17-1062B_Q&As_Answered_08142018.pdf
PDF 276 KB Posted
- Attached to
- 17-1062B, Inst Generator Air Traffic Cntrl Federal contract opportunity
- Solicitation number
- FA4610-18-R-0019
About this file
17-1062B Q&A's Answered 08142018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA461018R0019_Conformed_through_0003.pdf | ||
| FA461018R0019-0003.pdf | ||
| 17-1062B_airfield_drawings.pdf | ||
| 17-1062B_96L1E402-Layout1.pdf | ||
| 17-1062B_E200_AIRFIELD.PDF | ||
| 17-1062B_Q&As_Answered.pdf | ||
| 17-1062B_Generator_Authorization_and_Design_Approval_Request.PDF | ||
| FA461018R0019-0002.pdf | ||
| FA461018R0019_Conformed_through_0002.pdf | ||
| 17-1062B_Site_Visit_Sign_In.pdf | ||
| FA461018R0019_Conformed_through_0001.pdf | ||
| FA461018R0019-0001.pdf | ||
| 17-1062B_QC_Spec_01_44_00_Att_6.pdf | ||
| 17-1062B_SOW_27_Jun_18_Att_1.pdf | ||
| 17-1062B__Gen_Spec_01_00_00_02-Jan-2018_Att_3.pdf | ||
| FA461018R0019.pdf | ||
| 17-1062B_B1746-Layout_floor_plan_Att_2.pdf | ||
| CA180023_06152018_CA23_Att_5.pdf | ||
| 17-1062B_Env_Spec_01_57_20_Apr_2018_Att_4.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA461018R0019; XUMU 17-1062B, Replace Generator, Air Traffic Control
Questions and Answers
1. The SOW states in 3.6.1 #8 that as part of the design to perform and Environmental Survey but in section 2.6.3 it states if applicable. Does the government want a survey included in the cost? Do you have the most recent environmental site survey available?
Answer: If applicable contractor will perform environmental survey. Environmental compliances will provide any environmental surveys to the contractor of the building 1746-
1748 during their site investigation.
2. Due to space limitations and required code clearances, is it acceptable to install the generator outside in a weather proof enclosure? If so should the enclosure have sound attenuation?
Answer: Indoor generator is preferred, but a stainless steel enclosure with sound attenuation will be required if installed outside of existing building.
3. Does the Government want new GenSet need to have a base tank in lieu of the standalone diesel tank that is currently in place? See below as an example.
a.
Answer: Base tank is preferred. Contractor shall remove existing generator, existing ATS, and existing day tank.
4. What are the monitoring points on the existing generator and ATS by Base CE? By the facility monitoring system?
Answer: Alarms are received at CE’s DCC. Coordinate monitoring points with CE’s Alarm
Shop.
5. Can the government provide electrical and structural record drawings of buildings 1746 and
1748?
Answer: See attachments, no structural drawings available.
6. Is there an accurate single line drawing?
Answer: See attachments.
7. Can the Government provide current trends from the ATS over a 30 day period from the existing facility monitoring system?
Answer: Not available. the contractor needs to verify all information as part of your investigation.
(1) Load Study:
The purpose of this project is to provide the government with A-E services to design the installation of a new generator with auto-transfer switch to instantly restore power to the Air
Traffic Control Tower bldg 1748, airfield operations building 1746, and airfield lighting, and
AE must perform a load study to determine
• the total of all mission critical electrical loads
• the total of all loads for the buildings and airfield lighting
If the mission critical, NFPA, and NEC codes/standards required loads are 70% or more of the total load of the building, the generator may supply the entire building with power.
Contractor’s design must be able to provide data for blocks 10 through 22 and attachments for block 31 of the attached Generator Authorization and Design Approval Request.
8. Are all of the mission critical loads currently fed from the existing ATS?
Answer: Unknown, the contractor needs to verify all information as part of your survey.
9. The RFP requires the airfield lighting to be fed from the new emergency back-up system
(EBS); however, it was mentioned during the job walk that only the controls for them and not the lights themselves were to be fed from the EBS.
Answer: Yes only the controls need to be fed, but the contractor needs to verify all information as part of your survey.
10. At what voltage does the airfield lighting system operate?
Answer: 4160V.
11. How is the airfield lighting controlled and how is it fed?
Answer: It is a computer-controlled system from ADB Airfield Solutions, via a fiber cable connection between the Airfield lighting Vault and the Control Tower. Power feed comes from B1747 (Lighting Vault). Power for airfield lighting has a back-up generator in B1747.
12. Please provide the Generator Authorization and Design Approval Request mentioned in 2.2 of the SOW.
Answer: See attachments.
13. If existing NEC work space violations are present, is the Contractor required to correct those violations in the areas in which work is being performed?
Answer: Yes, contractor is expected to correct any NEC work space violations.
14. Section 2.6.2 states the Contractor is liable for performance issues, and validation of above and below grade condition assessment. If the ageing system has compromising points of failure that are out of scope, is the Contractor responsible for their performance affecting the overall system?
Answer: The Contractor is to provide the government with a complete engineering design, construction, and warranty for a new properly sized backup power generator with auto-transfer switch(s) to instantly restore power to the air traffic control tower (ATCT bldg
1748), airfield operations building (1746), and airfield lighting without intolerable surges during an outage of any length of time. During the verification of existing condition the
Contractor shall ensure all equipment, mechanical, electrical, architectural elements, etc.
meet all applicable codes, standards, etc
15. Due to the location of the generator, are there any access restrictions or processes. Is there any special training that needs to take place prior to accessing the area with equipment and vehicles?
Answer: Yes.
1. An EAL must be provided to the bldg. 1748 facility manager for all contractors that will be part of the installation. Airfield operating hours are 0800-1700L Monday-Friday, closed weekends and holidays. Work cannot be performed during airfield closures or Frame Light restrictions that are put in place prior to and during space launches.
2. Flight line driver training may be required for drivers of vehicles needing airfield access.
Contractor must contact the Airfield Management flight line driver program manager to determine if training is needed.
16. Is a temporary back-up generator required during the replacement of the existing generator?
Answer: Yes. We MUST have a temporary B/U generator in place with auto-changeover capability. Also, contractor must training all airfield operations personnel on operation of temporary generator in the event auto-change-over fails and our personnel must manually start the temp generator.
17. Is the new generator intended to use the existing battery charger and fuel station?
Answer: No. Contactor must install a new battery charging system and fuel tank.
18. The existing installation does not meet clearance and working spacerequirements, can the new ATS be relocated to different location?
Answer: Yes, but only as long as that ATS location is within the same room that the current/new generator currently/will reside. ATS and all current equipment that resides in current room MUST remain in same location and a waiver should be submitted for any space issues.