Q A2.pdf

PDF 104 KB Posted

Attached to
Base Pavements IDIQ Federal contract opportunity
Solicitation number
FA4625-14-R-0001
Issued by
Department of the Air Force Global Strike Command

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: Is there a specification on the Typar Filter Cloth (Bid Item #A00T)? How is the (where) product going to be used?

A: Standard Geo-Textile fabric used in building road beds.

Q: Do you have any asphalt mix designs from previous contract? Mixes in specs are old MoDOT mixes which really are not used – Current MoDOT specifications will permit RAP (recycle asphalt)in mix designs – Will the CO allow for current MoDOT specifications to be used in developing mix designs which will permit (RAP)? Or will the mixes require on virgin materials?

A: Use latest MoDot Spec. RAP is allowable

Q: Is it correct that work will only be permitted M-F 7:30AM to 4:30PM – Can Saturday be used as a makeup day?

A: Yes, with prior coordination.

Q: What type of timeline can the contractor anticipate to receive approval on an excavation permit?

A: 7 Business days.

Q: Does the CO anticipate encountering rock excavation, and if so, how will it be paid?

A: There will be no rock excavation.

Q: Can the CO clarify what type backfill material will be available from borrow locations on the base (see paragraph 6 on 01010-3)? Will this include topsoil?

A: There are NO borrow locations on base. The contractor will SUPPLY fill/topsoil.

Q: Can the CO clarify what material is to be hauled off site to an approved landfill? Will it include all of asphalt (per bid item A002) or concrete pavement demo (A008 to A00B) OR will this material remain onsite?

A: All construction debris will be hauled off base EXCEPT the asphalt millings, they will remain the property of the Government.

Q: Can the CO provide any info on size of the Concrete Headwall (Index 250) per bid item A01D?

A: Figure average of 100 sq. ft. 1’ thick.

Q: Can the CO provide any info on the size of the concrete MH & curb inlets per bid items A013 & A014?

A: Standard 4’I.D.

Q: Can the CO clarify what is to be included in bid item A012 – Concrete and where it is be used? Is just for concrete material? What is the class of concrete?

A: Standard 3000 PSI concrete, and this line item includes all forming and placement costs.

Q: What is to be included in bid item A01F Adjust MH Elevation? Will it include rebuilding the cone section or MH top? Will the existing MH be brick or concrete?

A: Yes, it may include rebuilding, and may be either brick OR concrete.

Q: Is traffic control considered incidental (that is, no direct pay) to other work? Would the CO consider adding an item for traffic control (barricades, signage, etc)?

A: Traffic control is incidental to this type of work, and will NOT be a separate line item.

Q: Specifications include Section 02552 for Micro-Surfacing (see 01010-31) but there is not a bid item on the bid form? If it is required, how will it be paid?

A: Micro-surfacing not required.

Q: What percent of lime is be used in the lime treated subgrade (per bid item A00P)?

A: Will be determined on a delivery order basis, depending on the existing soils.