Attachment 2 Project Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| RFI_2.pdf | ||
| RFI_1.pdf | ||
| Pavements_Amendment_0002.pdf | ||
| Pavements_Amendment_0001.pdf | ||
| Pavements_SOW_ver4.pdf | ||
| Atch_4_-_Finacial_Info_Request_-_14-R-0004.pdf | ||
| Atch_6_-_PPI_Tool_Instructions.pdf | ||
| Atch_5_-_Past_Performance_Information_Tool.accdb | — | |
| Atch_3_-_WD_WY43.pdf | ||
| Solicitation_FA4613-14-R-0004_Maintain_Base_Pavements.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
MAINTAIN BASE PAVEMENTS
PREPARED BY:
90THP
PCES/CEP
BASE CIVIL ENGINEERING SQUADRON
F.E. WARREN AIR FORCE BASE
9 JAN 2014
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
Attachment 2 - Project Specifications
Table of Contents
Section Starts On: Ends On:
100: General Provisions 100-1 100-38
200: Earthwork 200-1 200-10
300: Aggregate Materials 300-1 300-4
400: Pavements 400-1 400-28
500: NOT USED
600: Miscellaneous Construction 600-1 600-12
700: Traffic Control 700-1 700-10
800: Materials 800-1 800-11
Attachments (Bollard Drawings)
AF Form 66: Submittals
DD Form 1354 Worksheet
FA4613-14-R-0004
Division 100: General Provisions
Section 101
General Requirements
101.1 Scope
Provide all labor, materials including taxes, equipment, plant, means and operations necessary to maintain pavements at F.E. Warren AFB as specified in the statement of work, in strict compliance with these Specifications, applicable drawings, other attachments and the Terms and Conditions of the Contract. The Contractor is responsible for supplying and installing a turn-key fully functional, tested, and operational product meeting the performance requirements outlined by these Specifications and Drawings. Provide any special permits and licenses that may be required.
101.2 Description of Work
The work includes but is not necessarily limited to the following principal features:
1. Maintenance of all types of pavements at F.E. Warren AFB. The work may include but is not limited to: full pavement removal, milling, removal of curb and gutter, excavation and backfill, placing base course, placing new pavement, placing new curb and gutter, placing sidewalk, chip seals, striping, and re-vegetation.
2. Other related or incidental work as required to finish the project and provide a complete and operational project. All minor items of work that are manifestly necessary or customary shall be performed as if fully set forth and described on the Drawings and in the Specifications.
The Government shall undertake no work under this contract.
101.3 Government Furnished Property
All materials shall be furnished by the Contractor.
101.4 Operation of Project
The Contractor shall maintain safe access and egress for occupants and users of buildings at all times. Do not obstruct or close streets without authorization. When work is to be performed, maintain safe conditions for the adjacent buildings.
During the construction phase, the Contractor assumes responsibility for maintenance and operation of the project area until returned to control of the Government.
101.5 Existing Conditions
Field verify all existing conditions, existing construction, dimensions, quantities and other pertinent requirements prior to starting work activities. Immediately notify Contracting Officer in writing, of any discrepancies.
Do not obstruct or close roadways, sidewalks or exit ways without authorization.
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
101.6 Historic Artifacts
If historic or prehistoric deposits are encountered, stop work at that particular location and notify the Government immediately. Permission to resume work will be issued only after the find has been evaluated by a qualified archaeologist in accordance with Federal Law. No historic or prehistoric items shall be removed until the evaluation is complete. Items remain the property of the U.S. Government. Historic or prehistoric deposits include all items made or modified by man such as bottles, bricks, foundations, metal items, arrowheads, stone tools, etc. Individual items encountered during construction will not require a work stoppage but must be reported to the Government immediately.
101.7 Working Hours
Normal working hours for the Contractor will be 0730 to 1630 excluding Saturdays, Sundays, and Federal holidays. Notify the Government, in writing, three days in advance if work is desired during other time periods. If Inspectors will be available, a modified work period may be authorized. If Inspectors are required to work other than their normal duty/days solely for the benefit of the Contractor, the actual cost of inspections at overtime rates will be charged to the Contractor and an adjustment made to the contract price.
101.8 Discrepancies on Drawings
The Drawings are based on record drawings, surveys, on-site observations and field measurements made by the Government and others.
Check and compare all drawings immediately upon their receipt and notify the Government in writing of any discrepancies. Verify all dimensions and quantities shown and adequacy of available spaces prior to construction or ordering materials. Follow dimensions marked on drawings in lieu of scaled measurements.
101.9 Definitions
Use of certain phrases or words on the Drawings or Specifications has the following definitions:
1. The term “replace” means remove and dispose of existing material or item and furnish and install a similar new material or item that matches both the original material and remaining adjacent materials or items.
2. The term “reinstall” means remove existing material or item and reinstall same material or item properly aligned, plumb and secure to match existing adjacent materials or items.
3. The terms “provide” or “furnish” mean furnish and install unless otherwise indicated.
4. The term “Government” means the Contracting Officer.
5. The term “substantially complete” shall be defined by and is the sole determination of the
Contracting Officer.
101.10 Submittals
FA4613-14-R-0004
101.10.1 Progress Schedule
Submit a progress schedule on AF Form 3064 provided by the Government within 5-calendar days after notice to proceed.
