivery/task order.
9. Each delivery/task order will be funded separately. A site visit will be held for each individual delivery/task order.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Airfield Pavements IDIQ - Base Year.
FFP
Base Year - 1 July 2016 - 30 June 2017. Provide all tools, machinery, and personnel to complete all associated work in accordance with the statement of work
(SOW) for Airfield Pavements.
FOB: Destination
NET AMT
0002 2,250 Square
Foot
Concrete Surface Repair
FFP
Concrete Surface Repair.
0003 3,500 Square
Spall Repair - Epoxy Bond PCC
Spall Repair - Epoxy Bond PCC.
0004 150,000 Linear
Joint Sealing
Joint Sealing.
0005 9,000 Each Repair Pop Outs
FFP
Repair Pop Outs.
0006 350 Each Dowel Bars 1.25" X 20"
FFP
Dowel Bars 1.25" X 20".
0007 350 Each Dowel Bars 1.25" X 20" Epoxyed
FFP
Dowel Bars 1.25" X 20" Epoxyed.
0008 500 Linear
Remove/Replace Striping All Affected
Remove/Replace Striping All Affected Areas.
0009 500 Linear
Remove/Replace Striping Reflective 36"
Remove/Replace Striping Reflective 36".
0010 1,000 Linear
Remove/Replace Striping Non-Reflective
Remove/Replace Striping Non-Reflective Black Border 6" Airfield.
0011 5,500 Linear
Reflective Striping Airfield Standard 6"
Reflective Striping Airfield Standard 6" (1-10,000 LF).
0012 2,500 Linear
Reflective Striping Airfield Standard 6"
Reflective Striping Airfield Standard 6" (>10,000 LF).
0013 5,500 Linear
Non-Reflective Black Border 6" Airfield
Non-Reflective Black Border 6" Airfield Striping (1-10,000 LF).
0014 5,500 Linear
Non-Reflective Black Border 6" Striping
Non-Reflective Black Border 6" Striping (>10,000 LF).
0015 15 Each Aircraft Tie Down Points
FFP
Aircraft Tie Down Points.
0016 15 Each Aircraft Ground Points
FFP
Aircraft Ground Points.
0017 5,250 Square
Yard
Slab Replacement per Ft Depth 750 Flex
Slab Replacement per Ft. Depth 750 Flex.
0018 5,250 Square
Portland Sub-Base Stabilization Course 8
Portland Sub-Base Stabilization Course 8".
0019 30 Each Core Drilling/Incl. Repair Hole 4"x2'
FFP
Core Drilling/Incl. Repair Hole 4" x 2 ' depth.
0020 5 Length Reinforced Concrete Pipe Rmv/Rplc 18"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 18" x Std. Length (0-6 ft.
depth).
0021 3 Length Reinforced Concrete Pipe Rmv/Rpl 24"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 24" x Std. Length (0-6 ft.
0022 5 Length Reinforced Concrete Pipe Rmv/Rpl 30-36"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 30-36" x Std. Length (0-6 ft.
0023 5 Length Reinforced Concrete Pipe Rmv/Rpl 48"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 48" x Std. Length (0-6 ft.
0024 3 Each Manhole/Area Inlet Cover Adj Elevation
FFP
Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' depth).
0025 1,000 Square
Groove Runway Slabs (1-1,500 sq. yd.)
Groove Runway Slabs )1-1,500 square yards).
0026 2,500 Square
Groove Runway Slabs (>1,500 sq. yd.)
Groove Runway Slabs (>1,500 square yards).
OPTION Airfield Pavements IDIQ - Option Year 1
FFP
Option Year 1 - 1 July 2017 - 30 June 2018. Provide all tools, machinery, and personnel to complete all associated work in accordance with the SOW for Airfield
Pavements.
