HWMS Amend 0001 w atchs.pdf
PDF 37 KB Posted
- Attached to
- Hazardous Waste Management Support Federal contract opportunity
- Solicitation number
- FA4621-08-R-0001
About this file
FA462108R0001 Amendment 0001 with attachments.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HWMS Preproposal Conf Minutes w atchs.pdf | ||
| Past Perform Questionnaire.doc | DOC document | |
| WD 2005-2215 Rev 7.pdf | ||
| WAWF Routing Sht.pdf | ||
| 1HW PWS 15 May Final for posting without FOUO Docs.pdf | ||
| HWMS Solicitation.pdf | ||
| Pre-Proposal Conference Notice.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate revisions to the PWS and to extend the solicitation offer due date as follow s:
A. Revise PWS paragraph 1.3.4. and Appendix C to clarify contractor responsibility: Replace PWS cover page, page 3, and Appendic C w ith the revised pages w hich are attached to this amendment.
B. Extend solicitation offer due date from 30 Jul 08 to 01 Aug 08.
See summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jul-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4621-08-R-0001
X 9B. DATED (SEE ITEM 11)
30-Jun-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jul-2008
CODE
22D CONTRACTING SQUADRON - FA4621
53147 KANSAS ST STE 102
MCCONNELL AFB KS 67221-3606
FA4621 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4621-08-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CHANGE TO PWS PARAGRAPH 1.3.4.
1. Paragraph 1.3.4. is changed to read:
1.3.4. The contractor shall ensure that no HW exceeds the 90 day storage limitation per 40 CFR 262.34(a) and satisfy all other applicable regulatory agency requirements. The contractor shall reimburse the government for any fines, legal or administrative fees caused by contractor violations of regulatory agency requirements.
2. Appendix C, under Supplies, add:
Office paper, quanity: as required.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 30-Jul-2008 04:00 PM to 01-Aug-
2008 04:00 PM.
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Performance Work
Statement
26 15-MAY-2008
Attachment 2 Wage Determination 2005-2215, Revision 7
11 26-JUN-2008
Attachment 3 Past Performance Questionnaire
Attachment 4 Wide Area Workflow Worksheet to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Performance Work 26 21-JUL-2008
FA4621-08-R-0001
Statement Attachment 2 Wage Determination
2005-2215, Revision 7
11 26-JUN-2008
Attachment 3 Past Performance Questionnaire
Attachment 4 Wide Area Workflow Worksheet
(End of Summary of Changes)
Solicitation FA4621-08-R-0001 Attachment 1 Hazardous Waste Management Support Amendment 01 i
PERFORMANCE WORK STATEMENT
FOR
HAZARDOUS WASTE MANAGEMENT SUPPORT
AT
McCONNELL AFB, KS
15 May 2008 Revised 21 July 2008
21 Jul 08 Revision changes the wording of paragraph 1.3.4. to clarify contractor responsibilities, and add office paper to the Government furnished supplies listed on Appendix C.
Solicitation FA4621-08-R-0001 Attachment 1 Hazardous Waste Management Support
1.3.3. The contractor shall prevent ignition or reaction of ignitable or reactive waste and exercise proper waste segregation. The contractor shall not consolidate or Lab-Pak waste without the approval of the
HWPM.
1.3.4. The contractor shall ensure that no HW exceeds the 90 day storage limitation per 40 CFR 262.34(a) and satisfy all other applicable regulatory agency requirements. The contractor shall reimburse | the government for any fines, legal or administrative fees caused by contractor violations of regulatory agency requirements.
1.4. Combat Arms Training Maintenance (CATM)
1.4.1. The contractor shall rotate/replace the eight (8) filters in the firing range dust collection vacuum system. Removal/replacement or rotation of the filters will be at the request of the 22 SFS/SFTC UEC who monitors the system’s gauges. See Appendix D for estimated workload data. Filters shall be removed from the dust collection unit and placed in the appropriate containers. Waste removal shall be in accordance with MAFBI 32-7002, Section 8 and this Performance Work Statement (PWS), Section 1.2.