101.10.2 Product Submittals
The following submittals need to be provided once per contract/supplier except the Contractor Quality Control Plan shall be resubmitted each option year or when the Superintendent or Quality Control Manager change in the organization.
Submittal Section Remarks License of Professional Land Surveyor 101.23 Materials Quality Control Plan 101.24 Hazardous Chemicals and Substances List 101.34 Safety Plan 101.37 Contractor Quality Control Plan 107.6 and 102.2 Aggregate Base Modified Proctor 301.4 Per ASTM D1557 Bituminous Pavement Mix Design 401.4.2 Portland Cement Concrete Mix Design 406.4.2 PCC Curb/Valley Pan/Sidewalk Mix Design 602.4 and 603.4 Sampling and Test Results for PCC Aggregate 803.2 Sampling and Test Results for Bituminous Aggregate
803.3 Virgin and RAP Aggregate
Blends
Sampling and Test Results for Chip Seal Aggregate
803.5
Sampling and Test Results for Slurry Seal Aggregate
404.1 and 404.4.5
Sampling and Test Results for Aggregate Base 803.8 Test Results for Bituminous Binder 804.1 Test Results for Bituminous Materials 804.2 Test Results for Joint Sealant 807 PVC, CMP, RCP Certificates of Compliance 808 Test Results and Certification for Striping 812 Paint and Retro-reflective
Beads
The following submittals need to be provided once per delivery order.
Submittal Section Remarks Traffic/Pedestrian Control Plan 101.25 As-Built Drawings 101.33 Recycled Material Use 101.38 Fill Material Modified Proctor Test Reports 203.4.1 Fill Compaction Density Test Reports 203.4.1 Backfill Material Modified Proctor Test Reports 204.4 Backfill Compaction Density Test Reports 204.4 Subgrade Modified Proctor Test Report 301.4
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
Subgrade Density Test Report 301.4 Aggregate Base Density Test Report 301.4 Aggregate Delivery Tickets 301.4 RipRap Gradation Test Report and Specific Gravity Certificate of Compliance
302.5
Bituminous Pavement Field and Lab Test Reports
401.4.6
Bituminous Pavement Delivery Tickets 401.4.7 PCC Field and Lab Test Reports 406.4.19 PCC Delivery Tickets 406.4.20 Certifications and Shop Drawings for Precast Concrete Structures
605.4.3
Provide submittals in accordance with Section 106, referenced sections, and the attached AF Form 66.
101.11 Materials
All materials to be installed including those concealed or covered shall be new (or recycled) unless otherwise indicated and of the most suitable and highest grade and type for the intended use unless otherwise indicated. They shall be produced by a manufacturer regularly engaged in manufacturing or fabricating similar products with a history of successful production acceptable to the Government.
The Contractor is encouraged to utilize other recycled products. Furthermore, the Contractor is also encouraged to recycle scrap materials generated during the project.
Verify that each specified finish material will be available for at least two years and that it is not scheduled to be nor is it already out of production. Otherwise notify the Government.
If any proposed usage or installation method does not comply with the recommendations or specifications of the manufacturer, notify the Government.
Protect materials during delivery, storage, handling and installation per manufacturer’s printed instructions. Place on blocking and cover when necessary to protect from water, dust, direct exposure to sunlight and other elements. Deliver in original containers or packaging with labels intact. Storage locations shall not interfere with work of other trades. Maintain temperature and humidity conditions in accordance with manufacturer’s recommendations.
101.12 Industry Standards
General Applicability of Standards: Applicable standards of the construction industry have the same force and effect (and are made a part of the contract documents when referenced) as if copied directly into contract documents, or as if published copies were bound herewith.
Standards apply only to the technical aspects of manufacturer, design and construction. No provision of any referenced standard, manual, or code shall change or increase the duties and responsibilities of the Government or the Contractor.
FA4613-14-R-0004
Reference standards (referenced directly in contract documents or by governing regulations) have precedence over non-referenced standards which are recognized industry for applicability to work.
Work under this project unless otherwise specified in this contract document or the issued delivery orders shall be in compliance with the Wyoming Department of Transportation (WYDOT) Standard Specifications for Road and Bridge Construction, with all published Standard Special Provisions, which are hereby incorporated by reference, in addition to the terms and conditions listed herein, including the attachments. For this project, the 2010 WYDOT Standard Specifications shall apply.
The Standard Specifications and Standard Special Provisions may be found at:
http://www.dot.state.wy.us/home/engineering_technical_programs/manuals_publications.html.
Also included in the above link is the Pavement Marking Manual, Signing Manual, and the Traffic Control for Roadway Work Operations which are incorporated for compliance to this project.
Engineering Details under this project unless otherwise specified in this contract document or the issued delivery orders shall be in compliance with the Wyoming Department of Transportation (WYDOT) Standard Plans which are hereby incorporated by reference, in addition to the terms and conditions listed herein, including the attachments. The Standard Plans may be found at:
32TUhttp://www.dot.state.wy.us/home/engineering_technical_programs/manuals_publications/standa rdplans.htmlU32T.
Publication Dates: Comply with standard in effect as of date of contract documents.
Copies of Standards: Provide where needed for proper performance of the work; obtain directly from publication sources.