1002 2,250 Square
OPTION Concrete Surface Repair
1003 3,500 Square
OPTION Spall Repair - Epoxy Bond PCC
1004 150,000 Linear
OPTION Joint Sealing
1005 9,000 Each OPTION Repair Pop Outs
FFP
1006 350 Each OPTION Dowel Bars 1.25" X 20"
FFP
1007 350 Each OPTION Dowel Bars 1.25" X 20" Epoxyed
FFP
1008 500 Linear
OPTION Remove/Replace Striping All Affected
1009 500 Linear
OPTION Remove/Replace Striping Reflective 36"
1010 1,000 Linear
OPTION Remove/Replace Striping Non-Reflective
1011 5,500 Linear
OPTION Reflective Striping Airfield Standard 6"
1012 2,500 Linear
1013 5,500 Linear
OPTION Non-Reflective Black Border 6" Airfield
1014 5,500 Linear
OPTION Non-Reflective Black Border 6" Striping
1015 15 Each OPTION Aircraft Tie Down Points
FFP
1016 15 Each OPTION Aircraft Ground Points
FFP
1017 5,250 Square
OPTION Slab Replacement per Ft Depth 750 Flex
1018 5,250 Square
OPTION Portland Sub-Base Stabilization Course 8
1019 30 Each OPTION Core Drilling/Incl. Repair Hole 4"x2'
FFP
1020 5 Length OPTION Reinforced Concrete Pipe Rmv/Rplc 18"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 18" x Std. Length (0-6 ft.
1021 3 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 24"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 24" x Std. Length (0-6 ft.
1022 5 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 30-36"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 30-36" x Std. Length (0-6 ft.
1023 5 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 48"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 48" x Std. Length (0-6 ft.
1024 3 Each OPTION Manhole/Area Inlet Cover Adj Elevation
FFP
1025 1,000 Square
OPTION Groove Runway Slabs (1-1,500 sq. yd.)
1026 2,500 Square
OPTION Groove Runway Slabs (>1,500 sq. yd.)
OPTION Airfield Pavements IDIQ - Option Year 2
FFP
Option Year 2 - 1 July 2018 - 30 June 2019. Provide all tools, machinery, and personnel to complete all associated work in accordance with the SOW for Airfield
2002 2,250 Square
2003 3,500 Square
2004 150,000 Linear
2005 9,000 Each OPTION Repair Pop Outs
FFP
2006 350 Each OPTION Dowel Bars 1.25" X 20"
FFP
2007 350 Each OPTION Dowel Bars 1.25" X 20" Epoxyed
FFP
2008 500 Linear
2009 500 Linear
2010 1,000 Linear
2011 5,500 Linear
2012 2,500 Linear
2013 5,500 Linear
2014 5,500 Linear
2015 15 Each OPTION Aircraft Tie Down Points
FFP
2016 15 Each OPTION Aircraft Ground Points
FFP
2017 5,250 Square
2018 5,250 Square
2019 30 Each OPTION Core Drilling/Incl. Repair Hole 4"x2'
FFP
2020 5 Length OPTION Reinforced Concrete Pipe Rmv/Rplc 18"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 18" x Std. Length (0-6 ft.
2021 3 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 24"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 24" x Std. Length (0-6 ft.
2022 5 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 30-36"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 30-36" x Std. Length (0-6 ft.
2023 5 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 48"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 48" x Std. Length (0-6 ft.
2024 3 Each OPTION Manhole/Area Inlet Cover Adj Elevation
FFP
2025 2,500 Square
OPTION Airfield Pavements IDIQ - Option Year 3
FFP
Option Year 3 - 1 July 2019 - 30 June 2020. Provide all tools, machinery, and personnel to complete all associated work in accordance with the SOW for Airfield
3002 2,250 Square
3003 3,500 Square
3004 150,000 Linear
3005 9,000 Each OPTION Repair Pop Outs
FFP
3006 350 Each OPTION Dowel Bars 1.25" X 20"
FFP
3007 350 Each OPTION Dowel Bars 1.25" X 20" Epoxyed
FFP
3008 500 Linear
3009 500 Linear
3010 1,000 Linear
3011 5,500 Linear
3012 2,500 Linear
3013 5,500 Linear
3014 5,500 Linear
3015 15 Each OPTION Aircraft Tie Down Points
FFP
3016 15 Each OPTION Aircraft Ground Points
FFP
3017 5,250 Square
3018 5,250 Square
3019 30 Each OPTION Core Drilling/Incl. Repair Hole 4"x2'
FFP
3020 5 Length OPTION Reinforced Concrete Pipe Rmv/Rplc 18"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 18" x Std. Length (0-6 ft.
3021 3 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 24"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 24" x Std. Length (0-6 ft.
3022 5 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 30-36"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 30-36" x Std. Length (0-6 ft.
3023 5 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 48"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 48" x Std. Length (0-6 ft.
