17-R-5001,_Attachment_02,_Painting,_Exhibit_A_Pricing_Schedule.pdf

PDF 97 KB Posted

Attached to
Base Wide Paint and Corrosion Control Federal contract opportunity
Solicitation number
FA4610-17-R-5001
Issued by
Department of the Air Force Space Command

About this file

17-R-5001, Attachment 02, Painting, Exhibit A_Pricing Schedule

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBLINE

ITEM TASK ESTIMATED

WORKLOAD

UNIT OF

MEASURE UNIT PRICE ESTIMATED AMOUNT

0001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 0001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 0001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 0001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -

0001AE Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600

SF

0001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 0001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 0001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 0001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 0001AK Block sealing. Par: 1.2.10 16,000 SF $ - 0001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 0001AM Coating, Rust Bond FC: 1.2.13.3 52,000 SF $ - 0001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 0001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 0001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 0001AQ Stucco repair. Par: 1.2.15 20 EA $ - 0001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 0001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 0001AT Directional arrows. Par: 1.3.3 30 EA $ - 0001AU Handicapped parking. Par: 1.3.4 25 EA $ - 0001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 0001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 0001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 0001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 0001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 0001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 0001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 0001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 0001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 0001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 0001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 0001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 0001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 0001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 0001BK Non priced items: Para. 1.7 5,000 SF $ -

$ - Basic Period Estimated Total

WORKLOAD

UNIT OF

MEASURE UNIT PRICE ESTIMATED AMOUNT

1001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 1001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 1001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 1001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -

1001AE Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600

SF

1001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 1001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 1001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 1001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 1001AK Block sealing. Par: 1.2.10 16,000 SF $ - 1001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 1001AM Coating, Rust Bond FC: 1.2.13.1 52,000 SF $ - 1001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 1001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 1001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 1001AQ Stucco repair. Par: 1.2.15 20 EA $ - 1001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 1001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 1001AT Directional arrows. Par: 1.3.3 30 EA $ - 1001AU Handicapped parking. Par: 1.3.4 25 EA $ - 1001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 1001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 1001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 1001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 1001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 1001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 1001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 1001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 1001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 1001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 1001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 1001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 1001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 1001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 1001BK Non priced items: Para. 1.7 5,000 SF $ -

$ - Estimated Total

WORKLOAD

UNIT OF

MEASURE UNIT PRICE ESTIMATED AMOUNT

2001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 2001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 2001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 2001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -

2001AE Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600

SF

2001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 2001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 2001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 2001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 2001AK Block sealing. Par: 1.2.10 16,000 SF $ - 2001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 2001AM Coating, Rust Bond FC: 1.2.13.1 52,000 SF $ - 2001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 2001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 2001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 2001AQ Stucco repair. Par: 1.2.15 20 EA $ - 2001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 2001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 2001AT Directional arrows. Par: 1.3.3 30 EA $ - 2001AU Handicapped parking. Par: 1.3.4 25 EA $ - 2001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 2001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 2001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 2001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 2001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 2001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 2001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 2001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 2001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 2001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 2001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 2001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 2001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 2001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 2001BK Non priced items: Para. 1.7 5,000 SF $ -

17-R-5001, Attachment 02 Exhibit A, Pricing Schedule

SUBLINE

ITEM TASK ESTIMATED

WORKLOAD

UNIT OF

MEASURE UNIT PRICE ESTIMATED AMOUNT

3001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 3001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 3001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 3001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -

3001AE Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600

SF

3001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 3001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 3001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 3001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 3001AK Block sealing. Par: 1.2.10 16,000 SF $ - 3001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 3001AM Coating, Rust Bond FC: 1.2.13.1 52,000 SF $ - 3001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 3001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 3001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 3001AQ Stucco repair. Par: 1.2.15 20 EA $ - 3001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 3001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 3001AT Directional arrows. Par: 1.3.3 30 EA $ - 3001AU Handicapped parking. Par: 1.3.4 25 EA $ - 3001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 3001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 3001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 3001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 3001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 3001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 3001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 3001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 3001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 3001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 3001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 3001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 3001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 3001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 3001BK Non priced items: Para. 1.7 5,000 SF $ -

WORKLOAD

UNIT OF

MEASURE UNIT PRICE ESTIMATED AMOUNT

4001AA Exterior protective coating, spot prime and one coat of finish. Par: 1.2.9.1 890,500 SF $ - 4001AB Second coat of finish, exterior. Par: 1.2.9.2 890,500 SF $ - 4001AC Contaminant testing and reports. Par: 1.2.9.3 15 EA $ - 4001AD Power wash exterior surfaces, wastewater discharged to grade. Par: 1.2.9.4 890,500 SF $ -

4001AE

Power wash exterior surfaces, full wastewater capture and containment./Disposal of wastewater at Vandenberg AFB IWTP/Disposal of wastewater at Vandenberg AFB CAP Par: 1.2.9.5 3,600 SF $ -

4001AF Wet scraping. Par: 1.2.9.6 3,500 SF $ - 4001AG Power tooling. Par: 1.2.9.7 5,500 SF $ - 4001AH Exterior bond prep. Par: 1.2.9.8 155,025 SF $ - 4001AJ Rust inhibiting primer. Par: 1.2.9.9 89,000 SF $ - 4001AK Block sealing. Par: 1.2.10 16,000 SF $ - 4001AL Elastomeric coating Par: 1.2.11 11,750 SF $ - 4001AM Coating, Rust Bond FC: 1.2.13.1 52,000 SF $ - 4001AN Coating, Carbomastic 15: 1.2.13.2 52,000 SF $ - 4001AO Coating, Carbomcrylic 3359DTM or Carbocrylic FC 1.2.13.3 52,000 SF $ - 4001AP Abrasive blast cleaning: Par 1.2.14 5,500 SF $ - 4001AQ Stucco repair. Par: 1.2.15 20 EA $ - 4001AR Basewide traffic striping. Par: 1.3.1 130,945 LF $ - 4001AS Parking lot striping. Par: 1.3.2 15,250 LF $ - 4001AT Directional arrows. Par: 1.3.3 30 EA $ - 4001AU Handicapped parking. Par: 1.3.4 25 EA $ - 4001AV Other traffic markings. Par: 1.3.5 7,500 SF $ - 4001AW Striping and marking of airfields & helipads. Par: 1.3.6 12,000 SF $ - 4001AX Interior protective coating, one coat of finish. Par: 1.4.3 78,125 SF $ - 4001AY Hospital interior, one coat of finish. Par: 1.4.4 1,000 SF $ - 4001AZ Bed and tape drywall surfaces. Par: 1.4.5 950 SF $ - 4001BA Apply texture, hand or machine. Par: 1.4.6 2,375 SF $ - 4001BB Prime interior walls. Par: 1.4.7 78,500 SF $ - 4001BC Patch holes in drywall up to one square foot each in size. Par: 1.4.8 30 EA $ - 4001BD Wallpaper removal. Par: 1.4.9 2,500 SF $ - 4001BE Epoxy coating. Par: 1.5.1 8,575 SF $ - 4001BF Urethane coating: Par. 1.5.2 8,575 SF $ - 4001BG Nonskid coating. Par: 1.5.3 3,000 SF $ - 4001BH Concrete floor layout and painting. Par: 1.5.4 600 LF $ - 4001BJ Work other than normal duty hours multiplier: Par. 1.6 2,010 SF $ - 4001BK Non priced items. 1.7 5,000 SF $ -

Option Yr. 3