101.13 Codes, Laws, and Regulations
Comply with the latest editions of the LIFE SAFETY CODE, INTERNATIONAL BUILDING CODE, UNIFORM MECHANICAL CODE, UNIFORM PLUMBING CODE and the NATIONAL ELECTRICAL CODE. Comply with the UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS). Comply with the AMERICANS WITH DISABILITIES ACT OF 1990 (ADA). Comply with the latest adopted FEDERAL, STATE, AND LOCAL LAWS and REGULATIONS that apply to this project.
The Contracting Officer is the only Government representative authorized to make alterations to this contract. Contractor assumes all liability and costs associated with construction changes that are not approved by the Contracting Officer in writing.
101.14 Safety Standards
Comply with requirements of the BASE SAFETY OFFICER for the protection of Air Force Personnel or Property.
MILITARY MUNITIONS: IN THE EVENT THE CONTRACTOR DISCOVERS OR UNCOVERS
MILITARY MUNITIONS AS DEFINED IN 40 CFR 260, THE CONTRACTOR SHALL
IMMEDIATELY STOP WORK IN THAT AREA AND IMMEDIATELY INFORM THE
CONTRACTING OFFICER.
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
Attachment 2 - Project Specifications http://www.dot.state.wy.us/home/engineering_technical_programs/manuals_publications/standardplans.html http://www.dot.state.wy.us/home/engineering_technical_programs/manuals_publications/standardplans.html
Comply with the rules, regulations, standards and requirements of the DEPT. OF DEFENSE, WYOMING DEPT. OF ENVIRONMENTAL QUALITY (DEQ), Environmental Protection Agency (EPA) AND Occupational Safety and Health Administration (OSHA) regarding disturbing or removing HAZARDOUS MATERIALS.
Comply with CORPS OF ENGINEERS SAFETY & HEALTH REQUIREMENTS MANUAL EM 385-1-1 (Oct 1992), OSHA STANDARDS, and DEPT. OF DEFENSE rules, regulations, standards and requirements regarding WORKING SAFETY.
Comply with WYOMING OCCUPATIONAL HEALTH and safety rules and regulations for construction.
Comply with OSHA Confined Space Entry requirements (Standards – 29 DFR), Part Number 1910, Subpart J General Environmental Controls, Standard 1910.146 App E regarding Sewer System Entry.
101.15 Work Site Access
The Contractor shall coordinate access to the Base for personnel and equipment with the Government. Pass and ID application process and instruction will be provided by the Contracting Officer at the pre-construction briefing.
101.16 Storage, Staging, and Parking
The long-term contractor storage and staging area request shall be submitted to the Contracting Officer. No sodded or landscaped areas or exit ways shall be used for storage, staging, or parking.
The Contract limit lines shall be the limits of Construction indicated on the Drawings or as approved by the Government.
101.17 Temporary Fueling Facility
A mobile fuel service shall be used for fueling vehicles and equipment. Temporary fueling facilities will not be used for this project.
101.18 Temporary Utilities
The Government will furnish temporary utilities (water, gas, electricity) to the Contractor at no cost from existing points of connections. All costs of making connections and extensions shall be paid by the Contractor. All temporary utilities shall be disconnected and removed at the end of the project.
101.19 Temporary Power and Lighting
The Contractor shall provide temporary power and lighting if required by the Contractor’s operation.
101.20 Temporary Sanitary Facilities
FA4613-14-R-0004
Provide and maintain temporary self-contained sanitary toilets at a location determined by the Government.
101.21 Temporary Fire Protection
Provide and maintain temporary fire extinguisher as determined adequate by the Base Fire Department.
101.22 Project Coordination, Supervision, and Construction Methods
The Contractor shall furnish one (1) onsite competent superintendent for the contract to manage all work. Each Subcontractor shall maintain a competent foreman or representative on the job when work is in progress. Together they shall cooperate and be responsible for the proper and timely layout, coordination, construction and completion of the work.
Each trade shall lie out and install its work at such time and manner to avoid delay or interference with other work. Anticipate and resolve conflicts before work begins. Submit questions to the Government or his/her authorized representative for resolution before proceeding with the work in question.
The Contractor is solely responsible for construction means, methods, techniques, sequences, procedures, fabrication processes, safety precautions, safety programs and other necessary precautions during construction. The Government will NOT assume responsibility for any of these.
101.23 Field Engineering
Provide services of a WYOMING LICENSED SURVEYOR to do construction staking and establish horizontal and vertical control elevations when necessary. Survey control is provided on the Site Layout Plans.
A copy of the surveyor’s license is a required submittal.
101.24 Materials Quality Control
The General Contractor shall provide the services of a testing laboratory (approved by the Government) to perform all field sampling, quality control testing and to submit written test reports to the Contracting Officer for each test defined by the Technical Specifications during construction (for earthwork, surfacing, paving, and concrete and utility work). Testing shall be coordinated with and accomplished in the presence of the Contracting Officer or his/her authorized representative. The testing laboratory and their methods outlining the Quality Control of materials of the contract will be a required submittal.