3024 3 Each OPTION Manhole/Area Inlet Cover Adj Elevation
FFP
3025 1,000 Square
3026 2,500 Square
OPTION Airfield Pavements IDIQ - Option Year 3
FFP
Option Year 4 - 1 July 2020 - 30 June 2021. Provide all tools, machinery, and personnel to complete all associated work in accordance with the SOW for Airfield
4002 2,250 Square
4003 3,500 Square
4004 150,000 Linear
4005 9,000 Each OPTION Repair Pop Outs
FFP
4006 350 Each OPTION Dowel Bars 1.25" X 20"
FFP
4007 350 Each OPTION Dowel Bars 1.25" X 20" Epoxyed
FFP
4008 500 Linear
4009 500 Linear
4010 1,000 Linear
4011 5,500 Linear
4012 2,500 Linear
4013 5,500 Linear
4014 5,500 Linear
4015 15 Each OPTION Aircraft Tie Down Points
FFP
4016 15 Each OPTION Aircraft Ground Points
FFP
4017 5,250 Square
4018 5,250 Square
4019 30 Each OPTION Core Drilling/Incl. Repair Hole 4"x2'
FFP
4020 5 Length OPTION Reinforced Concrete Pipe Rmv/Rplc 18"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 18" x Std. Length (0-6 ft.
4021 3 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 24"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 24" x Std. Length (0-6 ft.
4022 5 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 30-36"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 30-36" x Std. Length (0-6 ft.
4023 5 Length OPTION Reinforced Concrete Pipe Rmv/Rpl 48"
FFP
Reinforced Concrete Pipe (RCP) Remove/Replace 48" x Std. Length (0-6 ft.
4024 3 Each OPTION Manhole/Area Inlet Cover Adj Elevation
FFP
4025 1,000 Square
4026 2,500 Square
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$50,000.00 $20,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
Section C - Descriptions and Specifications
STATEMENT OF WORK
See Attachment 1, Statement of Work, dated 9 July 2015.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
0009 Destination Government Destination Government
0010 Destination Government Destination Government
0011 Destination Government Destination Government
0012 Destination Government Destination Government
0013 Destination Government Destination Government
0014 Destination Government Destination Government
0015 Destination Government Destination Government
0016 Destination Government Destination Government
0017 Destination Government Destination Government
0018 Destination Government Destination Government
0019 Destination Government Destination Government
0020 Destination Government Destination Government
0021 Destination Government Destination Government
0022 Destination Government Destination Government
0023 Destination Government Destination Government
0024 Destination Government Destination Government
0025 Destination Government Destination Government
0026 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
1007 Destination Government Destination Government
1008 Destination Government Destination Government
1009 Destination Government Destination Government
1010 Destination Government Destination Government
1011 Destination Government Destination Government
1012 Destination Government Destination Government
1013 Destination Government Destination Government
1014 Destination Government Destination Government
1015 Destination Government Destination Government
1016 Destination Government Destination Government
1017 Destination Government Destination Government
1018 Destination Government Destination Government
1019 Destination Government Destination Government
1020 Destination Government Destination Government
1021 Destination Government Destination Government
1022 Destination Government Destination Government
1023 Destination Government Destination Government
1024 Destination Government Destination Government
1025 Destination Government Destination Government
1026 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2004 Destination Government Destination Government
2005 Destination Government Destination Government
2006 Destination Government Destination Government
2007 Destination Government Destination Government
2008 Destination Government Destination Government
2009 Destination Government Destination Government
2010 Destination Government Destination Government
2011 Destination Government Destination Government
2012 Destination Government Destination Government
2013 Destination Government Destination Government
2014 Destination Government Destination Government
2015 Destination Government Destination Government
2016 Destination Government Destination Government
2017 Destination Government Destination Government
2018 Destination Government Destination Government
2019 Destination Government Destination Government
2020 Destination Government Destination Government
2021 Destination Government Destination Government
2022 Destination Government Destination Government
2023 Destination Government Destination Government
2024 Destination Government Destination Government
2025 Destination Government Destination Government
3001 Destination Government Destination Government
3002 Destination Government Destination Government
3003 Destination Government Destination Government
3004 Destination Government Destination Government
3005 Destination Government Destination Government
3006 Destination Government Destination Government
3007 Destination Government Destination Government
3008 Destination Government Destination Government
3009 Destination Government Destination Government
3010 Destination Government Destination Government
3011 Destination Government Destination Government
3012 Destination Government Destination Government
3013 Destination Government Destination Government
3014 Destination Government Destination Government
3015 Destination Government Destination Government
3016 Destination Government Destination Government
3017 Destination Government Destination Government
3018 Destination Government Destination Government
3019 Destination Government Destination Government
3020 Destination Government Destination Government
3021 Destination Government Destination Government
3022 Destination Government Destination Government
3023 Destination Government Destination Government
3024 Destination Government Destination Government
3025 Destination Government Destination Government
3026 Destination Government Destination Government
4001 Destination Government Destination Government
4002 Destination Government Destination Government
4003 Destination Government Destination Government
4004 Destination Government Destination Government
4005 Destination Government Destination Government
4006 Destination Government Destination Government
4007 Destination Government Destination Government
4008 Destination Government Destination Government
4009 Destination Government Destination Government
4010 Destination Government Destination Government
4011 Destination Government Destination Government
4012 Destination Government Destination Government
4013 Destination Government Destination Government
4014 Destination Government Destination Government
4015 Destination Government Destination Government
4016 Destination Government Destination Government
4017 Destination Government Destination Government
4018 Destination Government Destination Government
4019 Destination Government Destination Government
4020 Destination Government Destination Government
4021 Destination Government Destination Government
4022 Destination Government Destination Government
4023 Destination Government Destination Government
4024 Destination Government Destination Government