1.4.2. Projectile residue buckets on the bullet trap system shall be inspected quarterly or upon request of the UEC, and emptied at the discretion of the contractor. The performance objective is to keep the bullet residue from accumulating to a point where its weight causes the bucket or its mount to break. See Appendix D for estimated workload data.
1.4.3. The contractor shall provide proper personal protective equipment (PPE for lead) and additional apparatuses necessary for the protection of the environment and personnel in accordance with 29 CFR
1910.1025. Inert certification of residue will be accomplished by the Combat Arms Training personnel.
1.5. Hazardous Waste Removal
Prior to removal of HW from the base to a TS&DF, the contractor shall prepare all required documents (DD Form 1348-1A, WPS or MSDS) as applicable for processing HW through DRMS or a designated, approved HW transport company, get HWPM approval, and transmit these required documents electronically to the designated location to ensure timely removal of the HW. The designated DRMO/DRMS or company will then arrange for removal of the HW from the HWSF. The contractor shall ensure that all paperwork is correct.
1.6. Waste Profile Sheets (WPS)
1.6.1. The contractor shall be responsible for maintaining and updating all WPS and shall conduct an annual review with the HWPM to determine analytical feasibility for waste re-characterization.
1.6.2. Contractor shall ensure that the work centers have the most current WPS on file. The contractor is responsible for creating a WPS when new waste streams are identified, then presenting the forms to the HWPM or his designated representative for approval. Only the HWPM or his designated representative can approve and sign the WPS, DD Form 1348-1A and Uniform HW Manifest.
Solicitation FA4621-08-R-0001 Attachment 1 Hazardous Waste Management Support
Page C-1
APPENDIX C
Government Furnished Facilities, Services, Equipment and Supplies
FACILITIES:
Bldg 1096, Office Space, approximately 100 square feet Bldg 1096, East & West Bay, 90-Day Storage, approximately 2400 square feet
EQUIPMENT:
Nomenclature Quantity Make/Model No. Serial No. /Stock No.
Fax machine w/phone 1 each Panasonic 8AAFB31984B Computer, hard drive 1 each Micron 1625669-001 Monitor, 17” Color 1 each MAG E7Y22315453U Printer, laser 1 each HP 2200N CNGSG12062 Printer, dot matrix 1 each Unisys 405155920 Scale, weighing 1 each Mettler 5075468-5FA Power Back-up 1 each APC AB0212326409R
SUPPLIES:
| Office paper As required HW Labels Pre-printed 3000 each Seaton SWL-1KR Aerosol Depressurizer 1 each AEROSOLV 0B-18446 (part no. Lab Safety) Filtration Unit 1 each AEROSOLV 0B-18447-2 (part no. Lab
Safety) Oil Filter Crusher 1 each OBERG MFG Model P3-100 Arlington WA
SPILL SUPPLIES:
Open Top Drum 2 each ASB Support DM 85 Open Top Drum 20 each ABS Support DM 55 Open Top Drum 20 each ABS support DF 55 Open Top Drum 10 each ABS Support DM 30 Close Top Drum 10 each ABS DM 55 Pig Mats (16"x20') 400 each PIG MAT-240 Pig Sox (42" long) 10 each PIG 404 Booms (10') 8 each PIG BOM-203 Lite-Dry (23' bag) 3 each PIG POP-201 Drum Dolly 1 each PIG DLY-303 Drum Wrench 1 each PIG DRM-315 Shovel (non-sparking) 2 each PIG TLS-281
SHARED RESOURCES:
Two other computers (CPU, monitor, key board, & mouse) are shared between the HW/HazMat Office and the contractor. For example, the computer used for the AF-EMIS is used by both the present contractor and AF personnel.
File details come from the government source that posted it. Updated .