101.25 Barricades, Fencing, Warning Signs and Related Devices
Erect barricades, safety barriers, barrels, fencing, signs, warning lights, flag persons and devices as appropriate to control traffic and to warn and protect the workmen, users, occupants and the public. Comply with latest edition of U. S. Department of Transportation, Federal Highway Administration, MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. Coordinate barricades, warning signs and related devices with Government.
FA4613-14-R-0004
Submit traffic and pedestrian access control plan to Government for approval prior to construction. Plan shall address all phases of construction. This plan is a required submittal.
This submittal will include a computer generated drawing of the construction area and show the location of all traffic control devices. Construction traffic control must conform to the specifications in the most recent version of the MUTCD.
Coordinate with Fire Department (90 CES/CEF-307-773-2931) to assure that adequate egress is maintained.
101.26 Protection of Property
Protect the existing site, all materials and equipment to be incorporated therein, completed work, site improvements, trees, landscaping, utilities, public ways and other facilities. Promptly remedy all damage or loss thereto resulting from demolition or construction activities or operations under this contract. Restore equivalent to original conditions.
101.27 Shoring and Bracing
Install temporary shoring, bracing, and structural supports at existing and new structures and improvements as necessary to resist all loads including wind, snow, rain and temporary construction loads.
101.28 Welding, Cutting, and Brazing Permits
A permit is required for any welding, torch cutting, sweating, brazing or similar operation using an open flame. Make application of AF Form 592 through the Base Fire Department (90CES/CEF), Bldg. 324. Permits must be renewed each month. Fire extinguisher must be on hand during these operations and when a “Fire Watch” is posted.
101.29 Digging Permits and Excavation
A “Digging Permit” is required for all types of excavation, digging, and borings regardless of depth. Contractor shall make application on “Base Civil Engineering Work Clearance Request,” AF Form 103. Requests are submitted via the government Construction Inspector to 90 CES Customer Service in Bldg. 318. Permit requests should be submitted 14 calendar days prior to the planned excavation date. Permits must be renewed every 30 days.
The Contractor is responsible for providing the following to the government Contract Inspector when planning an excavation:
1. A drawing of the area of digging.
2. State the purpose of the digging.
3. Provide name, phone number, and organization of the Contractor point of contact.
4. Physically mark the actual digging site with white paint or flags. For trench excavation paint or flags at intervals necessary to clearly identify the trench lines is required. For large areas such as parking lots the perimeter of the area to be excavated should be clearly defined with white paint or flags.
Areas, which are clear of utilities, will simply be annotated “Clear” and signed by the locator.
Areas, which do have utilities, will be annotated “Utilities in area - call ext. _ to coordinate an on-site locate with the requestor,” and will be highlighted in fluorescent yellow. The Contract Inspector will coordinate on-site with each shop highlighted and get the locator’s signature.
Once all required areas are signed, the Contract Inspectors will return the permit to Customer
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
Service, Building 318, for approval signature. Once this is accomplished, the permit is valid and excavation may begin. The Contractor will not begin excavation until an approved digging permit is received from the Contract Inspector.
Notify the Contract Inspector prior to digging. If ground water or landfill debris is encountered, suspend digging and notify the Contract Inspector.
Exploratory digging by hand or vacuum is required within 5 feet of marked underground utilities.
Hand digging or vacuum excavation is required when crossing underground utilities. If digging is required parallel and within 10 feet of an existing utility, exploratory digging must be performed by hand or vacuum excavation until the location of the utility is physically confirmed.
After the location is physically confirmed digging may be performed by machine.
Exploratory potholes in roadway areas shall be restored using flow able fill mixture. In other areas native backfill material shall be used. The surface condition shall be restored to the pre-existing state.
101.30 Permits for Site Work and Utilities
Comply with National Pollutant Discharge Elimination System (NPDES) Regulations. NPDES regulations regulate storm water run-off. The NPDES Permit shall be coordinated throughout 90 CES/CEV, Bldg. 367, and (307) 773-4359. All costs associated with the NPDES Permit shall be at the Contractor’s expense.
101.31 Utility Service Interruptions and Road Closures
Notify the Government in writing at least two (2) weeks prior to the interruption of utility or communication services within the project area or to other base facilities. The Contractor will issue a verbal confirmation five (5) days prior to the interruption and shall allow 72 hours for preparation and to notify end users of the outage/interruption. If the outage is anticipated to be longer than four (4) hours, it shall be coordinated with the inspector, user, and support facilities to ensure the outage has minimal impact. Rescheduling of outage/interruption may be required if Government is unable to support it at the requested time and/or for the requested duration.
Road closure shall be coordinated with the Government, in writing, at least 7 days in advance of the desired closure date. Comply with required submittals outlined in Section 101.25.
The Contractor shall obtain written permission from the Government prior to any road closures.
101.32 Clean Up and Disposal
Remove all debris, waste and surplus materials from the immediate work areas each day and from the Base at suitable intervals determined by the contracting officer or his designated representative. Non-hazardous waste materials will not be stored on site or at the contractor staging area. Disposal shall be at an off-Base location at an established landfill or other site approved for the type of material being removed. There are no designated disposal areas on F.
E. Warren AFB. Burning or burial at the project site are not acceptable disposal methods.
Hazardous wastes must be properly characterized, manifested, transported and disposed in accordance with all local, state and federal regulations. For hazardous waste the following manifesting procedures must be followed: Copies of any hazardous waste manifests must be
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
routed through and signed by an authorized person in the Environmental Flight, 90 CES/CEAN.