4025 Destination Government Destination Government
4026 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-JUL-2016 TO
30-JUN-2017
N/A 509 CES - F4E3Z7
RA OFFICE
660 TENTH STE 206
WHITEMAN AFB MO 65305
660-687-6212
F4E3Z7
0002 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0011 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0012 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0013 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0014 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0015 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0016 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0017 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0018 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0019 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0020 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0021 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0022 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0023 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0024 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0025 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0026 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-JUL-2017 TO
30-JUN-2018
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1011 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1012 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1013 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1014 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1015 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1016 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1017 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1018 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1019 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1020 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1021 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1022 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1023 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1024 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1025 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1026 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-JUL-2018 TO
30-JUN-2019
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2011 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2012 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2013 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2014 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2015 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2016 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2017 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2018 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2019 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2020 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2021 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2022 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2023 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2024 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2025 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-JUL-2019 TO
30-JUN-2020
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3005 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3006 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3007 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3008 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3009 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3010 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3011 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3012 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3013 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3014 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3015 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3016 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3017 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3018 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3019 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3020 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3021 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3022 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3023 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3024 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3025 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3026 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-JUL-2020 TO
30-JUN-2021
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4004 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4005 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4006 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4007 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4008 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4009 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4010 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4011 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4012 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4013 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4014 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4015 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4016 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4017 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4018 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4019 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4020 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4021 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4022 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4023 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4024 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4025 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4026 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
Section G - Contract Administration Data
ADMINISTRATION DATA
G.1 ACCOUNTING AND APPROPRIATION DATA
Refer to block 23 of the SF 1442 (to be inserted upon award).
Accounting and appropriation data will be provided separately for each individual delivery order issued during the performance of this contract.
G.2 CONTRACT ADMINISTRATION
Contract Administration of any resultant contract will be performed by the following:
509 CONS/LGCA
660 Tenth Street, Suite 222
Whiteman AFB, MO 65305-5316
Telephone: (660) 687-5425
G.3 INVOICING AND PAYMENT
Payment will be made upon receipt of properly prepared invoices bearing the contract number and project number.
Invoices shall be submitted through Wide Area WorkFlow in accordance with DFARS 252.232-7006, Wide Area
WorkFlow Payment Instructions. Payment will be made by the pay office identified on each delivery order. All payments will be made in accordance with the Payments under Fixed-Price Construction Contracts clause; FAR
52.232-27 entitled Prompt Payment for Construction Contracts.
The following items are required for final invoice payment:
1) Final invoice
2) Release of claims
3) All certified payrolls including those for completion of punch list items
4) Warranty Letter
G.4 PAYMENT MADE BY AND SUBMISSION OF INVOICES
The Contractor shall submit original invoices for payment as prescribed in FAR 252.232-7003
Electronic Submission of Payment Request and Receiving Reports. Payment will be made by the pay office identified on each individual delivery order.
If the Contractor is unable to submit a payment in electronic form, the Contractor shall refer paragraph to (c) and (d) for submittal of non-electronic invoices. The Contractor shall submit original invoices for payment to the following address:
509 CONS/LGCA
660 Tenth Street, Suite 222
Whiteman AFB, MO 65305-5316
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015
52.203-14 Display of Hotline Poster(s) OCT 2015
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management JUL 2013
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
OCT 2015
52.204-13 System for Award Management Maintenance JUL 2013
52.204-18 Commercial and Government Entity Code Maintenance JUL 2015
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.211-10 Commencement, Prosecution, and Completion of Work APR 1984
52.211-12 Liquidated Damages--Construction SEP 2000
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.217-2 Cancellation Under Multiyear Contracts OCT 1997
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.219-8 Utilization of Small Business Concerns OCT 2014
52.219-14 Limitations On Subcontracting NOV 2011
52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014
52.222-7 Withholding of Funds MAY 2014
52.222-8 Payrolls and Basic Records MAY 2014
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination-Debarment MAY 2014
52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity APR 2015
52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-35 Equal Opportunity for Veterans OCT 2015
52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014
52.222-37 Employment Reports on Veterans FEB 2016
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015
52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug-Free Workplace MAY 2001
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.224-1 Privacy Act Notification APR 1984
52.224-2 Privacy Act APR 1984
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.228-2 Additional Bond Security OCT 1997
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014
52.228-14 Irrevocable Letter of Credit NOV 2014
52.228-15 Performance and Payment Bonds--Construction OCT 2010
52.229-4 Federal, State, And Local Taxes (State and Local
Adjustments)
FEB 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-17 Interest MAY 2014
52.232-23 Assignment Of Claims MAY 2014
52.232-27 Prompt Payment for Construction Contracts MAY 2014
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-37 Multiple Payment Arrangements MAY 1999
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Specifications and Drawings for Construction FEB 1997
52.236-26 Preconstruction Conference FEB 1995
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-4 Changes JUN 2007
52.243-5 Changes and Changed Conditions APR 1984
52.244-6 Subcontracts for Commercial Items DEC 2015
52.246-12 Inspection of Construction AUG 1996
52.246-21 Warranty of Construction MAR 1994
52.248-3 Value Engineering-Construction OCT 2015
52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7000 Disclosure Of Information AUG 2013
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A System for Award Management Alternate A FEB 2014
252.204-7006 Billing Instructions OCT 2005
252.204-7007 Alternate A, Annual Representations and Certifications JAN 2015
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting.
DEC 2015
252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
OCT 2015
252.223-7004 Drug Free Work Force SEP 1988
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013
252.225-7048 Export-Controlled Items JUN 2013
252.227-7000 Non-estoppel OCT 1966
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7004 DOD Progress Payment Rates OCT 2014
252.232-7010 Levies on Contract Payments DEC 2006
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.236-7005 Airfield Safety Precautions DEC 1991
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment DEC 2012
CLAUSES INCORPORATED BY FULL TEXT
52.216-18 ORDERING. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 1 July 2016 through 30 June 2021.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the
Schedule.
(End of clause)
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $1,000,000.00;
(2) Any order for a combination of items in excess of $3,000,000.00; or
(3) A series of orders from the same ordering office within five (5) days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal
Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the
Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within two (2) days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and
Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the last negotiated completion date of any delivery order issued during the term of the contract.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five
(5) years.
52.219-13 Notice of Set-Aside of Orders (Nov 2011)
The Contracting Officer will give notice of the order or orders, if any, to be set aside for small business concerns identified in 19.000(a)(3) and the applicable small business program. This notice, and its restrictions, will apply only to the specific orders that have been set aside for any of the small business concerns identified in 19.000(a)(3).
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting
Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
10% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to
Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Whiteman AFB, MO.
(End of provision)
52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS--PRICE ADJUSTMENT (NONE OR
SEPARATELY SPECIFIED METHOD) (MAY 2014)
(a) The wage determination issued under the Construction Wage Rate Requirements statute by the Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, that is effective for an option to extend the term of the contract, will apply to that option period.
(b) The Contracting Officer will make no adjustment in contract price, other than provided for elsewhere in this contract, to cover any increases or decreases in wages and benefits as a result of-- (1) Incorporation of the
Department of Labor's wage determination applicable at the exercise of the option to extend the term of the contract;
(2) Incorporation of a wage determination otherwise applied to the contract by operation of law; or
(3) An increase in wages and benefits resulting from any other requirement applicable to workers subject to the
Construction Wage Rate Requirements statute.
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (FEB 2016)
(a) Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.