72-hour advance notice is required for these wastes, prior to shipment. Notify the Base Hazardous Waste Manager at Bldg. 934, 307-773-4441 prior to transporting. Completed waste manifests must be signed, returned and received by the Base Hazardous Waste Manager indicating receipt of the shipment at the disposal site within 35 days of the shipment leaving the Base.
On completion of the project, leave the project including site and streets in a clean, sanitary, odor-free, acceptable condition, ready for occupancy. Hose down and broom all concrete slabs which are exposed. Use cleaning materials and procedures as recommended by the manufacturer of the surface being cleaned.
101.33 Record Drawings
Upon completion, submit to the Government a complete set of clean, undamaged record (as-built) drawings. Mark a set of the contract blueprints in a neat, orderly manner as the work progresses, showing changes in installation or project conditions including those changes resulting from amendments and contract modification. Use waterproof red pen or pencil. Give particular attention to concealed elements that would be difficult to measure and record at a later date. Give dimensions to fixed points.
101.34 Hazardous Materials
Contractor shall submit a Material Safety Data Sheets (MSDS) for each compound/chemical intended to be utilized on this project to the Base Bioenvironmental Flight (90 MDOS/SGOAB, 307-773-3088) for review and approval prior to delivery and use on the base. A hazardous material is defined in Federal Standard FED/STD-313C (Tables I and II). The definition of materials presenting a health hazard or physical hazard is found in 29 CFR 1910.1200(c). The MSDS shall be maintained on the job site and all workers shall familiarize themselves with their contents. The Contractor shall be responsible for establishing a system which tracks the procurement, delivery to site, installation and disposal of all hazardous materials including proper disposal documents. The Contractor shall submit a report prior to the commencement of construction on each delivery order (if necessary) to the Base Hazardous Waste Manager at Bldg. 934, 307-773-4441.
101.35 Use of Radioactive Materials
Prior to any radioactive materials being transported on Base, permission must be received from the Base Radiation Safety Officer (RSO) (90 MDOS/SGOAB, - 307-773-3088).
In order to receive the required approval, the following information is necessary:
1. A current copy of the applicable NRC agreement state license, Air Force Radioactive Materials Permit, if applicable, and the latest leak test (swipe sample) results.
2. A description of the proposed activities and applicable timelines. If a radioactive source is being used, provide the information on the Nuclear Regulatory Commission (NRC) Form 241. A complete description of the radiation source, e.g., activity level, power densities, power output, etc.
3. A copy of the section of the U.S. Air Force contract describing the work to be done, inclusive dates, and the specific secured, on-base, storage location where the radiation sources will be kept.
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
4. The organization’s health and safety procedures, names of responsible personnel authorized to operate equipment with copies of certified training certificates, and RSO phone numbers where they can be reached if questions arise.
5. An acknowledgement that the base RSO may make checks to ensure compliance with the organization’s radioactive material permit.
Once this information is received, the government will provide the requesting agency authorization for the outside organization to use the radiation sources on the installation or any sites associated with F. E. Warren AFB.
101.36 New Materials
All new materials used on this project shall be free of lead, PCB, Class I ODC and asbestos.
Where applicable, the Contractor shall comply with the requirements of FAR Part 25, Subpart
25.1 regarding the Buy American Act. This shall include the Defense Federal Acquisition Regulation Supplement Part 225, Subpart 225.1.
101.37 Project Safety
The Contractor is solely responsible for all safety on the project including, but not limited to, traffic control, trench, confined space entry, equipment and materials storage and compliance by all employees with Base Regulations. Particular care shall be exercised in connection with operation of vehicles and other equipment on the Base. Any damage to property or person as a result of the Contractor’s operations or personnel shall be remedied to the satisfaction of the Government. Project safety shall be coordinated with the Government prior to commencing construction. The Contractor shall designate a Safety Officer to the Government. The Safety Officer shall be knowledgeable with Federal, State, Local, and Base Safety Requirements. The Safety Officer shall be on the project site any time the Contractor has personnel on Base.
Contractor shall submit a Safety Plan prior to beginning work.
101.38 Recycled and Hazardous Material Use and Reporting
The Contractor must compile a report for each category of recycled materials purchased for the Resource Recovery and Recycling Manager upon completion of the delivery order. This itemized report must contain the following information: Total amount of material purchased, total amount purchased containing recycled materials, the written justifications, and the amount of construction waste recycled off base (i.e. removed concrete/asphalt, asphalt millings, etc.).
The report is to be issued as original, as well as 2 copies to the Contracting Officer.
To control Hazardous Materials used on F. E. Warren AFB, the Contractor will provide an MSDS for each chemical and/or compound intended for this contract to the base Bioenvironmental office (90 MDOS/SGOAB, 307-773-3088) for their inspection and approval prior to delivery to the F. E. Warren AFB. All hazardous materials shall be purchased on an “as needed” basis. The Contractor must compile a monthly issue report by the 5th day of the following month. The report must contain the following information: Nomenclature (description, brand name, part number, and SSL No.), unit of issue, quantity issued/used and person(s) issued to. The report is to be issued in an original and three (3) copies to the Contracting Officer each month. Additionally, each item of hazardous material issued and used in the performance of this contract shall be accompanied by a copy of the Material Safety Data Sheet (MSDS) and three (3) copies of the MSDS shall be provided to the Contracting Officer.
FA4613-14-R-0004
The Contractor shall evaluate each item furnished to the government or used during performance of services and identify all hazardous items. For the purpose of this standard, a hazardous material is defined as a material having one or more of the characteristics described in the Federal Standard FED-STD-313C (Tables I and II).
The item is a health hazard or physical hazard as defined in 29 CFR 1910.1200(c). Health hazards include carcinogens, corrosive materials, highly toxic materials, irritant, sensitizers, toxic materials, and materials which damage the skin, eyes or internal organs. Physical hazards include combustible liquids, compressed gases, explosives, flammable materials, organic peroxides, oxidizers, pyrophoric materials, unstable (reactive) materials and water-reactive materials.
101.39 Construction Exclusion Period
No excavation or backfill of utility trenches or structures shall be accomplished from November 1 to April 15. Any excavation or backfill activities started prior to November 1 shall be scheduled such that activities are completed by November 1. No trenches or excavations shall remain open after November 1. If permanent surfacing as required by other sections of this specification are not provided by winter exclusion date, temporary surfacing shall be provided and maintained so as not to form ruts, ponds or quagmires throughout the winter exclusion period.
101.40 Transfer and Acceptance of Military Real Property
Complete the Worksheet for DD Form 1354, “Transfer and Acceptance of Military Real Property.” Provide quantities under the AMOUNT column and installed cost information under the COST column for materials and systems applicable to this project. Submit Worksheet to the Base Contracting Office upon completion of the construction. See attached DD Form 1354 Worksheet. The DD Form 1354 itself will be completed by the Government.
Section 102 Summary of Work
102.1 Summary
Maintenance all types of pavements at FE Warren AFB are included in the contract. The work may include but is not limited to: full pavement removal, milling, removal of curb and gutter, excavation and backfill, placing base course, placing new pavement, placing new curb and gutter, placing sidewalk, chip seals, striping, and re-vegetation.
Other related or incidental work as required to finish the project and provide a complete and operational project. All minor items of work that are manifestly necessary or customary shall be performed as if fully set forth and described on the Drawings and in the Specifications.
102.2 Quality Control
Quality Control Program requirements shall exist to assure that work performed is in conformance with the requirements established by the drawings and this specification. QC Program criteria applicable to this scope of work are addressed in the Special Conditions and these specifications. A copy of the Contractors Quality Control Plan shall be submitted prior to work. The materials and equipment furnished by the Contractor shall be standard products of
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
manufacturers regularly engaged in the production of the type of materials and equipment required and shall be of the manufacturer’s latest standard designs. Where two or more units of the same type and class of material or equipment are required, the units shall be the product of the same manufacturer, and shall be identical insofar as possible.
102.3 Execution
Materials and equipment shall be erected or installed only by qualified personnel who are regularly engaged in the trades required to complete the work. The contract drawings show the general arrangement and space allocation of the equipment specified. It shall be the Contractor’s responsibility to verify changes in conditions or rearrangements necessary because of substitutions for specified materials or equipment. Where rearrangements are necessary the Contractor shall, before construction or installation, prepare and submit drawings of the proposed rearrangement for approval.
102.4 Coordination of Work
Where new work and existing facilities are shown on the drawings, but are not located precisely by dimensions, the Contractor shall be responsible for proper location and clearances and for correcting discrepancies and interferences in the work that are a result of his operations. Work done by one trade that must be integrated with work of other trades shall be laid out with due regard to the work done, or to be done, by other trades; particularly if the work done by one trade depends upon completion or proper installation of work done by other trades. The Contractor shall cooperate in coordinating his work with work being done by others if their work must be integrated with the Contractor’s work. The Contractor shall notify the Contracting Officer at least one week prior to starting of the date on which the Contractor proposes to proceed with the work.
102.5 Workmanship
Work shall be done in a skillful and workmanlike manner. The Contractor shall do structural cutting, fitting, patching, repairing and associated work necessary for installation of equipment, and electrical conduits, etc. No major cuts or holes, not shown on the drawings, shall be made without prior approval of the Contracting Officer. After the equipment is installed, exposed holes, cracks and other defects shall be neatly patched and the patched areas shall match the adjoining materials and finish.
102.6 Record Drawings
Maintain at the jobsite two sets of full-size contract drawings marked to show any deviations from the contract drawings including buried or concealed construction and utility features revealed during the course of construction.
Section 103 Environmental Protection
103.1 Environmental Compliance Requirements
FA4613-14-R-0004
The Contractor shall comply, and their subcontractors comply, with the most stringent environmental federal, state, and local laws and regulations; and Air Force policies, instructions, and plans.
The Contractor shall comply with all environmental regulations pertaining to all activities performed on F. E. Warren AFB that are subject to federal, state, and local laws and regulations including, but not limited to: National Environmental Policy Act (NEPA); Endangered Species Act; National Historic Preservation Act (NHPA); Archaeological Resources Protection Act (ARPA); Resource Conservation and Recovery Act (RCRA); Hazardous and Solid Waste Amendments; Pollution Prevention Act; Clean Water Act (CWA); Clean Air Act (CAA); Safe Drinking Water Act; Emergency Planning and Community Right to Know Act (EPCRA); and Toxic Substances Control Act (TSCA). The federal Government is not exempt from compliance with environmental regulations.
The Contractor shall coordinate all environmental regulatory agency environmental issues through the 90th Civil Engineer Squadron, Environmental Management Flight, 90 CES/CEV.
The 90 CES/CEV office is the single point of contact for all environmental regulatory agency issues for activities on F. E. Warren AFB.
The Contractor shall comply with all environmental permit conditions and consultation requirements. The agencies typically involved in F. E. Warren AFB activities include, but not limited to: U.S. Fish & Wildlife Service (USFWS); State Historic Preservation Officer (SHPO);
and Wyoming Department of Environmental Quality (WYDEQ).
103.2 Permits and Fees
No separate payment will be made for work covered under this section. The Contractor shall be responsible for payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor. All costs associated with this section shall be included in the contract price. The Contractor shall be responsible for payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations.
The Contractor shall be responsible for obtaining and complying with all environmental permits and commitments required by Federal, State, regional, and local environmental laws and regulations.
103.3 Air Quality
Equipment operation, activities, or processes performed by the Contractor shall be in accordance with all Federal and State air emission and performance laws and standards.
The Contractor is not allowed to burn material on base. The Contractor shall not operate a construction site or demolition project unless reasonable precautions are taken to control emissions of particulate matter. Such emissions of airborne particulate matter shall not exceed 20% opacity as defined in 40 CFR 60 Appendix A. The Contractor shall keep construction activities under surveillance and control to minimize environment damage by noise. The Contractor shall comply with the provisions of the State of Wyoming rules. The Contractor shall ensure activities performed under this contract are in compliance with the Air Force Policy on ODCs. The Contractor shall not purchase, use, nor specify the use of any Class I ODC in the production, design, or maintenance of the end item. Class II ODCs may be used or specified
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
only with the written approval of the Contracting Officer. ODCs are identified and classified in Air Force Instruction (AFl) 32-7080.
103.4 Water Resources and Storm Water Discharge
The Contractor shall monitor construction activities to prevent pollution of surface and ground waters. Toxic or hazardous chemicals shall not be applied to soil or vegetation unless otherwise indicated. The Contractor shall monitor all water areas affected by construction activities. For construction activities immediately adjacent to impaired surface waters, the Contractor shall be capable of quantifying sediment or pollutant loading to that surface water when required by State or Federally issued Clean Water Act permits.
The Contractor shall not discharge any contaminated materials into the storm drain system on Base. EPA authorizes the following non-storm water discharges: firefighting activities; fire hydrant flushing; potable water sources; irrigation drainage; lawn watering; routine building wash-down without detergents; pavement wash-waters where spills/leaks of toxic or hazardous materials have not occurred and where detergents are not used; air conditioning condensate;
springs; uncontaminated groundwater; and foundation/footing drains where flows are not contaminated with process materials such as hydrocarbons/solvents.
The Contractor shall not dump any restricted materials down the sanitary sewer or wastewater disposal system without approval of the Air Force. All discharges to the sewer shall meet Federal, State, and Local regulatory requirements and shall meet the permit requirements limiting F. E. Warren AFB discharges. The base sewer discharge is tested weekly by the City of Cheyenne for conformance requirements.
Restricted waste water materials include those that create a fire or explosion hazard; are toxic or poisonous; waters or wastes having a pH lower than 5.5 or higher than 9.0; solid or viscous substances that can obstruct the sewer flow; interfere with the biological activity of a treatment plant; inhibit biological activity by increasing the temperature; any fats, wax, grease, or oils in excess of 100 mg/I, total petroleum hydrocarbons in excess of 25 mg/I, noxious or malodorous liquids; contain metals in excess of iron-0.03 rog/I, chromium-5.676 mg/I, copper-4.985 mg/I, cyanide-0.505 mg/I, zinc-1.019 mg/I, arsenic-0.462 mg/I, cadmium-3.551 mg/I, lead-0.946 mg/I, mercury-0.028 mg/I, nickel-4.782 mg/I or silver-0.531 mg/I, F. E. Warren AFB's industrial permit allowable limits; contain phenols or dyes; are radioactive; that contain over 100 lbs. per day of total suspended solids (TSS) or five day biochemical oxygen demand (BOD) or cause the Base waste water discharge to exceed 200 mg/I BOD or 250 mg/I TSS.
For discharge of ground water, the Contractor shall meet all surface discharge requirements in accordance with the WYPDES or State Storm Water Discharges from Construction Sites permit.
Construction Activities-Storm water Discharge Permit - WYPDES General Permit for Storm Water Discharges Associated with Construction Activity is required for construction activity in which clearing, grading and excavation will result in disturbance of 1 acre or more of land. A completed Notice of Intent (NOI) package must be sent to the Wyoming Division of Environmental Quality (WDEQ) and consists of the following:
1. A Notice of Intent Form
2. A Storm Water Pollution Prevention Plan. This plan must meet the basic requirements of the SWPPP provided in Part IV of the General Permit.
3. Fees
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
4. The NOI package shall be routed through the Civil Engineer Squadron Environmental Flight (90 CES/CEAN) 10 days prior to construction start date.
5. The SWPPP must be maintained on the construction site.
6. A copy of the WDEQ approved SWPPP shall be submitted to the Contracting Officer
7. During construction the Contractor shall perform inspections as outlined in Part III of the
General Permit.
8. After the site has achieved final stabilization the Contractor will submit the Notice of
Termination.
The Contractor should reference the Wyoming Department of Environmental Quality's website at 32TUhttp://deq.state.wy.us/wqd/index.asp?pageid=125U32T for Notice of Intent Forms, instructions, SWPPP information, and other guidelines for complying with Wyoming storm water requirements.
103.5 Erosion, Sediment Controls, and Wetlands
The Contractor shall not enter, disturb, destroy, place fill into, or allow discharge of contaminants into any wetlands except as specifically authorized herein. The Contractor shall be responsible for the protection of wetlands on F. E. Warren AFB. Authorization to enter specific wetlands identified shall not relieve the Contractor from any obligation to protect other wetlands within, adjacent to, or in the vicinity of the construction site and associated boundaries.
Maps showing locations of wetlands within F. E. Warren AFB can be obtained from the 90
CES/CEAN.
The Contractor shall be responsible for providing erosion and sediment control measures in accordance with Federal, State, and local laws and regulations. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. The Contractor shall construct or install temporary and permanent erosion and sediment control best management practices (BMPs). BMPs may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. The Contractor's best management practices shall also be in accordance with the Base Storm Water Pollution Prevention Plan (SWPPP), which may be reviewed at the F. E. Warren AFB Environmental Office. Any temporary measures shall be removed after the area has been stabilized.
103.6 Toxics
The Contractor is responsible for ensuring that no employee is exposed to toxic materials like airborne asbestos, lead from lead base paint or polychlorinated biphenyls (PCB's).
No new asbestos containing materials shall be used or installed at any facilities under the jurisdiction of F. E. Warren AFB.
Paint and Paint Hazards - Existing Paint: Existing painted surfaces may contain lead based paint. The Contractor is responsible for ensuring that no employee is exposed to concentrations of lead in excess of the permissible exposure limit (PEL) equal to an eight hour time weighted average of 50 micrograms per cubic meter (:g/m3). The Contractor shall conform to all the requirements of 29 CFR 1926.62 Lead Exposure in Construction.
Maintain Base Pavements F.E. Warren AFB, Wyoming
FA4613-14-R-0004
Attachment 2 - Project Specifications http://deq.state.wy.us/wqd/index.asp?pageid=125
New-Paint Restriction - The Contractor shall not furnish or use any paints or coatings containing mercury or lead for interior or exterior applications. No oil-based paints or coatings are to be used on base unless the entire liquid material is applied to the intended surface. No oil based paint liquid is to be left for disposal by base personnel nor is any of this material to be improperly disposed of by the contractor. Use of environmentally safe water base paints and stains is recommended.
Polychlorinated Biphenyls (PCB's) - No PCB's or products containing PCB's shall be installed on F. E. Warren AFB.
103.7 Hazardous Materials Contractor Authorization Procedures
Contractors must obtain an authorization prior to bringing any hazardous materials (Federal Standard 313) on Air Force installations. Contractors must submit all required documentation including appropriate Material Safety Data Sheet (MSDS) and projected usage information to Bioenvironmental Engineering and 90 CES/CEAN through the contracting officer. This review is to ensure that no Air Force restricted hazardous materials are being proposed for use.
Following contract award, the Contractor will enter the HAZMAT authorization information i.e.
AF Form 3952 Chemical/Hazardous Material Request/Authorization Form information into the Environmental Management Information System (EMIS) using a HAZMART computer terminal.
This authorization requires 90th Civil Engineer approval. The Civil Engineer approval is for environmental and emergency response purposes only.
Contractors must also have their hazardous materials bar coded and at least weekly provide the HAZMART with specific usage data. The HAZMART ensures entry of the Contractor information into EMIS. This action includes the addition of the Contractor to the Authorized Unit Listing (AUL) by HAZMART. The Contractor shall maintain MSDS's for all hazardous materials used on base and the MSDS's shall be on file on site at the construction site office at all times. Prior to completion of the contract, provide a finalized report of the actual quantities used during the contract, remove excess materials and close out the HAZMART account. The Contractor shall submit all of the above data as a formal contract submittal.
103.8 Emergency Planning and Community Right-to-Know Act
In accordance with FAR 52.223-5 – Pollution Prevention and Right-To-Know Information, Contractors shall comply with the Toxic Release Inventory reporting provisions of EPCRA Section 313 by filing Form R reports during the life of the contract. Contractors shall provide a list of any extremely hazardous or hazardous substances listed under EPCRA along with maximum inventory and consumption. HAZMART registration fulfills this requirement.
Contractors shall provide this information to 90 CES/CEAN and HAZMART. Should the potential contractor not be subject to reporting under EPCRA, he shall certify as such. References:
Federal Register, August 10, 1995, Vol. 60, No. 154, p40987-40992 and Federal Register, September 29, 1995, Vol. 60, No. 189, p50737-50743.
103.9 Storage of Hazardous Materials
All hazardous materials used by the Contractor on base property shall be stored properly in…